{"data":{"id":"us/40-cfr-52.2270","jurisdiction":"us","citation":"40 CFR 52.2270","heading":"Identification of plan.","body":"(a) Purpose and scope. This section sets forth the applicable State Implementation Plan (SIP) for Texas under section 110 of the Clean Air Act, 42 U.S.C. 7410, and 40 CFR part 51 to meet national ambient air quality standards.\n(b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to December 31, 1998, were approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after December 31, 1998, will be incorporated by reference in the next update to the SIP compilation.\n(2) EPA Region 6 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of December 31, 1998.\n(3) Copies of the materials incorporated by reference may be inspected at https://www.epa.gov/sips-tx or the Environmental Protection Agency, Region 6, 1201 Elm Street, Suite 500, Dallas, Texas 75270-2102. If you wish to obtain material from the EPA Regional Office, please call (800) 887-6063 or (214) 665-2760.\n(c) EPA approved regulations.\nEPA Approved Regulations in the Texas SIP\nState citation Title/Subject State approval/Submittal date EPA approval date Explanation\nChapter 19—Electronic Reporting\nSubchapter A—General Provisions\nSection 19.1 Definitions 2/7/2007 July 23, 2010, 75 FR 43062\nSection 19.3 Applicability 2/7/2007 July 23, 2010, 75 FR 43062\nSubchapter B—Electronic Reporting Requirements\nSection 19.10 Use of Electronic Document Receiving System 2/7/2007 July 23, 2010, 75 FR 43062\nSection 19.12 Authorized Electronic Signature 2/7/2007 July 23, 2010, 75 FR 43062\nSection 19.14 Enforcement 2/7/2007 July 23, 2010, 75 FR 43062\nChapter 39—Public Notice\nSubchapter H—Applicability and General Provisions\nSection 39.402 Applicability to Air Quality Permits and Permit Amendments 6/2/2010 10/6/2015, 80 FR 60296 SIP includes 39.402 (a)(1)-(a)(6), (a)(8), (a)(11), and (a)(12).\nSection 39.405 General Notice Provisions 8/25/2021 8/24/2023, 88 FR 57884\nSection 39.407 Mailing Lists 9/2/1999 1/6/2014, 79 FR 551\nSection 39.409 Deadline for Public Comment, and Requests for Reconsideration, Contested Case Hearing, or Notice and Comment Hearing 6/2/2010 1/6/2014, 79 FR 551\nSection 39.411 Text of Public Notice 4/22/2020 8/24/2023, 88 FR 57884\nSection 39.412 Combined Notice for Certain Greenhouse Gases Permit Applications 8/25/2021 8/24/2023, 88 FR 57884\nSection 39.418 Notice of Receipt of Application and Intent to Obtain Permit 8/25/2021 8/24/2023, 88 FR 57884\nSection 39.419 Notice of Application and Preliminary Decision 8/25/2021 8/24/2023, 88 FR 57884\nSection 39.420 Transmittal of the Executive Director's Response to Comments and Decisions 4/22/2020 8/24/2023, 88 FR 57884\nSection 39.426 Alternative Language Requirements 8/25/2021 8/24/2023, 88 FR 57884\nSubchapter K—Public Notice of Air Quality Applications\nSection 39.601 Applicability 4/22/2020 8/24/2023, 88 FR 57884\nSection 39.602 Mailed Notice 8/25/2021 8/24/2023, 88 FR 57884\nSection 39.603 Newspaper Notice 4/22/2020 8/24/2023, 88 FR 57884\nSection 39.604 Sign-Posting 8/25/2021 8/24/2023, 88 FR 57884\nSection 39.605 Notice to Affected Agencies 6/2/2010 1/6/2014, 79 FR 551\nChapter 55—Requests for Reconsideration and Contested Case Hearings; Public Comment\nSubchapter E—Public Comment and Public Meetings\nSection 55.150 Applicability 6/14/2006 1/6/2014, 79 FR 551\nSection 55.152 Public Comment Period 5/9/2018 7/12/2019, 84 FR 33173 SIP includes 55.152(a)(1), (a)(2), (a)(3), (a)(4), (a)(7), (a)(8) and (b).\nSection 55.154 Public Meetings 8/25/2021 8/24/2023, 88 FR 57884\nSection 55.156 Public Comment Processing 8/25/2021 8/24/2023, 88 FR 57884\nChapter 101—General Air Quality Rules\nSubchapter A—General Rules\nSection 101.1 Definitions 7/6/2016 6/8/2017, 82 FR 26598\nSection 101.2 Multiple air Contaminant Sources or Properties 4/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7).\nSection 101.3 Circumvention 4/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7).\nSection 101.4 Nuisance 4/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7).\nSection 101.5 Traffic Hazard 4/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7).\nSection 101.8 Sampling 12/11/73 1/27/82, 47 FR 03767 Ref 52.2299(c)(33).\nSection 101.9 Sampling Ports 04/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7).\nSection 101.10 Emissions Inventory Requirements 7/6/2016 6/8/2017, 82 FR 26598\nSection 101.13 Use and Effect of Rules 4/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7).\nSection 101.14 Sampling Procedures and Terminology 4/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7).\nSection 101.18 Remedies Cumulative 4/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7).\nSection 101.19 Severability 4/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7).\nSection 101.20 Compliance with Environmental Protection Agency Standards 05/09/75 07/26/85 6/1/77, 42 FR 27894 06/24/92, 57 FR 28093 Rule 23 Ref, 52.2299(c)(10) Section 101.20(3), Ref 52.2299(c)(73). (1) and (2) NOT IN SIP.\nSection 101.21 The National Primary and Secondary Air Quality Standards 05/09/75 6/1/77, 42 FR 27894 Ref 52.2299(c)(10).\nSection 101. Rule 16 Invoking Jurisdiction 4/13/73 6/22/73, 38 FR 16568 Ref 52.2299(c)(7). Not in current Texas General Rules.\nSection 101. Rule 19 Initiation of Review 4/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7). Not in current Texas General Rules.\nSubchapter B—Failure to Attain Fee\nSection 101.100 Definitions 5/22/2013 2/14/2020, 85 FR 8426\nSection 101.101 Applicability 5/22/2013 2/14/2020, 85 FR 8426\nSection 101.102 Equivalent Alternative Fee 5/22/2013 2/14/2020, 85 FR 8426\nSection 101.104 Equivalent Alternative Fee Accounting 5/22/2013 2/14/2020, 85 FR 8426\nSection 101.106 Baseline Amount Calculation 5/22/2013 2/14/2020, 85 FR 8426\nSection 101.107 Aggregated Baseline Amount 5/22/2013 2/14/2020, 85 FR 8426\nSection 101.108 Alternative Baseline Amount 5/22/2013 2/14/2020, 85 FR 8426\nSection 101.109 Adjustment of Baseline Amount 5/22/2013 2/14/2020, 85 FR 8426\nSection 101.110 Baseline Amount for New Major Stationary Source, New Construction at a Major Stationary Source, or Major Stationary Sources with Less Than 24 Months of Operation 5/22/2013 2/14/2020, 85 FR 8426\nSection 101.113 Failure to Attain Fee Obligation 5/22/2013 2/14/2020, 85 FR 8426\nSection 101.116 Failure to Attain Fee Payment 5/22/2013 2/14/2020, 85 FR 8426\nSection 101.117 Compliance Schedule 5/22/2013 2/14/2020, 85 FR 8426\nSection 101.118(a)(1) and (a)(3) Cessation of Program 5/22/2013 2/14/2020, 85 FR 8426 SIP does not include 101.118(a)(2) or 101.118(b).\nSection 101.120 Eligibility for Equivalent Alternative Obligation 5/22/2013 2/14/2020, 85 FR 8426\nSection 101.121 Equivalent Alternative Obligation 5/22/2013 2/14/2020, 85 FR 8426\nSection 101.122 Using Supplemental Environmental Project to Fulfill an Equivalent Alternative Obligation 5/22/2013 2/14/2020, 85 FR 8426\nSubchapter F—Emissions Events and Scheduled Maintenance, Startup, and Shutdown Activities\nDivision 1—Emissions Events\nSection 101.201 Emissions Event Reporting and Recordkeeping Requirements 3/26/2014 11/10/2014, 79 FR 66626 101.201(h) is not in the SIP.\nDivision 2—Maintenance, Startup, and Shutdown Activities\nSection 101.211 Scheduled Maintenance, Startup, and Shutdown Reporting and Recordkeeping Requirements 1/23/06 11/10/10, 75 FR 68989 101.211(f) is not in the SIP.\nDivision 3—Operational Requirements, Demonstrations, and Actions to Reduce Excessive Emissions\nSection 101.221 Operational Requirements 1/23/06 11/10/10, 75 FR 68989\nSection 101.222 Demonstrations 1/23/06 11/10/10, 75 FR 68989 The SIP does not include 101.222(h), 101.222 (i), and 101.222 (j). See section 52.2273(e).\nSection 101.223 Actions to Reduce Excessive Emissions 1/23/06 11/10/10, 75 FR 68989\nSection 101.224 Temporary Exemptions During Drought Conditions 8/21/02 03/30/05, 70 FR 16129\nDivision 4—Variances\nSection 101.231 Petition for Variance 08/21/02 03/30/05, 70 FR 16129\nSection 101.232 Effect of Acceptance of Variance or Permit 08/21/02 03/30/05, 70 FR 16129\nSection 101.233 Variance Transfers 08/21/02 03/30/05, 70 FR 16129\nSubchapter H—Emissions Banking and Trading\nDivision 1—Emission Credit Program\nSection 101.300 Definitions 09/20/2017 12/7/2017, 82 FR 57679\nSection 101.301 Purpose 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.302 General Provisions 09/20/2017 12/7/2017, 82 FR 57679\nSection 101.303 Emission Reduction Credit Generation and Certification 09/20/2017 12/7/2017, 82 FR 57679\nSection 101.304 Mobile Emission Reduction Credit Generation and Certification 09/20/2017 12/7/2017, 82 FR 57679\nSection 101.305 Emission Reductions Achieved Outside the United States 10/4/2006 5/18/10, 75 FR 27647\nSection 101.306 Emission Credit Use 4/22/2020 8/24/2023, 88 FR 57884\nSection 101.309 Emission Credit Banking and Trading 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.311 Program Audits and Reports 11/10/04 9/6/06, 71 FR 52698\nDivision 2—Emissions Banking and Trading of Allowances\nSection 101.330 Definitions 12/16/1999 1/3/2011, 76 FR 16.\nSection 101.331 Applicability 12/16/1999 1/3/2011, 76 FR 16.\nSection 101.332 General Provisions 12/16/1999 1/3/2011, 76 FR 16.\nSection 101.333 Allocation of Allowances 08/09/2000 1/3/2011, 76 FR 16.\nSection 101.334 Allowance Deductions 12/16/1999 1/3/2011, 76 FR 16.\nSection 101.335 Allowance Banking and Trading 12/16/1999 1/3/2011, 76 FR 16.\nSection 101.336 Emission Monitoring, Compliance Demonstration, and Reporting 12/16/1999 1/3/2011, 76 FR 16.\nSection 101.338 Emission Reductions Achieved Outside the United States 10/4/2006 1/3/2011, 76 FR 16.\nSection 101.339 Program Audits and Reports 10/4/2006 1/3/2011, 76 FR 16.\nDivision 3—Mass Emissions Cap and Trade Program\nSection 101.350 Definitions 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.351 Applicability 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.352 General Provisions 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.353 Allocation of Allowances 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.354 Allowance Deductions 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.356 Allowance Banking and Trading 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.357 Use of Emission Reductions Generated from the Texas Emissions Reduction Plan (TERP) 3/13/2002 5/11/2017, 82 FR 21925\nSection 101.359 Reporting 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.360 Level of Activity Certification 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.363 Program Audits and Reports 09/26/01 11/14/01, 66 FR 57252\nDivision 4—Discrete Emission Credit Program\nSection 101.370 Definitions 09/20/2017 12/7/2017, 82 FR 57679\nSection 101.371 Purpose 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.372 General Provisions 09/20/2017 12/7/2017, 82 FR 57679\nSection 101.373 Discrete Emission Reduction Credit Generation and Certification 09/20/2017 12/7/2017, 82 FR 57679\nSection 101.374 Mobile Discrete Emission Reduction Credit Generation and Certification 09/20/2017 12/7/2017, 82 FR 57679\nSection 101.375 Emission Reductions Achieved Outside the United States 10/4/2006 5/18/2010, 75 FR 27644\nSection 101.376 Discrete Emission Credit Use 09/20/2017 12/7/2017, 82 FR 57679\nSection 101.378 Discrete Emission Credit Banking and Trading 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.379 Program Audits and Reports 6/3/2015 5/11/2017, 82 FR 21925\nDivision 6—Highly Reactive Volatile Organic Compound Emissions Cap and Trade Program\nSection 101.390 Definitions 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.391 Applicability 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.392 Exemptions 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.393 General Provisions 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.394 Allocation of Allowances 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.396 Allowance Deductions 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.399 Allowance Banking and Trading 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.400 Reporting 6/3/2015 5/11/2017, 82 FR 21925\nSection 101.401 Level of Activity Certification 4/6/2010 1/2/2014, 79 FR 57\nSection 101.399 Allowance Banking and Trading 12/01/04 9/6/06, 71 FR 52659\nSection 101.400 Reporting 12/1/4 9/6/06, 71 FR 52659\nSection 101.401 Level of activity certification 2/1/4 9/6/06, 71 FR 52659\nSection 101.403 Program audits and reports 12/01/04 9/6/06, 71 FR 52659\nDivision 7—Clean Air Interstate Rule\nSection 101.503 Clean Air Interstate Rule Oxides of Nitrogen Annual Trading Budget 7/12/06 7/30/07, 72 FR 41453\nSection 101.504 Timing Requirements for Clean Air Interstate Rule Oxides of Nitrogen Allowance Allocations 07/12/06 07/30/, 72 FR 41453 Subsections 101.504(a)(2), 101.504(a)(3), 101.504(a)(4), 101.504(c), and 101.504(d) NOT IN SIP.\nSection 101.506 Clean Air Interstate Rule Oxides of Nitrogen Allowance Allocations 07/12/06 07/30/, 72 FR 41453 Subsections 101.506(a)(2), 101.506(b)(2), 101.506(b)(3), and 101.506(g) NOT IN SIP.\nSection 101.508 Compliance Supplement Pool 07/12/06 07/30/07, 72 FR 41453\nChapter 106—Permits by Rule\nSubchapter A—General Requirements\nSection 106.1 Purpose 08/09/00 11/14/03, 68 FR 64548\nSection 106.2 Applicability 3/26/2014 11/10/2014, 79 FR 66626\nSection 106.4 Requirements for Permitting by Rule 3/26/2014 11/10/2014, 79 FR 66626 The SIP approved provisions at 30 TAC Section 106.4(a)(1), (a)(3), and (a)(4) are those adopted by the State as of 4/20/2011.\nSection 106.6 Registration of Emissions 11/20/02 11/14/03, 68 FR 64548\nSection 106.8 Recordkeeping 10/10/01 11/14/03, 68 FR 64548\nSection 106.13 References to Standard Exemptions and Exemptions from Permitting 08/09/00 11/14/03, 68 FR 64548\nSubchapter B—Registration Fees for New Permits by Rule\nSection 106.50 Registration Fees for Permits by Rule 9/25/2002 3/20/2009, 74 FR 11851.\nChapter 111 (Reg 1)—Control of Air Pollution from Visible Emissions and Particulate Matter\nSubchapter A: Visible Emissions and Particulate Matter\nDivision 1: Visible Emissions\nSection 111.111(a), (b) Requirements for Specified Sources 6/18/1993 5/8/1996, 61 FR 20732\nSection 111.111(c) Requirements for Specified Sources 10/25/1991 1/18/1994, 59 FR 2532\nSection 111.113 Alternative Opacity Limitations 6/16/1989 5/8/1996, 61 FR 20732\nDivision 2: Incineration\nSection 111.121 Single-Chamber Incineration 6/16/1989 4/28/2009, 74 FR 19144\nDivision 4: Materials Handling, Construction, Roads, Streets, Alleys, and Parking Lots\nSection 111.141 Geographic Areas of Application and Date of Compliance 10/25/1991 1/18/1994, 59 FR 02532\nSection 111.143 Materials Handling 6/16/1989 1/18/1994, 59 FR 02532\nSection 111.145 Construction and Demolition 10/25/1991 1/18/1994, 59 FR 02532\nSection 111.147 Roads, Streets, and Alleys 1/25/2012 12/14/2015, 80 FR 77254\nSection 111.149 Parking Lots 6/16/1989 1/18/1994, 59 FR 02532\nDivision 5: Emission Limits on Nonagricultural Processes\nSection 111.151 Allowable Emissions Limits 6/16/1989 4/28/2009, 74 FR 19144\nSection 111.153 Emission Limits for Steam Generators 6/16/1989 4/28/2009, 74 FR 19144\nDivision 6: Emission Limits on Agricultural Processes\nSection 111.171 Emission Limits Based on Process Weight Method 6/16/1989 4/28/2009, 74 FR 19144\nSection 111.173 Emissions Limits Based on Alternate Method 6/16/1989 4/28/2009, 74 FR 19144\nSection 111.175 Exemptions 6/16/1989 4/28/2009, 74 FR 19144\nDivision 7: Exemptions for Portable or Transient Operations\nSection 111.181 Exemption Policy 6/16/1989 4/28/2009, 74 FR 19144\nSection 111.183 Requirements for Exemptions 6/16/1989 4/28/2009, 74 FR 19144\nSubchapter B: Outdoor Burning\nSection 111.201 General Prohibitions 8/21/1996 4/28/2009, 74 FR 19144\nSection 111.203 Definitions 7/7/2017 4/27/2018, 83 FR 18430\nSection 111.205 Exceptions for Fire Training 8/21/1996 4/28/2009, 74 FR 19144\nSection 111.207 Exceptions for Fires Used for Recreation, Ceremony, Cooking, and Warmth 8/21/1996 4/28/2009, 74 FR 19144\nSection 111.209 Exception for Disposal Fires 10/22/2021 2/7/2023, 88 FR 7882\nSection 111.211 Exception for Prescribed Burn 1/15/2014 1/11/2017, 82 FR 3172\nSection 111.213 Exception for Hydrocarbon Burning 8/21/1996 4/28/2009, 74 FR 19144\nSection 111.215 Executive Director Approval of Otherwise Prohibited Outdoor Burning 8/21/1996 4/28/2009, 74 FR 19144\nSection 111.217 Requirements for Certified and Insured Prescribed Burn Managers 7/7/2017 4/27/2018, 83 FR 18430\nSection 111.219 General Requirements for Allowable Outdoor Burning 8/21/1996 4/28/2009, 74 FR 19144\nSection 111.221 Responsibility for Consequences of Outdoor Burning 8/21/1996 4/28/2009, 74 FR 19144\nChapter 112 (Reg 2)—Control of Air Pollution From Sulfur Compounds\nSection 112.1 Definitions 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76).\nSection 112.2 Compliance, Reporting, and Recordkeeping 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76).\nSection 112.3 Net Ground Level Concentrations 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76).\nSection 112.4 Net Ground Level Concentrations—Exemption Conditions 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76).\nSection 112.5 Allowable Emission Rates—Sulfuric Acid Plant Burning Elemental Sulfur 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76).\nSection 112.6 Allowable Emission Rates—Sulfuric Acid Plant 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76).\nSection 112.7 Allowable Emission Rates—Sulfur Recovery Plant 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76).\nSection 112.8 Allowable Emissions Rates from Solid Fossil Fuel-Fired Steam Generators 09/18/92 02/18/97, 62 FR 07163 Ref 52.2299(c)(101).\nSection 112.9 Allowable Emission Rates—Combustion of Liquid Fuel 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76).\nSection 112.14 Allowable Emission Rates—Nonferrous Smelter Processes 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76).\nSection 112.15 Temporary Fuel Shortage Plan Filing Requirements 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76).\nSection 112.16 Temporary Fuel Shortage Plan Operating Requirements 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76).\nSection 112.17 Temporary Fuel Shortage Plan Notification Procedures 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76)\nSection 112.18 Temporary Fuel Shortage Plan Reporting Requirements 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76)\nSection 112.19 Application for Area Control Plan 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76)\nSection 112.20 Exemption Procedure 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76)\nSection 112.21 Allowable Emission Rates Under Area Control Plan 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76)\nSection 112.41 to 112.47 Control of Sulfuric Acid 05/12/89 NOT in SIP but is a part of the EPA approved Texas 111(d) Plan\nSection 112.51 to 112.59 Control of Total Reduced Sulfur (TRS) 05/12/89 NOT in SIP but is a part of the EPA approved Texas 111(d) Plan.\nChapter 114 (Reg 4)—Control of Air Pollution from Motor Vehicles\nSubchapter A—Definitions\nSection 114.1 Definitions 12/18/2023 4/8/2025, 90 FR 15122\nSection 114.2 Inspection and Maintenance Definitions 12/18/2023 4/8/2025, 90 FR 15122\nSection 114.5 Transportation Planning Definition 05/03/00 12/5/02, 67 FR 72382\nSection 114.6 Low Emission Fuel Definitions 8/22/12 5/6/13, 78 FR 26255\nSubchapter C—Vehicle Inspection and Maintenance; Low Income Vehicle Repair Assistance, Retrofit, and Accelerated Vehicle Retirement Program; and Early Action Compact Counties\nDivision 1: Vehicle Inspection and Maintenance\nSection 114.50 Vehicle Emissions Inspection Requirements 12/18/2023 4/8/2025, 90 FR 15122 Subsection 114.50(b)(2) is NOT part of the approved SIP.\nSection 114.51 Equipment Evaluation Procedures for Vehicle Gas Analyzers 11/18/2010 7/25/2014, 79 FR 43264\nSection 114.53 Inspection and Maintenance Fee 12/18/2023 4/8/2025, 90 FR 15122\nDivision 3: Early Action Compact Counties\nSection 114.80 Applicability 11/17/04 8/8/05, 70 FR 45542\nSection 114.81 Vehicle Emissions Inspection Requirements 11/17/04 8/8/05, 70 FR 45542\nSection 114.82 Control Requirements 12/18/2023 4/8/2025, 90 FR 15122\nSection 114.83 Waivers and Extensions 2/12/2014 10/7/2016, 81 FR 69684\nSection 114.84 Prohibitions 2/12/2014 10/7/2016, 81 FR 69684\nSection 114.85 Equipment Evaluation Procedures for Vehicle Exhaust Gas Analyzers 11/17/04 8/8/05, 70 FR 45542\nSection 114.87 Inspection and Maintenance Fees 4/29/2015 10/7/2016, 81 FR 69684\nSubchapter D—Oxygen Requirements for Gasoline\nSection 114.100 Oxygenated Fuels 1/20/2017 2/27/2018, 83 FR 8361\nSubchapter G—Transportation Planning\nSection 114.260 Transportation Conformity 6/27/2007 11/12/2014, 79 FR 67071\nSection 114.270 Transportation Control Measures 6/27/2007 1/31/2014, 79 FR 5287\nSubchapter H—Low Emission Fuels\nDivision 1: Gasoline Volatility\nSection 114.301 Control Requirements for Reid Vapor Pressure 4/25/00 4/26/01, 66 FR 20931 Part (c) is not approved.\nSection 114.305 Approved Test Methods 1/20/2017 2/27/2018, 83 FR 8361\nSection 114.306 Recordkeeping Requirements 4/25/2000 4/26/2001, 66 FR 20927 Not in SIP: 114.306(c)\nSection 114.307 Exemptions 9/10/2014 7/20/2015, 80 FR 42732\nSection 114.309 Affected Counties 9/10/2014 7/20/2015, 80 FR 42732\nDivision 2: Low Emission Diesel\nSection 114.312 Low Emission Diesel Standards 8/22/12 5/6/13, 78 FR 26255\nSection 114.313 Designated Alternative Limits 8/22/12 5/6/13, 78 FR 26255\nSection 114.314 Registration of Diesel Producers and Importers 8/22/12 5/6/13, 78 FR 26255\nSection 114.315 Approved Test Methods 8/22/12 5/6/13, 78 FR 26255\nSection 114.316 Monitoring, Recordkeeping, and Reporting Requirements 8/22/12 5/6/13, 78 FR 26255\nSection 114.317 Exemptions to Low Emission Diesel Requirements 8/22/12 5/6/13, 78 FR 26255\nSection 114.318 Alternative Emission Reduction Plan 8/22/12 5/6/13, 78 FR 26255\nSection 114.319 Affected Counties and Compliance Dates 8/22/12 5/6/13, 78 FR 26255\nSubchapter I—Non-Road Engines\nDivision 3—Non-Road Large Spark-Ignition Engines\nSection 114.420 Definitions 4/19/00 11/14/01, 66 FR 57222\nSection 114.421 Emission Specifications 12/06/00 11/14/01, 66 FR 57222\nSection 114.422 Control Requirements 4/19/00 11/14/01, 66 FR 57222\nSection 114.427 Exemptions 4/19/00 11/14/01, 66 FR 57222\nSection 114.429 Affected Counties and Compliance Schedules 12/6/00 11/14/01, 66 FR 57222\nSubchapter J—Operational Controls for Motor Vehicles\nDivision 2: Locally Enforced Motor Vehicle Idling Limitations\nSection 114.510 Definitions 11/17/04 4/11/05, 70 FR 18308\nSection 114.511 Applicability 11/17/04 4/11/05, 70 FR 18308\nSection 114.512 Control Requirements for Motor Vehicle Idling 7/20/2011 7/25/2014, 79 FR 43264\nSection 114.517 Exemptions 8/8/2012 7/25/2014, 79 FR 43264\nSubchapter K—Mobile Source Incentive Programs\nDivision 3: Diesel Emissions Reduction Incentive Program for On-Road and Non-Road Vehicles\nSection 114.620 Definitions 4/4/2018 10/4/2018, 83 FR 50021\nSection 114.621 Applicability 1/28/04 08/19/05, 70 FR 48647\nSection 114.622 Incentive Program Requirements 6/10/2020 5/27/2021, 86 FR 28496\nSection 114.623 Small Business Incentives 4/4/2018 10/4/2018, 83 FR 50021\nSection 114.624 Rebate Grant Process 9/20/2006 4/9/2010, 75 FR 18061\nSection 114.626 Monitoring, Recordkeeping, and Reporting Requirements 8/22/01 08/19/05, 70 FR 48647\nSection 114.629 Affected Counties and Implementation Schedule 6/10/2020 5/27/2021, 86 FR 28496\nDivision 4: Texas Clean School Bus Program\nSection 114.640 Definitions 3/26/2014 6/9/2017, 82 FR 26756\nSection 114.642 Applicability 3/26/2014 6/9/2017, 82 FR 26756\nSection 114.644 Clean School Bus Program Requirements 3/26/2014 6/9/2017, 82 FR 26756\nSection 114.646 Monitoring, Recordkeeping, and Reporting Requirements 3/26/2014 6/9/2017, 82 FR 26756\nSection 114.648 Expiration 3/26/2014 6/9/2017, 82 FR 26756\nDivision 5: Texas Clean Fleet Program\nSection 114.650 Definitions 4/4/2018 10/4/2018, 83 FR 50021\nSection 114.651 Applicability 4/4/2018 10/4/2018, 83 FR 50021\nSection 114.652 Qualifying Vehicles 4/4/2018 10/4/2018, 83 FR 50021\nSection 114.653 Grant Eligibility 4/4/2018 10/4/2018, 83 FR 50021\nSection 114.654 Usage and Disposition 3/28/2012 1/31/2014, 79 FR 5287\nSection 114.655 Grant Restrictions 2/24/2010 1/31/2014, 79 FR 5287\nSection 114.656 Eligible Grant Amounts 4/9/2014 6/9/2017, 82 FR 26756\nSection 114.657 Reporting Requirements 2/24/2010 1/31/2014, 79 FR 5287\nSection 114.658 Implementation Schedule 2/24/2010 1/31/2014, 79 FR 5287\nDivision 8: Drayage Truck Incentive Program\nSection 114.680 Definitions 4/4/2018 10/4/2018, 83 FR 50021\nSection 114.681 Applicability 4/4/2018 10/4/2018, 83 FR 50021\nSection 114.682 Eligible Vehicle Models 4/4/2018 10/4/2018, 83 FR 50021\nSection 114.680 Definitions 8/3/2016 6/9/2017, 82 FR 26756\nSection 114.681 Applicability 4/9/2014 6/9/2017, 82 FR 26756\nSection 114.682 Eligible Vehicle Models 8/3/2016 6/9/2017, 82 FR 26756\nTexas Department of Transportation Regulation—31 TAC Chapter 17—Vehicle Titles and Registration\nSection 17.80 Vehicle Emissions Verification System 11/09/93 08/22/94, 59 FR 43046 Ref 52.2299 (c)(87)(i)(F).\nTexas Department of Public Safety—37 TAC Chapter 23—Vehicle Inspection\nSection 23.93 Vehicle Emissions Inspection Requirements 10/26/2005 7/25/2014, 79 FR 43264\nChapter 115 (Reg 5)—Control of Air Pollution From Volatile Organic Compounds\nSubchapter A—Definitions\nSection 115.10 Definitions 3/4/2020 3/23/2026, 91 FR 13747\nSubchapter B—General Volatile Organic Compound Sources\nDivision 1: Storage of Volatile Organic Compounds\nSection 115.110 Applicability and Definitions 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.111 Exemptions 3/4/2020 3/23/2026, 91 FR 13747\nSection 115.112 Control Requirements 3/4/2020 3/23/2026, 91 FR 13747\nSection 115.113 Alternate Control Requirements 12/1/2011 9/9/2014, 79 FR 53302\nSection 115.114 Inspection Requirements 12/15/2016 4/30/2019, 84 FR 18150\nSection 115.115 Monitoring Requirements 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.116 Testing Requirements 12/1/2011 9/9/2014, 79 FR 53302\nSection 115.117 Approved Test Methods 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.118 Recordkeeping Requirements 12/15/2016 4/30/2019, 84 FR 18150\nSection 115.119 Compliance Schedules 3/4/2020 3/23/2026, 91 FR 13747\nDivision 2: Vent Gas Control\nSection 115.120 Vent Gas Definitions 12/13/02 02/27/08, 73 FR 10383\nSection 115.121 Emissions Specifications 7/20/2021 8/15/2023, 88 FR 55382\nSection 115.122 Control Requirements 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.123 Alternate Control Requirements 12/13/02 02/27/08, 73 FR 10383\nSection 115.125 Testing Requirements 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.126 Monitoring and Recordkeeping Requirements 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.127 Exemptions 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.129 Counties and Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547\nDivision 3: Water Separation\nSection 115.131 Emission Specifications 5/4/94 5/22/97, 62 FR 27964\nSection 115.132 Control Requirements 4/26/02 02/27/08, 73 FR 10383\nSection 115.133 Alternate Control Requirements 4/26/02 02/27/08, 73 FR 10383\nSection 115.135 Testing Requirements 05/4/94 05/22/97, 62 FR 27964\nSection 115.136 Monitoring and Recordkeeping Requirements 4/26/02 02/27/08, 73 FR 10383\nSection 115.137 Exemptions 4/26/02 02/27/08, 73 FR 10383\nSection 115.139 Counties and Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547\nDivision 4: Industrial Wastewater\nSection 115.140 Industrial Wastewater Definitions 4/26/02 2/27/08, 73 FR 10383\nSection 115.142 Control Requirements 12/13/02 02/27/08, 73 FR 10383\nSection 115.143 Alternate Control Requirements 12/13/02 02/27/08, 73 FR 10383\nSection 115.144 Inspection and Monitoring Requirements 12/13/02 2/27/08, 73 FR 10383\nSection 115.145 Approved Test Methods 4/26/02 02/27/08, 73 FR 10383\nSection 115.146 Recordkeeping Requirements 10/27/99 12/20/00, 65 FR 79745\nSection 115.147 Exemptions 12/13/02 02/27/08, 73 FR 10383\nSection 115.148 Training Requirements 10/27/99 12/20/00, 65 FR 79745\nSection 115.149 Counties and Compliance Schedules 11/15/06 7/17/08, 73 FR 40972\nDivision 5: Municipal Solid Waste Landfills\nSection 115.152 Control Requirements 5/4/94 5/22/97, 62 FR 27964\nSection 115.153 Alternate Control Requirements 4/26/02 2/27/08, 73 FR 10383\nSection 115.155 Approved Test Methods 05/4/94 05/22/97, 62 FR 27964\nSection 115.156 Monitoring and Recordkeeping Requirements 5/4/94 05/22/97, 62 FR 27964\nSection 115.157 Exemptions 5/4/94 5/22/97, 62 FR 27964\nSection 115.159 Counties and Compliance Schedules 4/26/02 2/27/08, 73 FR 10383\nDivision 6: Batch Processes\nSection 115.160 Batch Process Definitions 12/13/02 02/27/08, 73 FR 10383\nSection 115.161 Applicability 12/13/02 02/27/08, 73 FR 10383\nSection 115.162 Control Requirements 12/06/00 07/16/01, 66 FR 36913\nSection 115.163 Alternate Control Requirements 10/27/99 12/20/00, 65 FR 79745\nSection 115.164 Determination of Emissions and Flow Rates 12/06/00 07/16/01, 66 FR 36913\nSection 115.165 Approved Test Methods and Testing Requirements 12/06/00 07/16/01, 66 FR 36913\nSection 115.166 Monitoring and Recordkeeping Requirements 12/13/02 02/27/08, 73 FR 10383\nSection 115.167 Exemptions 9/28/2005 7/10/2009, 74 FR 33146\nSection 115.169 Counties and Compliance Schedules 9/28/2005 7/10/2009, 74 FR 33146\nDivision 7: Oil and Natural Gas in Ozone Nonattainment Areas\nSection 115.170 Applicability 7/20/2021 8/15/2023, 88 FR 55382\nSection 115.171 Definitions 7/20/2021 8/15/2023, [88 FR 55382\nSection 115.172 Exemptions 7/20/2021 8/15/2023, 88 FR 55382\nSection 115.173 Compressor Control Requirements 7/20/2021 8/15/2023, 88 FR 55382\nSection 115.174 Pneumatic Controller and Pump Control Requirements 7/20/2021 8/15/2023, 88 FR 55382\nSection 115.175 Storage Tank Control Requirements 7/20/2021 8/15/2023, 88 FR 55382\nSection 115.176 Alternative Control Requirements 7/20/2021 8/15/2023, 88 FR 55382\nSection 115.177 Fugitive Emission Component Monitoring Requirements 7/20/2021 8/15/2023, 88 FR 55382\nSection 115.178 Monitoring and Inspection Requirements 7/20/2021 8/15/2023, 88 FR 55382\nSection 115.179 Approved Test Methods and Testing Requirements 7/20/2021 8/15/2023, 88 FR 55382\nSection 115.180 Recordkeeping Requirements 7/20/2021 8/15/2023, 88 FR 55382\nSection 115.181 Reporting Requirements 7/20/2021 8/15/2023, 88 FR 55382\nSection 115.183 Compliance Schedules 7/20/2021 8/15/2023, 88 FR 55382\nSubchapter C—Volatile Organic Compound Transfer Operations\nDivision 1: Loading and Unloading of Volatile Organic Compounds\nSection 115.211 Emission Specifications 12/13/02 1/19/06, 71 FR 3009\nSection 115.212 Control Requirements 12/6/00 07/16/01, 66 FR 36913\nSection 115.213 Alternate Control Requirements 06/30/99 12/20/00, 65 FR 79745\nSection 115.214 Inspection Requirements 4/26/02 1/19/06, 71 FR 3009\nSection 115.215 Approved Test Methods 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.216 Monitoring and Record-keeping Requirements 10/22/03 1/19/06, 71 FR 3009\nSection 115.217 Exemptions 10/22/03 1/19/06, 71 FR 3009\nSection 115.219 Counties and Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.220* Filling of Gasoline Storage Vessels (Stage I) for Motor Vehicles Fuel Dispensing Facilities in Bexar County 03/30/79 11/10/82, 47 FR 50866 Ref 52.2299(c)(48). The number 220* was created to avoid duplicate sections numbers in the SIP. There is no section 115.220 in the current SIP approved codification.\nDivision 2: Filling of Gasoline Storage Vessels (Stage I) for Motor Vehicle Fuel Dispensing Facilities\nSection 115.221 Emission Specifications 9/10/2014 4/30/2015, 80 FR 24215\nSection 115.222 Control Requirements 9/10/2014 4/30/2015, 80 FR 24215\nSection 115.223 Alternate Control Requirements 03/23/05 1/19/06, 71 FR 3009\nSection 115.224 Inspection Requirements 9/10/2014 4/30/2015, 80 FR 24215\nSection 115.225 Testing Requirements 9/10/2014 4/30/2015, 80 FR 24215\nSection 115.226 Recordkeeping Requirements 9/10/2014 4/30/2015, 80 FR 24215\nSection 115.227 Exemptions 9/10/2014 4/30/2015, 80 FR 24215\nSection 115.229 Counties and Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547\nDivision 3: Control of Volatile Organic Leaks from Transport Vessels\nSection 115.234 Inspection Requirements 6/30/99 12/20/00, 65 FR 79745\nSection 115.235 Approved Test Methods 06/30/99 12/20/00, 65 FR 79745\nSection 115.236 Recordkeeping Requirements 6/30/99 12/20/00, 65 FR 79745\nSection 115.237 Exemptions 06/30/99 12/20/00, 65 FR 79745\nSection 115.239 Counties and Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547\nDivision 4: Control of Vehicle Refueling Emissions (Stage II) at Motor Vehicle Fuel Dispensing Facilities\nSection 115.240 Stage II Vapor Recovery Definitions and List of California Air Resources Board Certified Stage II Equipment 10/9/2013 3/17/14, 79 FR 14611\nSection 115.241 Emission Specifications 10/9/2013 3/17/14, 79 FR 14611\nSection 115.242 Control Requirements 10/9/2013 3/17/14, 79 FR 14611\nSection 115.243 Alternate Control Requirements 10/9/2013 3/17/14, 79 FR 14611\nSection 115.244 Inspection Requirements 10/9/2013 3/17/14, 79 FR 14611\nSection 115.245 Testing Requirements 10/9/2013 3/17/14, 79 FR 14611\nSection 115.246 Recordkeeping Requirements 10/9/2013 3/17/14, 79 FR 14611\nSection 115.248 Training Requirements 3/23/05 1/19/06, 71 FR 3009\nSection 115.252 to 115.259 Control of Reid Vapor Pressure of Gasoline 5/4/94 05/22/97, 62 FR 27964 Ref 52.2299(c)(104).\nSubchapter D—Petroleum Refining, Natural Gas Processing, and Petrochemical Processes\nDivision 1: Process Unit Turnaround and Vacuum-Producing Systems in Petroleum Refineries\nSection 115.311 Emission Specifications 4/26/02 2/27/08, 73 FR 10383\nSection 115.312 Control Requirements 12/13/02 2/27/08, 73 FR 10383\nSection 115.313 Alternate Control Requirements 4/26/02 02/27/08, 73 FR 10383\nSection 115.315 Testing Requirements 5/8/92 3/7/95, 60 FR 12438\nSection 115.316 Monitoring and Recordkeeping Requirements 4/26/02 2/27/08, 73 FR 10383\nSection 115.317 Exemptions 5/8/92 3/7/95, 60 FR 12438\nSection 115.319 Counties and Compliance Schedules 11/15/06 7/17/08, 73 FR 40972\nDivision 2: Fugitive Emission Control in Petroleum Refineries in Gregg, Nueces, and Victoria Counties\nSection 115.322 Control Requirements 6/2/2010 2/26/2015, 80 FR 10352\nSection 115.323 Alternate Control Requirements 6/2/2010 2/26/2015, 80 FR 10352\nSection 115.324 Inspection Requirements 6/2/2010 2/26/2015, 80 FR 10352\nSection 115.325 Testing Requirements 6/2/2010 2/26/2015, 80 FR 10352\nSection 115.326 Recordkeeping Requirements 6/2/2010 2/26/2015, 80 FR 10352\nSection 115.327 Exemptions 4/26/02 2/27/08, 73 FR 10383\nSection 115.329 Counties and Compliance Schedules 8/8/01 2/27/08, 73 FR 10383\nDivision 3: Fugitive Emission Control in Petroleum Refining, Natural Gas/Gasoline Processing, and Petrochemical Processes in Ozone Nonattainment Areas\nSection 115.352 Control Requirements 6/2/2010 2/26/2015, 80 FR 10352\nSection 115.353 Alternate Control Requirements 6/2/2010 2/26/2015, 80 FR 10352\nSection 115.354 Monitoring and Inspection Requirements 6/2/2010 2/26/2015, 80 FR 10352\nSection 115.355 Approved Test Methods 6/2/2010 2/26/2015, 80 FR 10352\nSection 115.356 Recordkeeping Requirements 6/2/2010 2/26/2015, 80 FR 10352\nSection 115.357 Exemptions 7/20/2021 8/15/2023, 88 FR 55382\nSection 115.358 Alternative Work Practice 6/2/2010 2/26/2015, 80 FR 10352\nSection 115.359 Counties and Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547\nSubchapter E—Solvent-Using Processes\nDivision 1: Degreasing Processes\nSection 115.410 Applicability 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.411 Exemptions 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.412 Control Requirements 11/17/04 3/29/05, 70 FR 15769\nSection 115.413 Alternate Control Requirements 11/17/04 3/29/05, 70 FR 15769\nSection 115.415 Testing 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.416 Recordkeeping Requirements 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.419 Counties and Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547\nDivision 2: Surface Coating Processes\nSection 115.420 Applicability and Definitions 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.421 Emission Specifications 3/4/2020 3/23/2026, 91 FR 13747\nSection 115.422 Control Requirements 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.423 Alternate Control Requirements 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.424 Inspection Requirements 6/29/00 10/30/01, 66 FR 54688\nSection 115.425 Testing Requirements 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.426 Monitoring and Recordkeeping Requirements 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.427 Exemptions 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.429 Counties and Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547\nDivision 3: Flexographic and Rotogravure Printing\nSection 115.430 Applicability and Definitions 01/17/12 3/27/15, 80 FR 16291\nSection 115.431 Exemptions 1/17/12 3/27/15, 80 FR 16291\nSection 115.432 Control Requirements 1/17/12 3/27/15, 80 FR 16291\nSection 115.433 Alternate Control Requirements 1/17/12 3/27/15, 80 FR 16291\nSection 115.435 Testing Requirements 1/17/12 3/27/15, 80 FR 16291\nSection 115.436 Monitoring and Recordkeeping Requirements 1/17/12 3/27/15, 80 FR 16291\nSection 115.439 Counties and Compliance Schedules 1/17/12 3/27/15, 80 FR 16291\nDivision 4: Offset Lithographic Printing\nSection 115.440 Applicability and Definitions 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.441 Exemptions 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.442 Control Requirements 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.443 Alternate Control Requirements 3/10/2010 8/4/2014, 79 FR 45106\nSection 115.445 Approved Test Methods 3/10/2010 8/4/2014, 79 FR 45106\nSection 115.446 Monitoring and Recordkeeping Requirements 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.449 Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547\nDivision 5: Control Requirements for Surface Coating Processes\nSection 115.450 Applicability and Definitions 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.451 Exemptions 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.453 Control Requirements 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.454 Alternate Control Requirements 1/17/12 3/27/15, 80 FR 16291\nSection 115.455 Approved Test Methods and Testing Requirements 1/17/12 3/27/15, 80 FR 16291\nSection 115.458 Monitoring and Recordkeeping Requirements 1/17/12 3/27/15, 80 FR 16291\nSection 115.459 Counties and Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547\nDivision 6: Industrial Cleaning Solvents\nSection 115.460 Applicability and Definitions 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.461 Exemptions 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.463 Control Requirements 1/17/12 3/27/15, 80 FR 16291\nSection 115.464 Alternate Control Requirements 1/17/12 3/27/15, 80 FR 16291\nSection 115.465 Approved Test Methods and Testing Requirements 1/17/12 3/27/15, 80 FR 16291\nSection 115.468 Monitoring and Recordkeeping Requirements 1/17/12 3/27/15, 80 FR 16291\nSection 115.469 Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547\nDivision 7: Miscellaneous Industrial Adhesives\nSection 115.470 Applicability and Definitions 1/17/12 3/27/15, 80 FR 16291\nSection 115.471 Exemptions 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.473 Control Requirements 6/15/2015 12/21/2017, 82 FR 60547\nSection 115.474 Alternate Control Requirements 1/17/12 3/27/15, 80 FR 16291\nSection 115.475 Approved Test Methods and Testing Requirements 1/17/12 3/27/15, 80 FR 16291\nSection 115.478 Monitoring and Recordkeeping Requirements 1/17/12 3/27/15, 80 FR 16291\nSection 115.479 Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547\nSubchapter F—Miscellaneous Industrial Sources\nDivision 1: Cutback Asphalt\nSection 115.510 Cutback Asphalt Definitions 8/31/99 12/22/99, 64 FR 71670\nSection 115.512 Control Requirements 11/17/04 3/29/05, 70 FR 15769\nSection 115.513 Alternative Control Requirements 8/31/99 12/22/99, 64 FR 71670\nSection 115.515 Testing Requirements 8/31/99 12/22/99, 64 FR 71670\nSection 115.516 Recordkeeping Requirements 11/17/04 3/29/05, 70 FR 15769\nSection 115.517 Exemptions 11/17/04 3/29/05, 70 FR 15769 Ref 52.2299(c)(88).\nSection 115.519 Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547\nDivision 2: Pharmaceutical Manufacturing Facilities\nSection 115.531 Emission Specifications 5/4/94 5/22/97, 62 FR 27964\nSection 115.532 Control Requirements 4/26/02 2/27/08, 73 FR 10383\nSection 115.533 Alternate Control Requirements 4/26/02 02/27/08, 73 FR 10383\nSection 115.534 Inspection Requirements 5/4/94 5/22/97, 62 FR 27964\nSection 115.535 Testing Requirements 4/26/02 2/27/08, 73 FR 10383\nSection 115.536 Monitoring and Recordkeeping Requirements 5/4/94 5/22/97, 62 FR 27964\nSection 115.537 Exemptions 5/4/94 05/22/97, 62 FR 27964\nSection 115.539 Counties and Compliance Schedules 11/15/06 7/17/08, 73 FR 40972\nDivision 3: Degassing or Cleaning of Stationary, Marine, and Transport Vessels\nSection 115.540 Applicability and Definitions 1/26/2011 9/23/2015, 80 FR 57304\nSection 115.541 Emission Specifications 1/26/2011 9/23/2015, 80 FR 57304\nSection 115.542 Control Requirements 1/26/2011 9/23/2015, 80 FR 57304\nSection 115.543 Alternate control Requirements 1/26/2011 9/23/2015, 80 FR 57304\nSection 115.544 Inspection, Monitoring, and Testing Requirements 1/26/2011 9/23/2015, 80 FR 57304\nSection 115.545 Approved Test Methods 1/26/2011 9/23/2015, 80 FR 57304\nSection 115.546 Recordkeeping and Notification Requirements 1/26/2011 9/23/2015, 80 FR 57304\nSection 115.547 Exemptions 1/26/2011 9/23/2015, 80 FR 57304\nSection 115.549 Counties and Compliance Schedules 5/23/2007 3/29/2010, 75 FR 15348\nDivision 4: Petroleum Dry Cleaning Systems\nSection 115.552 Control Requirements 4/26/02 2/27/08, 73 FR 10383\nSection 115.553 Alternate Control Requirements 05/4/94 5/22/97, 62 FR 27964\nSection 115.555 Testing Methods and Procedures 5/4/94 5/22/97, 62 FR 27964\nSection 115.556 Recordkeeping Requirements 5/4/94 5/22/97, 62 FR 27964\nSection 115.557 Exemptions 5/4/94 5/22/97, 62 FR 27964\nSection 115.559 Counties and Compliance Schedules 4/26/02 2/27/08, 73 FR 10383\nSubchapter G—Consumer-Related Sources\nDivision 1: Automotive Windshield Washer Fluid\nSection 115.600 Consumer Products Definitions 1/28/04 02/10/05, 70 FR 7041\nSection 115.610 Applicability 1/28/04 02/10/05, 70 FR 7041\nSection 115.612 Control Requirements 1/28/04 02/10/05, 70 FR 7041\nSection 115.613 Alternate Control Requirements 1/28/04 02/10/05, 70 FR 7041\nSection 115.615 Testing Requirements 1/28/04 02/10/05, 70 FR 7041\nSection 115.616 Recordkeeping and Reporting Requirements 1/28/04 02/10/05, 70 FR 7041\nSection 115.617 Exemptions 1/28/04 02/10/05, 70 FR 7041\nSection 115.619 Counties and Compliance Schedules 1/28/04 2/10/05, 70 FR 7041\nDivision 2: Portable Fuel Containers\nSubchapter H—Highly-Reactive Volatile Organic Compounds\nDivision 1: Vent Gas Control\nSection 115.720 Applicability and Definitions 12/01/04 9/06/06, 71 FR 52656\nSection 115.722 Site-wide Cap and Control Requirements 12/01/04 9/06/06, 71 FR 52656\nSection 115.725 Monitoring and Testing Requirements 12/01/04 9/06/06, 71 FR 52656\nSection 115.726 Recordkeeping and Reporting Requirements 12/01/04 9/06/06, 71 FR 52656\nSection 115.727 Exemptions 12/01/04 9/06/06, 71 FR 52656\nSection 115.729 Counties and Compliance Schedules 12/1/04 9/06/06, 71 FR 52656\nDivision 2: Cooling Tower Heat Exchange Systems\nSection 115.760 Applicability and Cooling Tower Heat Exchange System Definitions 12/1/04 9/06/06, 71 FR 52656\nSection 115.761 Site-wide Cap 12/01/04 9/6/06, 71 FR 52656\nSection 115.764 Monitoring and Testing Requirements 12/1/04 9/6/06, 71 FR 52656\nSection 115.766 Recordkeeping and Reporting Requirements 12/1/04 9/6/06, 71 FR 52656\nSection 115.767 Exemptions 12/01/04 9/06/06, 71 FR 52656\nSection 115.769 Counties and Compliance Schedules 12/1/04 9/6/06, 71 FR 52656\nDivision 3: Fugitive Emissions\nSection 115.780 Applicability 12/1/04 9/06/06, 71 FR 52656\nSection 115.781 General Monitoring and Inspection Requirements 6/2/2010 2/26/2015, 80 FR 10352\nSection 115.782 Procedures and Schedule for Leak Repair and Follow-up 6/2/2010 2/26/2015, 80 FR 10352\nSection 115.783 Equipment Standards 12/1/04 9/06/06, 71 FR 52656\nSection 115.784 Alternate Control Requirements 6/2/2010 2/26/2015, 80 FR 10352\nSection 115.786 Recordkeeping Requirements 6/2/2010 2/26/2015, 80 FR 10352\nSection 115.787 Exemptions 6/2/2010 2/26/2015, 80 FR 10352\nSection 115.788 Audit Provisions 6/2/2010 2/26/2015, 80 FR 10352\nSection 115.789 Counties and Compliance Schedules 12/1/04 9/06/06, 71 FR 52656\nSubchapter J—Administrative Provisions\nDivision 1: Alternate Means of Control\nSection 115.901 Insignificant Emissions 07/13/94 05/22/97, 62 FR 27964\nSection 115.910 Availability of Alternate Means of Control 4/26/2 2/27/08, 73 FR 10383\nSection 115.911 Criteria for Approval of Alternate Means of Control Plans 4/26/02 2/27/08, 73 FR 10383\nSection 115.912 Calculations for Determining Alternate Means of Control Reductions 4/26/02 02/27/08, 73 FR 10383\nSection 115.913 Procedures for Alternate Means of Control Plan Submittal 4/26/02 02/27/08, 73 FR 10383\nSection 115.914 Procedures for an Alternate Means of Control Plan Approval 4/26/02 02/27/08, 73 FR 10383\nSection 115.915 Public Notice Format 4/26/02 2/27/08, 73 FR 10383\nSection 115.916 Review of Approved Alternate Means of Control Plans and Termination of Alternate Means of Control Plans 4/26/02 02/27/08, 73 FR 10383\nDivision 2: Early Reductions\nSection 115.920 Applicability 4/26/02 2/27/08, 73 FR 10383\nSection 115.923 Documentation 04/26/02 2/27/08, 73 FR 10383\nDivision 3: Compliance and Control Plan Requirements\nSection 115.930 Compliance Dates 4/26/02 2/27/08, 73 FR 10383\nSection 115.932 Congtrol Plan Procedure 4/26/02 2/27/08, 73 FR 10383\nSection 115.934 Control Plan Deviation 4/26/02 2/27/08, 73 FR 10383\nSection 115.936 Reporting Procedure 11/10/93 5/22/97, 62 FR 27964\nSection 115.940 Equivalency Determination 4/26/02 2/27/08, 73 FR 10383\nSection 115.950 Use of Emissions Credits for Compliance 12/06/00 9/6/06, 71 FR 52698\nChapter 116 (Reg 6)—Control of Air Pollution by Permits for New Construction or Modification\nSubchapter A—Definitions\nSection 116.10 Definitions 9/15/2010 9/9/2016, 81 FR 62385 SIP does not include 30 TAC Section 116.10(5)(F) or 116.10(9)(F).\nSection 116.11 Compliance History Definitions 06/17/98 09/18/02, 67 FR 58709.\nSection 116.12 Nonattainment and Prevention of Significant Deterioration Review Definitions 6/09/2021 5/19/2025, 90 FR 21232\nSection 116.13 Flexible Permit Definitions 7/31/2014 7/20/2015, 80 FR 42729\nSection 116.14 Standard Permit Definitions 06/17/98 11/14/03, 68 FR 64548\nSection 116.17 Qualified Facility Definitions 9/15/2010 9/9/2016, 81 FR 62385\nSection 116.18 Electric Generating Facility Permits Definitions 5/22/2002 1/11/2011, 76 FR 1525\nSection 116.20 Portable Facilities Definitions 2/10/2010 10/6/2015, 80 FR 60296\nSubchapter B—New Source Review Permits\nDivision 1—Permit Application\nSection 116.110 Applicability 7/15/2020 10/14/2020, 85 FR 64968 SIP does not include 116.110(a)(5), 116.110(c), or 116.110(d).\nSection 116.111 General Application 4/22/2020 8/24/2023, 88 FR 57884\nSection 116.112 Distance Limitations 4/22/2020 8/24/2023, 88 FR 57884\nSection 116.114 Application Review Schedule 10/31/2018 2/13/2020, 85 FR 8187\nSection 116.115 General and Special Conditions 2/9/2011 10/25/2012, 77 FR 65119\nSection 116.116 Changes to Facilities 7/15/2020 10/14/2020, 85 FR 64968 SIP does not include 30 TAC Section 116.116(b)(3).\nSection 116.117 Documentation and Notification of Changes to Qualified Facilities 9/15/2010 9/9/2016, 81 FR 62385 SIP does not include 30 TAC Section 116.117(a)(4)(B).\nSection 116.118 Construction While Permit Amendment Application Pending 7/15/2020 10/14/2020, 85 FR 64968\nSection 116.120 Voiding of Permits 8/20/03 4/2/10, 75 FR 16671\nSection 116.127 Actual to Projected Actual and Emission Exclusion Test for Emissions 2/9/2011 10/25/2012, 77 FR 65119\nDivision 4—Permit Fees\nSection 116.140 Applicability 06/17/98 09/18/02, 67 FR 58709\nSection 116.141 Determination of Fees 9/25/2002 3/20/2009, 74 FR 11851.\nSection 116.143 Payment of Fees 8/20/2003 3/20/2009, 74 FR 11851.\nDivision 5—Nonattainment Review\nSection 116.150 New Major Source or Major Modification in Ozone Nonattainment Area 6/09/2021 5/19/2025, 90 FR 21232\nSection 116.151 New Major Source or Major Modification in Nonattainment Area Other than Ozone 6/09/2021 5/19/2025, 90 FR 21232\nDivision 6—Prevention of Significant Deterioration Review\nSection 116.160 Prevention of Significant Deterioration 6/09/2021 5/19/2025, 90 FR 21232 THE PSD SIP INCLUDES 30 TAC SECTION 116.160(A) AS Adopted by the State as of 6/2/2010. The PSD SIP includes a letter from the TCEQ dated December 2, 2013, committing that Texas will follow a SIP amendment process to apply its PSD SIP to additional pollutants that are regulated in the future, including non-NAAQS pollutants. The PSD SIP includes a letter from the TCEQ dated May 30, 2014, clarifying the judicial review process for the Texas PSD permit program.\nSection 116.161 Source Located in an Attainment Area with Greater than De Minimis Impact 06/17/98 09/18/02, 67 FR 58709.\nSection 116.162 Evaluation of Air Quality Impacts 10/10/01 7/22/04, 69 FR 43752.\nSection 116.163 Prevention of Significant Deterioration Permit Fees 9/25/2002 3/20/2009, 74 FR 11851.\nSection 116.164 Prevention of Significant Deterioration Applicability for Greenhouse Gases Sources 10/31/2018 2/13/2020, 85 FR 8187 The PSD SIP does NOT include 30 TAC Section 116.164(b).\nSection 116.169 Greenhouse Gases Program Transitions 3/26/2014 11/10/2014, 79 FR 66626 The PSD SIP does NOT include 30 TAC Section 116.169(b). The PSD SIP includes a letter from the TCEQ dated January 13, 2014, regarding the TCEQ's authority to administer EPA-issued GHG PSD permits.\nDivision 7—Emission Reductions: Offsets\nSection 116.170 Applicability of Emission Reductions as Offsets 8/20/2003 3/20/2009, 74 FR 11851.\nSection 116.172 Emissions Offsets from Rocket Engine Firing and Cleaning 8/20/2003 3/20/2009, 74 FR 11851.\nSection 116.174 Determination by Executive Director to Authorize Reductions 6/17/1998 11/2/2011, 76 FR 67600\nSection 116.175 Recordkeeping 8/16/1993 11/2/2011, 76 FR 67600\nSection 116.176 Use of Mass Cap Allowances for Offsets 3/07/01 9/6/06, 71 FR 52664.\nDivision 8—Portable Facilities\nSection 116.178 Relocations and Changes of Location of Portable Facilities 2/10/2010 10/6/2015, 80 FR 60296\nSubchapter C—Plant-wide Applicability Limits\nDivision 1—Plant-wide Applicability Limits\nSection 116.180 Applicability 7/25/2012 10/25/2012, 77 FR 65119\nSection 116.182 Plant-Wide Applicability Limit Permit Application 2/9/2011 10/25/2012, 77 FR 65119\nSection 116.184 Application Review Schedule 1/11/2006 10/25/2012, 77 FR 65119\nSection 116.186 General and Specific Conditions 7/25/2012 10/25/2012, 77 FR 65119 The SIP includes TCEQ's “Letter of explanation and interpretation of the Texas SIP for NSR Reform” dated 5/3/2012, which explains and clarifies TCEQ's interpretation of paragraphs (a), (b)(9) and (c)(2).\nSection 116.188 Plant-Wide Applicability Limit 2/9/2011 10/25/2012, 77 FR 65119\nSection 116.190 Federal Nonattainment and Prevention of Significant Deterioration Review 2/9/2011 10/25/2012, 77 FR 65119\nSection 116.192 Amendments and Alterations 2/9/2011 10/25/2012, 77 FR 65119\nSection 116.194 Public Notification and Comment 6/2/2010 1/6/2014, 79 FR 551\nSection 116.196 Renewal of a Plant-wide Applicability Limit Permit 10/31/2018 2/13/2020, 85 FR 8187\nSection 116.198 Expiration of Voidance 10/31/2018 2/13/2020, 85 FR 8187\nSubchapter D—Permit Renewals\nSection 116.310 Notification of Permit Holder 10/31/2018 2/13/2020, 85 FR 8187\nSection 116.311 Permit Renewal Application 8/21/2002 9/9/2016, 81 FR 62385 SIP does not include 30 TAC Section 116.311(a)(6).\nSection 116.312 Public Notification and Comment Procedures 9/2/1999 1/6/2014, 79 FR 551\nSection 116.313 Renewal Application Fees 8/20/2003 3/20/2009, 74 FR 11851.\nSection 116.314 Review Schedule 6/17/1998 11/14/2011, 76 FR 70354\nSection 116.315 Permit Renewal Submittal 5/7/2008 3/11/10, 75 FR 11464\nSubchapter F—Standard Permits\nSection 116.601 Types of Standard Permits 2/9/2011 4/1/2014, 79 FR 18183\nSection 116.602 Issuance of Standard Permits 12/16/99 11/14/03, 68 FR 64548\nSection 116.603 Public Participation in Issuance of Standard Permits 9/20/06 9/17/08, 73 FR 53716\nSection 116.604 Duration and Renewal of Registrations to Use Standard Permits 12/16/99 11/14/03, 68 FR 64548\nSection 116.605 Standard Permit Amendment and Revocation 12/16/99 11/14/03, 68 FR 64548\nSection 116.606 Delegation 12/16/99 11/14/03, 68 FR 64548\nSection 116.610 Applicability 3/26/2014 11/10/2014, 79 FR 66626 30 TAC Section 116.610(b) is SIP-approved as adopted by the State as of 11/20/2002. The SIP does NOT include 30 TAC Section 116.610(d)\nSection 116.611 Registration to Use a Standard Permit 10/31/2018 2/13/2020, 85 FR 8187 30 TAC Section 116.611(b) is SIP-approved as adopted by the State as of 11/20/2002. The SIP does NOT include 30 TAC Section 116.611(c)(3), (c)(3)(A), and (c)(3)(B).\nSection 116.614 Standard Permit Fees 9/25/2002 3/20/2009, 74 FR 11851.\nSection 116.615 General Conditions 10/31/2018 2/13/2020, 85 FR 8187\nSection 116.617 State Pollution Control Project Standard Permit 1/11/2006 4/1/2014, 79 FR 18183\nSection 116.620 Installation and/or Modification of Oil and Gas Facilities 8/9/2000 2/14/2014, 79 FR 8861 The types of emission units that may be authorized by this section are the following: • Internal combustion engines (ICEs), • Natural gas turbines (NG turbines),\n• Flares,\n• Other combustion units (design heat input \u003e40 million BTU per hour),\n• Natural gas glycol dehydration units,\n• Storage tanks,\n• Separators,\n• Condensers,\n• Vapor recovery units,\n• Process vents, and\n• Process fugitives\nSubchapter G: Flexible Permits\nSection 116.710 Applicability July 15, 2020 10/14/2020, 85 FR 64968\nSection 116.711 Flexible Permit Application 7/31/2014 7/20/2015, 80 FR 42729 SIP includes 30 TAC 116.711(1), (2)(A), (B) and (C)(i) and (ii), (D)-(J), and (L)-(N)\nSection 116.714 Application Review Schedule 6/17/1998 7/14/2014, 79 FR 40666\nSection 116.715 General and Special Conditions 7/31/2014 7/20/2015, 80 FR 42729 SIP includes 30 TAC 116.715(a)-(e) and (f)(1) and (2)(B)\nSection 116.716 Emission Caps and Individual Emission Limitations 7/31/2014 7/20/2015, 80 FR 42729\nSection 116.717 Implementation Schedule for Additional Controls 7/31/2014 7/20/2015, 80 FR 42729\nSection 116.718 Significant Emission Increase 7/31/2014 7/20/2015, 80 FR 42729\nSection 116.720 Limitation on Physical and Operational Changes 7/31/2014 7/20/2015, 80 FR 42729\n116.721 Amendments and Alterations July 15, 2020 10/14/2020, 85 FR 64968\nSection 116.722 Distance Limitations 8/9/2000 7/14/2014, 79 FR 40666\nSection 116.740 Public Notice and Comment 7/31/2014 7/20/2015, 80 FR 42729 SIP includes 30 TAC Section 116.740(a).\nSection 116.750 Flexible Permit Fee 7/31/2014 7/20/2015, 80 FR 42729\nSection 116.760 Flexible Permit Renewal 11/16/1994 7/20/2015, 80 FR 42729\nSection 116.765 Compliance Schedule 7/31/2014 7/20/2015, 80 FR 42729 SIP includes 30 TAC Section 116.765(b) and (c).\nSubchapter I—Electric Generating Facility Permits\nSection 116.910 Applicability 6/9/2021 8/24/2023, 88 FR 57884\nSection 116.911 Electric Generating Facility Permit Application 6/9/2021 8/24/2023, 88 FR 57884 Section 116.911(a)(2) is authorized for Minor NSR only.\nSection 116.912 Electing Electric Generating Facilities 12/16/1999 1/11/2011, 76 FR 1525\nSection 116.913 General and Special Conditions 5/22/2002 1/11/2011, 76 FR 1525\nSection 116.914 Emissions Monitoring and Reporting Requirements 12/16/1999 1/11/2011, 76 FR 1525\nSection 116.916 Permits for Grandfathered and Electing Electric Generating Facilities in El Paso County 12/16/1999 1/1/2011, 76 FR 1525\nSection 116.917 Electric Generating Facility Permit Application for Certain Grandfathered Coal-Fired Electric Generating Facilities and Certain Grandfathered Facilities Located at Electric Generating Facility Sites 5/22/2002 1/11/2011, 76 FR 1525\nSection 116.918 Additional General and Special Conditions for Grandfathered Coal-Fired Electric Generating Facilities and Certain Grandfathered Facilities Located at Electric Generating Facility Sites 5/22/2002 1/11/2011, 76 FR 1525\nSection 116.919 Additional Requirements for Grandfathered Electric Generating Facility Permit Applications 8/21/02 1/6/14 79 FR 577\nSection 116.920 Public Participation for Initial Issuance 6/9/2021 8/24/2023, 88 FR 57884\nSection 116.921 Notice and Comment Hearings for Initial Issuance 5/22/2002 1/11/2011, 76 FR 1525\nSection 116.922 Notice of Final Action 12/16/1999 1/11/2011, 76 FR 1525\nSection 116.926 Permit Fee 5/22/2002 1/11/2011, 76 FR 1525\nSection 116.928 Delegation 5/22/2002 1/11/2011, 76 FR 1525\nSection 116.930 Amendments and Alterations of Permits Issued Under this Subchapter 5/22/2002 1/11/2011, 76 FR 1525\nSection 116.931 Renewal 12/16/1999 1/11/2011, 76 FR 1525\nSubchapter M: Best Available Retrofit Technology (BART)\nSection 116.1500 Definitions 2/25/2009 1/5/2016, 81 FR 350\nSection 116.1510 Applicability and Exemption Requirements 2/25/2009 1/5/2016, 81 FR 350 116.1510(d) is NOT part of the approved SIP.\nSection 116.1520 Best Available Retrofit Technology (BART) Analysis 2/25/2009 1/5/2016, 81 FR 350\nSection 116.1530 Best Available Retrofit Technology (BART) Control Implementation 6/9/2021 8/24/2023, 88 FR 57884\nSection 116.1540 Exemption from Best Available Retrofit Technology (BART) Control Implementation 2/25/2009 1/5/2016, 81 FR 350\nChapter 117—Control of Air Pollution From Nitrogen Compounds\nSubchapter A—Definitions\nSection 117.10 Definitions 3/4/2020 3/23/2026, 91 FR 13747\nSubchapter B—Combustion Control at Major Industrial, Commercial, and Institutional Sources in Ozone Nonattainment Areas\nDivision 1—Beaumont-Port Arthur Ozone Nonattainment Area Major Sources\nSection 117.100 Applicability 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.103 Exemptions 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.105 Emission Specifications for Reasonably Available Control Technology (RACT) 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.110 Emission Specifications for Attainment Demonstration 5/30/2007 12/3/2008, 73 FR 73562 117.110(c) not in SIP.\nSection 117.115 Alternative Plant-Wide Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.123 Source Cap 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.130 Operating Requirements 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.135 Initial Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.140 Continuous Demonstration of Compliance 2/11/2009 7/31/2009, 74 FR 38102\nSection 117.145 Notification, Recordkeeping, and Reporting Requirements 2/11/2009 7/31/2009, 74 FR 38102\nSection 117.150 Initial Control Plan Procedures 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.152 Final Control Plan Procedures for Reasonably Available Control Technology 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.154 Final Control Plan Procedures for Attainment Demonstration Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.156 Revision of Final Control Plan 5/30/2007 12/3/2008, 73 FR 73562\nDivision 3—Houston-Galveston-Brazoria Ozone Nonattainment Area Major Sources\nSection 117.300 Applicability 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.303 Exemptions 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.305 Emission Specifications for Reasonably Available Control Technology (RACT) 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.310 Emission Specifications for Attainment Demonstration 5/30/2007 12/3/2008, 73 FR 73562 117.310(c) not in SIP.\nSection 117.315 Alternative Plant-Wide Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.320 System Cap 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.323 Source Cap 5/30/2007 1/14/2009, 74 FR 1927\nSection 117.330 Operating Requirements 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.335 Initial Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.340 Continuous Demonstration of Compliance 2/11/2009 7/31/2009, 74 FR 38102\nSection 117.345 Notification, Recordkeeping, and Reporting Requirements 2/11/2009 7/31/2009, 74 FR 38102\nSection 117.350 Initial Control Plan Procedures 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.352 Final Control Plan Procedures for Reasonably Available Control Technology 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.354 Final Control Plan Procedures for Attainment Demonstration Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.356 Revision of Final Control Plan 5/30/2007 12/3/2008, 73 FR 73562\nDivision 4—Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Major Sources\nSection 117.400 Applicability 6/3/2015 4/13/2016, 81 FR 21750\nSection 117.403 Exemptions 3/4/2020 3/23/2026, 91 FR 13747\nSection 117.405 Emission Specifications for Reasonably Available Control Technology (RACT) 6/3/2015 4/13/2016, 81 FR 21750 117.405(d) Not in SIP.\nSection 117.410 Emission Specifications for Eight-Hour Attainment Demonstration Reporting 6/3/2015 4/13/2016, 81 FR 21925 117.410(c) NOT in SIP.\nSection 117.423 Source Cap 6/3/2015 4/13/2016, 81 FR 21750\nSection 117.430 Operating Requirements 6/3/2015 4/13/2016, 81 FR 21750\nSection 117.435 Initial Demonstration of Compliance 6/3/2015 4/13/2016, 81 FR 21750\nSection 117.440 Continuous Demonstration of Compliance 6/3/2015 4/13/2016, 81 FR 21750\nSection 117.445 Notification, Recordkeeping, and Reporting Requirements 6/3/2015 4/13/2016, 81 FR 21750\nSection 117.450 Initial Control Plan Procedures 6/3/2015 4/13/2016, 81 FR 21750\nSection 117.452 Final Control Plan Procedures for Reasonably Available Control Technology 6/3/2015 4/13/2016, 81 FR 21750\nSection 117.454 Final Control Plan Procedures for Attainment Demonstration Emission Specifications 6/3/2015 4/13/2016, 81 FR 21750\nSection 117.456 Revision of Final Control Plan 6/3/2015 4/13/2016, 81 FR 21750\nSubchapter C—Combustion Control at Major Utility Electric Generation Sources in Ozone Nonattainment Areas\nDivision 1—Beaumont-Port Arthur Ozone Nonattainment Area Utility Electric Generation Sources\nSection 117.1000 Applicability 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.1003 Exemptions 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.1005 Emission Specifications for Reasonably Available Control Technology (RACT) 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.1010 Emission Specifications for Attainment Demonstration 5/30/2007 12/3/2008, 73 FR 73562 117.1010(b) not in SIP.\nSection 117.1015 Alternative System-Wide Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.1020 System Cap 4/6/2012 7/31/2014, 79 FR 44300\nSection 117.1035 Initial Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.1040 Continuous Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.1045 Notification, Recordkeeping, and Reporting Requirements 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.1052 Final Control Plan Procedures for Reasonably Available Control Technology 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.1054 Final Control Plan Procedures for Attainment Demonstration Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.1056 Revision of Final Control Plan 5/30/2007 12/3/2008, 73 FR 73562\nDivision 3—Houston-Galveston-Brazoria Ozone Nonattainment Area Utility Electric Generation Sources\nSection 117.1200 Applicability 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.1203 Exemptions 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.1205 Emission Specifications for Reasonably Available Control Technology (RACT) 5/30/2007 1/14/2009, 74 FR 1927\nSection 117.1210 Emission Specifications for Attainment Demonstration 5/30/2007 1/14/2009, 74 FR 1927 117.1210(b) not in SIP.\nSection 117.1215 Alternative System-Wide Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.1220 System Cap 4/6/2012 7/31/14, 79 FR 44300\nSection 117.1235 Initial Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.1240 Continuous Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.1245 Notification, Recordkeeping, and Reporting Requirements 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.1252 Final Control Plan Procedures for Reasonably Available Control Technology 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.1254 Final Control Plan Procedures for Attainment Demonstration Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.1256 Revision of Final Control Plan 5/30/2007 12/3/2008, 73 FR 73562\nDivision 4—Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Utility Electric Generation Sources\nSection 117.1303 Exemptions 6/3/2015 4/13/2016, 81 FR 21750\nSection 117.1310 Emission Specifications for Eight-Hour Attainment Demonstration 6/3/2015 4/13/2016, 81 FR 21750 117.1310(b) Not in SIP.\nSection 117.1335 Initial Demonstration of Compliance 6/3/2015 4/13/2016, 81 FR 21750\nSection 117.1340 Continuous Demonstration of Compliance 6/3/2015 4/13/2016, 81 FR 21750\nSection 117.1345 Notification, Recordkeeping, and Reporting Requirements 6/3/2015 4/13/2016, 81 FR 21750 Plan\nSection 117.1350 Initial Control Plan Procedures 6/3/2015 4/13/2016, 81 FR 21750\nSection 117.1354 Final Control Plan Procedures for Attainment Demonstration Emission Specifications 6/3/2015 4/13/2016, 81 FR 21750\nSubchapter D—Combustion Control at Minor Sources in Ozone Nonattainment Areas\nDivision 1—Houston-Galveston-Brazoria Ozone Nonattainment Area Minor Sources\nSection 117.2000 Applicability 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.2003 Exemptions 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.2010 Emission Specification 5/30/2007 12/3/2008, 73 FR 73562 117.2010(i) not in SIP.\nSection 117.2030 Operating Requirements 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.2035 Monitoring and Testing Requirements 2/11/2009 7/31/2009, 74 FR 38102\nSection 117.2045 Recordkeeping and Reporting Requirements 2/11/2009 7/31/2009, 74 FR 38102\nDivision 2—Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Minor Sources\nSection 117.2100 Applicability 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.2103 Exemptions 5/8/2013 7/31/14, 79 FR 44300\nSection 117.2110 Emission Specifications for Eight-Hour Attainment Demonstration 5/18/2011 5/6/2013, 78 FR 26251\nSection 117.2130 Operating Requirements 5/8/2013 7/31/2014, 79 FR 44300\nSection 117.2135 Monitoring, Notification, and Testing Requirements 5/8/2013 7/31/2014, 79 FR 44300\nSection 117.2145 Recordkeeping and Reporting Requirements 5/8/2013 7/31/2014, 79 FR 44300\nSubchapter E—Multi-Region Combustion Control\nDivision 1—Utility Electric Generation in East and Central Texas\nSection 117.3000 Applicability 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.3003 Exemptions 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.3005 Gas-Fired Steam Generation 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.3010 Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562 117.3010(2) not in SIP.\nSection 117.3020 System Cap 4/6/2012 7/31/2014, 79 FR 44302\nSection 117.3035 Initial Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.3040 Continuous Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.3045 Notification, Recordkeeping, and Reporting Requirements 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.3054 Final Control Plan Procedures 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.3056 Revision of Final Control Plan 5/30/2007 12/3/2008, 73 FR 73562\nDivision 2—Cement Kilns\nSection 117.3100 Applicability 5/30/2007 1/14/2009, 74 FR 1927\nSection 117.3101 Cement Kilns Definitions 5/30/2007 1/14/2009, 74 FR 1927\nSection 117.3103 Exemptions 5/30/2007 1/14/2009 , 74 FR 1927\nSection 117.3110 Emission Specifications 5/30/2007 1/14/2009, 74 FR 1927\nSection 117.3120 Source Cap 5/30/2007 1/14/2009, 74 FR 1927\nSection 117.3123 Dallas-Fort Worth Eight-Hour Ozone Attainment Demonstration Control Requirements 5/30/2007 1/14/2009, 74 FR 1927 117.3123(f) not in SIP.\nSection 117.3140 Continuous Demonstration of Compliance 5/30/2007 1/14/2009, 74 FR 1927\nSection 117.3142 Emission Testing and Monitoring for Eight-Hour Attainment Demonstration 5/30/2007 1/14/2009, 74 FR 1927\nSection 117.3145 Notification, Recordkeeping, and Reporting Requirements 5/30/2007 1/14/2009, 74 FR 1927\nDivision 3—Water Heaters, Small Boilers, and Process Heaters\nSection 117.3200 Applicability 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.3201 Definitions 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.3203 Exemptions 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.3205 Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.3210 Certification requirements 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.3215 Notification and Labeling Requirements 5/30/2007 12/3/2008, 73 FR 73562\nDivision 4—East Texas Combustion\nSection 117.3300 Applicability 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.3303 Exemptions 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.3310 Emission Specifications for Eight-Hour Attainment Demonstration 5/30/2007 12/3/2008, 73 FR 73562 117.3310(e) not in SIP.\nSection 117.3330 Operating Requirements 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.3335 Monitoring, Notification, and Testing Requirements 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.3345 Recordkeeping and Reporting Requirements 5/30/2007 12/3/2008, 73 FR 73562\nSubchapter F—Acid Manufacturing\nDivision 1—Adipic Acid Manufacturing\nSection 117.4000 Applicability 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.4005 Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.4025 Alternative Case Specific Specifications 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.4035 Initial Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.4040 Continuous Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.4045 Notification, Recordkeeping, and Reporting Requirements 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.4050 Control Plan Procedures 5/30/2007 12/3/2008, 73 FR 73562\nDivision 2—Nitric Acid Manufacturing—Ozone Nonattainment Areas\nSection 117.4100 Applicability 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.4105 Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.4125 Alternative Case Specific Specifications 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.4135 Initial Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.4140 Continuous Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.4145 Notification, Recordkeeping, and Reporting Requirements 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.4150 Control Plan Procedures 5/30/2007 12/3/2008, 73 FR 73562\nDivision 2—Nitric Acid Manufacturing—Ozone Nonattainment Areas” under Subchapter F to read “Division 3—Nitric Acid Manufacturing—General\nSection 117.4200 Applicability 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.4205 Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.4210 Applicability of Federal New Source Performance Standards 5/30/2007 12/3/2008, 73 FR 73562\nSubchapter G—General Monitoring and Testing Requirements\nDivision 1—Compliance Stack Testing and Report Requirements\nSection 117.8000 Stack Testing Requirements 3/4/2020 3/23/2026, 91 FR 13747\nSection 117.8010 Compliance Stack Test Reports 5/30/2007 12/3/2008, 73 FR 73562\nDivision 2—Emission Monitoring\nSection 117.8100 Emission Monitoring System Requirements for Industrial, Commercial, and Institutional Sources 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.8110 Emission Monitoring System Requirements for Utility Electric Generation Sources 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.8120 Carbon Monoxide (CO) Monitoring 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.8130 Ammonia Monitoring 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.8140 Emission Monitoring for Engines 5/30/2007 12/3/2008, 73 FR 73562\nSubchapter H—Administrative Provisions\nDivision 1—Compliance Schedules\nSection 117.9000 Compliance Schedule for Beaumont-Port Arthur Ozone Nonattainment Area Major Sources 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.9020 Compliance Schedule for Houston-Galveston-Brazoria Ozone Nonattainment Area Major Sources 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.9030 Compliance Schedule for Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Major Sources 3/4/2020 3/23/2026, 91 FR 13747\nSection 117.9100 Compliance Schedule for Beaumont-Port Arthur Ozone Nonattainment Area Utility Electric Generation Sources 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.9120 Compliance Schedule for Houston-Galveston-Brazoria Ozone Nonattainment Area Utility Electric Generation Sources 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.9130 Compliance Schedule For Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Utility Electric Generation Sources 6/3/2015 4/13/2016, 81 FR 21750\nSection 117.9200 Compliance Schedule for Houston-Galveston-Brazoria Ozone Nonattainment Area Minor Sources 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.9210 Compliance Schedule for Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Minor Sources 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.9300 Compliance Schedule for Utility Electric Generation in East and Central Texas 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.9320 Compliance Schedule for Cement Kilns 5/30/2007 1/14/2009, 74 FR 1927\nSection 117.9340 Compliance Schedule for East Texas Combustion 5/30/2007 12/3/2008, 73 FR 73562\nSection 117.9500 Compliance Schedule for Nitric Acid and Adipic Acid Manufacturing Sources 5/30/2007 12/3/2008, 73 FR 73562\nDivision 2—Compliance Flexibility\nSection 117.9800 Use of Emission Credits For Compliance 6/3/2015 4/13/2016, 81 FR 21750\nSection 117.9810 Use of Emission Reductions Generated from the Texas Emissions Reduction Plan (TERP) 6/3/2015 5/11/2017, 82 FR 21925\nChapter 118 (Reg 8)—Control Of Air Pollution Episodes\nSection 118.1 Generalized Air Pollution Episodes 03/05/00 07/26/00\nSection 118.2 Provisions Governing Generalized Episode Control 03/05/00 07/26/00\nSection 118.3 Localized Air Pollution Episodes 03/05/00 07/26/00\nSection 118.4 Hearings. 03/05/00 07/26/00\nSection 118.5 Emission Reduction Plan 03/05/00 07/26/00\nSection 118.6 Texas Air Pollution Episode Contingency Plan and Emergency Management Center 03/05/00 07/26/00\nChapter 122—Federal Operating Permits Program\nSubchapter B—Permit Requirements\nDivision 2—Applicability\nSection 122.122 Potential to Emit 3/26/2014 11/10/2014 79 FR 66626 The SIP does NOT include 30 TAC Section 122.122(e)(3), (e)(3)(A), or (e)(3)(B).\n(d) EPA-Approved State Source-Specific Requirements.\nEPA-Approved Texas Source-Specific Requirements\nName of Source Permit or Order Number State Effective Date EPA Approval Date Comments\nAlcoa Inc., Rockdale, Milam County, Texas Agreed Order No. 2000-0032-SIP 4/19/2000 10/26/00, 65 FR 64155 H/GA, D/FW, and B/PA, Texas 1-hour ozone standard attainment demonstrations.\nEastman Chemical Company, Texas Operations, Longview, Harrison County, Texas Agreed Order No. 2000-0033-SIP 4/19/2000 10/26/00, 65 FR 64156 H/GA, D/FW, and B/PA, Texas 1-hour ozone standard attainment demonstrations.\nGould National Battery, Incorporated Order Nos. 92-09(k), 93-12, 99-0351-SIP 9/3/92, 6/2/93, 7/8/99, respectively 11/29/94, 11/29/94, October 13, 1999, respectively 92-09(k) and 93-12 were incorporated by reference in our approval of the lead SIP on 11/29/94, (59 FR 60905).\nContinental Airlines at George Bush Intercontinental Airport, Houston, Texas Agreed Order No. 2000-0826-SIP 10/18/00 11/14/2001, 66 FR 57222 HGA, Texas 1-hour ozone standard attainment demonstrations.\nSouthwest Airlines at William Hobby Airport, Houston, Texas Agreed Order No. 2000-0827-SIP 12/06/00 11/14/2001, 66 FR 57222 HGA, Texas 1-hour ozone standard attainment demonstrations.\nAmerican Airlines, American Eagle Airlines at D/FW International airport, Texas Agreed Order No. 2000-1149-SIP 5/23/2001 4/22/2002, 67 FR 19516 DFW, Texas 1-hour ozone standard attainment demonstrations.\nDelta Airlines at D/FW International Airport, Texas Agreed Order No. 2001-0221-AIR 5/23/2001 4/22/2002, 67 FR 19516 DFW, Texas 1-hour ozone standard attainment demonstrations.\nSouthwest Airlines at Love Field, Texas Agreed Order No. 2001-0222-AIR 5/23/2001 4/22/2002, 67 FR 19516 DFW, Texas 1-hour ozone standard attainment demonstrations.\nExxonMobil Oil Corporation, Jefferson County, Texas Agreed Order No. 2004-0846-SIP 12/15/2004 4/12/2005, 70 FR 18995\nHuntsman Petrochemical Corporation, Port Neches Plant, Jefferson County, Texas Agreed Order No. 2004-0882-SIP 12/15/2004 4/12/2005, 70 FR 18995\nHuntsman Petrochemical Corporation, Port Arthur Plant, Jefferson County, Texas Agreed Order No. 2004-0845-SIP 12/15/2004 4/12/2005, 70 FR 18995\nISP Elastomers, Jefferson County, Texas Agreed Order No. 2004-0842-SIP 12/15/2004 4/12/2005, 70 FR 18995\nMobil Chemical Company, Division of ExxonMobil Oil Corporation, Jefferson County, Texas Agreed Order No. 2004-0841-SIP 12/15/2004 4/12/2005, 70 FR 18995\nMotiva Enterprises LLC, Jefferson County, Texas Agreed Order No. 2004-0843-SIP 12/15/2004 4/12/2005, 70 FR 18995\nPremcor Refining Group, Inc., Jefferson County, Texas Agreed Order No. 2004-0844-SIP 12/15/2004 4/12/2005, 70 FR 18995\nMobil Chemical Company, Division of ExxonMobil Oil Corporation, Jefferson County, Texas Agreed Order No. 2004-1654-SIP 12/15/2004 4/12/2005, 70 FR 18995\nAmerican Electric Power Knox Lee Plant (Gregg Co.), Pirkey Plant (Harrison Co.), Wilkes Plant (Cass Co.) 2001-0878-RUL 03/13/2002 8/19/2005, 70 FR 48642\nTexas Utilities Martin Lake plant (Rusk Co.), Monticello plant (Titus Co.) 2001-0879-RUL 03/13/2002 8/19/2005, 70 FR 48642\nEastman Chemical Company Longview plant (Harrison Co.) 2001-0880-RUL 03/13/2002 8/19/2005, 70 FR 48642\nAlcoa Inc, Rockdale, Milam County, Texas Permit Number 48437 4/27/05 8/15/2008, 73 FR 47835\nExide Technologies Agreed Order No. 2011-0521-MIS 8/14/2012 6/29/2017, 82 FR 29430\nTXI Operations LP (Texas Industries, Inc., TXI), Kiln #5, Ellis County, Texas Agreed Order No. 2017-1648-SIP 08/21/18 02/22/19, 84 FR 5602 DFW 2008 8-Hour ozone standard.\n(e) EPA approved nonregulatory provisions and quasi-regulatory measures.\nEPA Approved Statutes in the Texas SIP\nTitle/Subject State approval/submittal date EPA approval date Comments\nTexas Clean Air Act (Article 4477-5), Vernon's Texas Civil Statutes 1/28/72 05/31/72, 37 FR 10895 As amended by S.B. 48 of 1969.\nArticle 698d Air Pollution, Penal Code of Texas, 1925 1/28/72 05/31/72, 37 FR 10895 As amended by S.B. No. 5 of 1969.\nHouse Bill 322 1/28/72 05/31/72, 37 FR 10895 As passed by the 62nd Legislature of Texas, amending the Texas Clean Act regarding permits for construction or modification of facilities.\nTexas Clean Air (Tex. Rev. Civ. Stat. Ann. Art. 4477-5) as amended June 13, 1979 7/23/81 12/15/81, 46 FR 61125 Ref 52.2299(c)(29).\nAir Pollution (Tex. Rev. Civ. Stat. Ann. Art. 4477-5b) as amended January 1, 1974 7/23/81 12/15/81, 46 FR 61125 Ref 52.2299(c)(29).\nTexas Administrative Procedure and Texas Register Act 07/23/81 12/15/81, 46 FR 61125 Ref 52.2299(c)(29).\n(Tex. Rev. Civ. Stat. Ann. Art. 6252-13a) effective January 1, 1976 7/23/81 12/15/81, 46 FR 61125 Ref 52.2299(c)(29).\nTexas Open Record Act (Tex. Rev. Civ. Stat. Ann. Art. 6252-17a) as amended May 27, 1975 07/23/81 12/15/81, 46 FR 61125 Ref 52.2299(c)(29).\nStandards of Conduct of State Officers and Employees (Tex. Rev. Civ. Stat. Ann. Art. 6252-9b) effective January 1, 1974 7/23/81 12/15/81, 46 FR 61125 Ref 52.2299(c)(29).\nDepartment of Public Safety and Texas Air Control Board Rules and Regulations, Texas Vehicle Inspection Act Article XV 11/9/84 06/26/85, 50 FR 26362 Ref 52.2299(c)(61).\nDocumentation to Authorize and Support the Implementation and Enforcement of the Texas Vehicle parameter Inspection and Maintenance Program, Appendix X, containing the following documents:\nA. Senate Bill 1205 11/9/84 06/26/85, 50 FR 26362 Ref 52.2299(c)(61).\nB. Letters of Commitment from Texas Department of Public Safety City of Houston Police Department and Harris County Sheriff 11/9/84 06/26/85, 50 FR 26362 Ref 52.2299(c)(61).\nC. Parameter Vehicle Emission Inspection and Maintenance Rules and Regulations for Official Vehicle Inspection Stations and Certified Inspectors, July 1, 1984 11/9/84 06/26/85, 50 FR 26362 Ref 52.2299(c)(61).\nTexas Motor Vehicle Laws, 1981-1982—Rules and Regulations for Official Vehicle Inspection Stations and Certified Inspectors, November 11, 1983, Sections A,B,C, pages C-1, C-16, C-17, C-18, C-26, C-27, and C-28, D, and E pages E-1, E-6, E-7, E-8, and E-9 11/9/84 06/26/85, 50 FR 26362 Ref 52.2299(c)(61).\nVIMTCM, Appendix AJ, Excerpted Senate Bill 725, section 35(d) and (g) effective September 1, 1985; and House Bill 1593 sections 21 and 22 effective June 18, 1987 09/30/85 and 12/21/87 02/09/89, 54 FR 06287 Ref 52.2299(c)(66).\nTexas Clean Air Act (TCAA), Texas Health and Safety Code Ann. (Vernon 1992), Section 382.0365, “Small Business Stationary Source Assistance Program”, enacted by the Texas 1991 legislative session and effective September 1, 1991 11/13/92 08/19/94, 59 FR 42759 Ref 52.2299(c)(85).\nLegal opinion letter dated October 15, 1992 from Kirk P. Watson, Chairman, TACB, to Mr. B.J. Wynne, III, Regional Administrator, EPA Region 6, regarding the composition of the Small Business Compliance Advisory Panel of Texas 11/13/92 08/19/94, 59 FR 42759 Ref 52.2299(c)(85).\nHouse Bill 1969, an act relating to motor vehicle registration, inspections, and providing penalties amending:\n(1) Sections 382.037 and 382.038 of the Texas Health and Safety Code; 11/12/93 and 03/09/94 08/22/94, 59 FR 43046 Ref 52.2299(c)(87).\n(2) Section 2 Chapter 88, General Laws, Acts of the 41st legislature, 2nd called session, 1929 (Article 6675a-2, Vernon's Texas Civil Statutes); 11/12/93 and 03/09/94 08/22/94, 59 FR 43046 Ref 52.2299(c)(87).\n(3) Title 116, Article 6675b-4, 6675b-4A, and 6675b-4B; 11/12/93 and 03/09/94 08/22/94, 59 FR 43046 Ref 52.2299(c)(87).\n(4) Section 141(d), and section 142(h), Uniform Act Regulating Traffic on Highways (Article 6701d, Vernon's Civil Statutes); 11/12/93 and 03/09/94 08/22/94, 59 FR 43046 Ref 52.2299(c)(87).\n(5) Section 4.202, County Road and Bridge Act (Article 6702-1, Vernon's Texas Civil Statutes). Signed by the Governor on 1/8/93, effective 08/30/93 11/12/93 and 03/09/94 08/22/94, 59 FR 43046 Ref 52.2299(c)(87).\nTexas Health and Safety Code (Vernon 1990), the Texas Clean Air Act, sections 382.017, 382.037, 382.038, effective September 1, 1991 11/12/93 and 3/09/94 8/22/94, 59 FR 43046 Ref 52.2299(c)(87).\nOrder No. 93-23, as adopted November 10, 1993, and Order No. 94-02 as adopted February 16, 1994 11/12/93 and 03/09/94 08/22/94, 59 FR 43046 Ref 52.2299(c)(87).\nTexas Civil Statutes, Articles 6675a-1 to 6675b-2 and 6687-1. (Vernon 1993) 11/12/93 and 03/09/94 08/22/94, 59 FR 43046 Ref 52.2299(c)(87).\nTexas Portable Fuel Container State Implementation Plan All Affected 1997 Eight-Hour Ozone Standard Nonattainment And Near Nonattainment Areas In The State Of Texas 3/4/2010 2/24/2011, 76 FR 10249\nEPA Approved Nonregulatory Provisions and Quasi-Regulatory Measures in the Texas SIP\nName of SIP provision Applicable geographic or nonattainment area State submittal/effective date EPA approval date Comments\nPublic Hearings Statewide 2/8/72 05/31/72, 37 FR 10895 Ref 52.2299(c)(1).\nHydroCarbon Emission Data Statewide 5/2/72 05/31/72, 37 FR 10895 Ref 52.2299(c)(2).\nSource Surveillance Statewide 5/3/72 5/31/72, 37 FR 10895 Ref 52.2299(c)(2).\nMinor Revisions Statewide 07/31/72 10/28/72, 37 FR 23092 Ref 52.2299(c)(4).\nAttainment Date Corrections Statewide 11/10/72 2/8/73, 38 FR 03600 Ref 52.2299(c)(6).\nClassification Revisions for PM, SOx, and CO Statewide 03/21/75 4/18/77, 42 FR 20131 Ref 52.2299(c)(9).\nAdministrative Revisions Statewide 4/20/77, 42 FR 20463 Ref 52.2299(c)(11).\nAir Quality Surveillance Plan Statewide 08/02/76 4/18/77, 42 FR 20131 Ref 52.2299(c)(12).\nAir Quality Surveillance Plan Statewide 08/12/77 3/7/78, 43 FR 09276 Ref 52.2299(c)(13).\nAdministrative Revisions to Section X Statewide 7/6/77, 42 FR 34518 Ref 52.2299(c)(14).\nAdministrative Revisions to Section IX Statewide 08/14/78 4/11/79, 44 FR 21644 Ref 52.2299(c)(16).\nBoard Order No. 78-6 Corpus Christi, TX 07/24/78 09/24/79, 44 FR 55005 Ref 52.2299(c)(17) (see 52.2275)\nDraft inspection/mainte- nance legislation and study schedule Harris County 4/13/79 12/18/79, 44 FR 74831 Ref 52.2299(c)(18).\nAdopted inspection/maintenance legislation and administrative revisions Harris County 08/09/79 12/19/79, 44 FR 74831 Ref 52.2299(c)(19).\nPlan Revisions (Part D requirements) Statewide 4/13/79 03/25/80, 45 FR 19244 Ref 52.2299(c)(20).\nAdministrative Revisions to Transportation Control Statewide 08/09/79 03/25/80, 45 FR 19244 Ref 52.2299(c)(21).\nTransportation Control Measures for Harris County Harris County 12/28/79 08/06/80, 45 FR 52148 Ref 52.2299(c)(24).\nBoard Order No. 78-8 General Portland, Inc., New Braunfels, Comal County, TX 09/13/78 08/28/81, 46 FR 43425 Ref 52.2299(c)(26). (See 52.2276).\nAdministrative Revision to Section I Statewide 07/23/81 11/13/81, 46 FR 55970 Ref 52.2299(c)(28).\nAdministrative Revision to Section V Statewide 07/23/81 12/15/81, 46 FR 61125 Ref 52.2299(c)(29).\nPlan Revisions for Intergovernmental Consultation and Composition Statewide 4/13/79 03/29/82, 47 FR 13143 Ref 52.2299(c)(32).\nTexas Lead SIP and Board Order No. 82-11 Statewide excluding Dallas and El Paso areas 06/12/80 10/4/83, 48 FR 45248 Ref 52.2299(c)(41).\nTexas Air Pollution Emergency Episode Contingency Plan Statewide 05/18/82 10/07/82, 47 FR 44261 Ref 52.2299(c)(42).\nAdministrative Revision to Section XII Statewide 07/06/82 10/25/82, 47 FR 47247 Ref 52.2299(c)(47).\nAdministrative Revision to Section III N/A 08/17/82 03/31/83, 48 FR 13428 Ref 52.2299(c)(51).\nAdministrative Revision to Section IX Statewide 06/22/83 11/07/83, 48 FR 51153 Ref 52.2299(c)(52).\nLead Plan for Dallas County, TX Dallas County, TX 4/6/84 08/15/84, 49 FR 32580 Ref 52.2299(c)(54).\nRevisions to Lead Plan for Dallas County, TX Dallas County, TX 07/16/84 08/15/84, 49 FR 32580 Ref 52.2299(c)(55).\nLead Plan for El Paso County El Paso County, TX 06/20/84 08/13/84, 49 FR 32190 Ref 52.2299(c)(56).\nAlternative Emission Control Plan for Exxon Baytown Refinery Baytown, TX 03/18/83 07/10/85, 50 FR 26992 Ref 52.2299(c)(60) (Board Order No. 83-2).\nPlan for Ozone Attainment in Harris County Harris County, TX 12/09/82, 1/3/84, 03/18/85 06/26/85, 50 FR 26362 Ref 52.2299(c)(61).\nAlternative Emission Reduction Plan for Continental Can Company, Longview, TX Gregg County, (Longview), TX 07/25/85 05/05/89, 54 FR 19373 Ref 52.2299(c)(64).\nRevision to Lead Plan for El Paso County and Board Order No. 87-14 El Paso County, TX 10/26/87 05/06/88, 53 FR 16263 Ref 52.2299(c)(65).\nOzone Attainment Plan for Dallas and Tarrant Counties Dallas and Tarrant Counties, TX 09/30/85 and 12/21/87 02/09/89, 54 FR 06287 Ref 52.2299(c)(66).\nVehicle Inspection and Maintenance Dallas-Fort Worth, El Paso County and Houston-Galveston-Brazoria 6/11/2015 10/7/2016, 81 FR 69684\nVIMTCM, Appendix AK, Portions 1 through 6 Dallas and Tarrant Counties, TX 12/18/87 02/09/89, 54 FR 06287 Ref 52.2299(c)(66).\nVIMTCM, Appendix AM, Sections 1, 2, and 3 Dallas and Tarrant Counties, TX 12/18/87 02/09/89, 54 FR 06287 Ref 52.2299(c)(66).\nVIMTCM, Appendix AN Dallas and Tarrant Counties, TX 12/18/87 02/09/89, 54 FR 06287 Ref 52.2299(c)(66).\nPart II of the Visibility Protection Plan and Board Order No. 87-15 Big Bend and Guadalupe Mountain National Parks 09/18/87 02/23/89, 54 FR 07770 Ref 52.2299(c)(67).\nAlternative Emission Reduction Plan (Bubble) for E.I. DuPont de Nemours \u0026 Company's Sabine River Works, Orange, TX Orange County, TX 03/12/82 4/13/90 Ref 52.2299(c)(70).\nRevisions to Texas Air Pollution Episode Contingency Plan Statewide 10/02/87 09/06/90, 55 FR 36634 Ref 52.2299(c)(71).\nRevisions to Ozone Attainment Plan for Dallas and Tarrant Counties Dallas and Tarrant Counties, TX 03/05/90 08/03/90, 55 FR 31587 Ref 52.2299(c)(72).\nRevisions for Prevention of Significant Deterioration and Board Orders No. 85-07, 87-09, and 88-08 Statewide 12/11/85, 10/26/87, 9/29/88 06/4/92, 57 FR 28098 Ref 52.2299(c)(73). For Board Order 87-09, the provisions at paragraphs 7(a) and 7(b) have been replaced by EPA's SIP-approval of 30 TAC 39.411(f)(8)(A) and 39.605(1)(D). See 1/6/14, 79 FR 551\nBoard Order No. 90-07 Tarrant County 06/22/90 10/12/90, 55 FR 41525 Ref 52.2299(c)(74).\nBoard Order No. 92-19 Statewide 09/18/92 08/30/93, 58 FR 45457 Ref 52.2299(c)(76).\nRevision for Prevention of Significant Deterioration and Board Order No. 90-13 Statewide 12/14/90 09/09/94, 59 FR 46557 Ref 52.2299(c)(78).\nRevision addressing PM-10 nonattainment area requirements for El Paso and Board Orders 89-03 and 91-15 El Paso, TX 11/05/91 1/18/94, 59 FR 02535 Ref 52.2299(c)(79).\nCity of El Paso, TX, Ordinance, Title 9 El Paso, TX 12/11/90 1/18/94, 59 FR 02535 Ref 52.2299(c)(79).\nBoard Order No. 92-16 Ozone nonattainment areas 10/16/92 4/15/94, 59 FR 17943 Ref 52.2299(c)(81).\nBoard Order No. 92-20 Ozone nonattainment areas 08/20/92 08/26/94, 59 FR 44039 Ref 52.2299(c)(82).\nRevision for the El Paso CO nonattainment area and Board Order No. 92-15 El Paso County, TX 09/18/92 09/12/94, 59 FR 46766 Ref 52.2299(c)(84).\nSmall Business Stationary Source Technical and Environmental Compliance Assistance Program Statewide 11/13/92 08/19/94, 59 FR 42759 Ref 52.2299(c)(85).\nBoard Order No. 92-22 Statewide 11/06/92 08/19/94, 59 FR 42759 Ref 52.2299(c)(85).\nBoard Order No. 92-04 N/A 5/8/92 3/7/95, 60 FR 12438 Ref 52.2299(c)(88).\nBoard Order No. 92-16 N/A 10/16/92 3/7/95, 60 FR 12438 Ref 52.2299(c)(88).\nRevision to Modify SLAMS and NAMS Monitoring Systems and Board Order No. 93-24 Statewide 11/10/93 10/4/94, 59 FR 50504 Ref 52.2299(c)(90).\nEmployer Trip Reduction Program and Board Order No. 92-14 Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery, and Waller Counties 11/13/92 03/07/95, 60 FR 12442 Ref 52.2299(c)(91).\nRevision limiting SO2 by agreed orders 94-09 through 94-22 Certain Nonpermitted facilities in Harris County 08/03/94 03/06/95, 60 FR 12125 Ref 52.2299(c)(93).\nRevision addressing visible emissions with Board Orders 89-03, 90-12, 92-19, and 93-06 Statewide 08/21/89, 1/29/91, 10/15/92, and 8/4/93 05/8/96, 61 FR 20732 Ref 52.2299(c)(94).\nAlternative Emission Reduction (Bubble) for Shell Oil Company's Deer Park manufacturing complex Deer Park, TX 07/26/93 06/19/95, 60 FR 31915 Ref 52.2299(c)(95).\nTransportation Conformity and Board Order No. 94-40 Areas designated nonattainment and areas subject to a maintenance plan 10/12/94 11/8/95, 60 FR 56244 Ref 52.2299(c)(96).\nRevision to Permitting Regulations and Board Orders No. 85-07, 87-09, 87-17, 88-08, 89-06, 90-05, 91-10, 92-06, 92-18, and 93-17 Statewide 07/26/85, 07/17/87, 12/18/87, 07/15/88, 08/11/89, 05/18/90, 09/20/91, 5/8/92, 10/16/92, 08/16/93 09/27/95, 60 FR 49781 Ref 52.2299(c)(97).\nVOC RACT Negative Declarations Beaumont/Port Arthur, Dallas/Fort Worth, El Paso, Houston/Galveston 1/10/96 10/30/96, 61 FR 55894 Ref 52.2299(c)(103).\nVOC RACT Negative Declaration for SOCMI Batch Processing Source Category El Paso 1/10/96 6/7/07, 72 FR 31457.\nAlternate Control Strategy for Bell Helicopter Textron, Inc. Ft Worth, TX, Plant 1 facility 4/18/96 05/30/97, 62 FR 29297 Ref 52.2299(c)(100).\nRevisions to the Plan concerning Sulfur Dioxide in Milam County Rockdale, TX 10/15/92 and 09/20/95 09/30/97, 61 FR 49685 Ref 52.2299(c)(101).\nTNRCC Order No. 93-20, 94-06, 94-26, 94-0676-SIP The four ozone nonattainment areas in TX 11/10/93, 5/4/94, 07/13/94, 11/9/94 05/22/97, 62 FR 27964 Ref 52.2299(c)(104).\n15% ROP Plan Beaumont/Port Arthur ozone nonattainment area 08/09/96 2/10/98, 63 FR 6659 Ref 52.2299(c)(107).\n15% ROP Plan Dallas/Ft Worth, El Paso, and Houston/Galveston ozone nonattainment areas 8/9/96 11/10/98, 63 FR 62943 Ref 52.2299(c)(113) See also 52.2309.\nLead Maintenance Plan for Gould National Battery, Incorporated Collin County 08/31/99 10/13/99, 64 FR 55425 Ref. 59 FR 60905 (11/29/94).\nPost 96 Rate of Progress Plan Houston, Texas 5/19/98 4/25/01 66 FR 20750 Originally submitted 11/9/94 and revised 8/9/96.\nContingency Measures Houston, Texas 5/19/98 4/25/01 66 FR 20751 Originally submitted 11/9/94 and revised 8/9/96.\nPost 96 Rate of Progress Plan Houston, Texas 5/19/98 4/25/01 66 FR 20750 Originally submitted 11/9/94 and revised 8/9/96.\nContingency Measures Houston, Texas 5/19/98 4/25/01 66 FR 20751 Originally submitted 11/9/94 and revised 8/9/96.\nAttainment Demonstration for the 1-hour Ozone NAAQS Houston/Galveston, TX 1 12/09/00 11/14/01, 66 FR 57195\nSpeed Limit Reduction Houston/Galveston, TX 9/26/02 11/14/02, 67 FR 68944 Section 6.3.12\nVoluntary Mobile Emissions Program Houston/Galveston, TX 9/26/02 11/14/02, 67 FR 68944\nTexas Senate Bill 5 Houston/Galveston, TX 9/26/00 11/14/01, 66 FR 57195\nTransportation Control Measures Appendix I Houston/Galveston, TX 12/09/00 11/14/01, 66 FR 57195\nCommitment to Mid-course review Houston/Galveston, TX 4/19/01 11/14/01, 66 FR 57195\nTable 7.1-1 Enforceable Commitments Houston/Galveston, TX 9/26/01 11/14/01, 66 FR 57195\n15% Rate of Progress Plan Houston/Galveston, TX 12/09/00 11/14/01, 66 FR 57195\nRevisions to the 1990 Base Year Inventory Houston/Galveston, TX 12/09/00 11/14/01, 66 FR 57195\nReasonably Available Control Measure Analysis Houston/Galveston, TX 9/26/01 11/14/01, 66 FR 57195\nMemorandum of Agreement between TNRCC and Houston Airport System Houston/Galveston Area Ozone Nonattainment Area 10/18/2000 11/14/01, 66 FR 57222 HGA, Texas 1-hour ozone standard attainment demonstrations.\nVehicle Miles Traveled Offset Plan Houston/Galveston Ozone nonattainment area 05/09/00 11/14/01, 66 FR 57251 Originally submitted 11/12/93 and revised 11/06/94, 8/25/97, and 05/17/00.\nMemorandum of Agreement between TNRCC and the City of Dallas, Texas Dallas/Fort Worth Ozone Nonattainment Area. 5/23/01 4/22/02, 67 FR 19516 DFW, Texas 1-hour ozone standard attainment demonstrations.\nMemorandum of Agreement between TNRCC and the City of Fort Worth, Texas Dallas/Fort Worth Ozone Nonattainment Area. 5/23/01 4/22/02, 67 FR 19516 DFW, Texas 1-hour ozone standard attainment demonstrations.\nMemorandum of Agreement between TNRCC and the D/FW International Airport Board, Texas Dallas/Fort Worth Ozone Nonattainment Area. 5/23/01 4/22/02, 67 FR 19516 DFW, Texas 1-hour ozone standard attainment demonstrations.\nTransportation Control Measures SIP Revision All Nonattainment and Maintenance Areas 5/9/2000 12/5/2002, 67 FR 72382 Chapter 1. Introduction, Chapter 2. General, and Chapter 3. Criteria and Procedures.\nSection 179B Demonstration of Attainment for Carbon Monoxide for El Paso El Paso CO nonattainment area 09/27/95 07/02/03, 68 FR 39460 Supplemented 02/11/98.\nCarbon Monoxide On-Road Emissions Budget for Conformity El Paso CO nonattainment area 09/27/95 07/02/03\nContingency Measure for El Paso Carbon Monoxide Area El Paso CO nonattainment area 09/27/95 07/02/03, 68 FR 39460\nSection 179B Attainment Demonstration Report El Paso ozone nonattainment area 10/03/94 6/10/04 Approval includes a revision submitted 08/09/96.\nDeferral of the post 1996 RFP El Paso ozone nonattainment area 6/10/04\nEnforceable commitment to conduct additional modeling for the area as new data become available. This modeling effort will be conducted under the auspices of the 1983 La Paz Agreement between the United States and Mexico El Paso ozone nonattainment area 10/03/94 6/10/04\nVOC and NOX Motor Vehicle Emissions Budget for Conformity El Paso ozone nonattainment area 12/11/97 6/10/04\nSecond 10-year maintenance plan for Victoria County Victoria 2/5/03 1/3/05, 70 FR 22\nPost 1999 Rate of Progress Plan Houston/Galveston, TX 11/16/04 2/14/05, 70 FR 7407\nRevisions to the 1990 Base Year Inventory Houston/Galveston, TX 11/16/04 2/14/05, 70 FR 7407\nApproval of the Post-1996 Rate-of-Progress Plan and Motor Vehicle Emission Budgets Dallas-Fort Worth 10/25/1999 3/28/05, 70 FR 15592\nAdjustments to the 1990 base year emissions inventory Dallas-Fort Worth 10/25/1999 3/28/05, 70 FR 15592\nApproval of the 15% Rate of Progress Plan and the Motor Vehicle Emissions Budget Dallas-Fort Worth 9/8/1996 4/12/2005, 70 FR 18993\nMemorandum of Agreement between Texas Council on Environmental Quality and the North Central Texas Council of Governments Providing Emissions Offsets to Dallas Fort Worth International Airport Dallas-Fort Worth 1/14/04 4/22/05, 70 FR 20816\nClean Air Action Plan, 8-hour ozone standard attainment demonstration, and Transportation Emission Reduction Measures (TERMs) for the Austin EAC area Bastrop, Caldwell, Hays, Travis and Williamson Counties, TX 12/06/04 8/19/05, 70 FR 48640\nClean Air Action Plan and 8-hour ozone standard attainment demonstration for the Northeast Texas Early Action Compact area Gregg, Harrison, Rusk, Smith and Upshur Counties, TX 12/06/04 8/19/05, 70 FR 48642\nClean Air Plan, 8-hour ozone standard attainment demonstration and Transportation Emission Reduction Measures (TERMs) for the San Antonio EAC area Bexar, Comal, Guadalupe, and Wilson Counties, TX 12/06/04 8/22/05, 70 FR 48877\nVoluntary Mobile Emission Program Dallas/Fort Worth, TX 4/25/00 8/26/05, 70 FR 50208\nDallas—Fort Worth SIP, Appendix G; Transportation Control Measures in the Dallas/Fort Worth Ozone Nonattainment Area Dallas/Fort Worth Ozone Nonattainment Area 1/14/04 09/27/05, 70 FR 56374\nApproval of the Speed Limits Local Initiative Measure in the DFW nine county area. Affected counties are Dallas, Tarrant, Collin, Denton, Parker, Johnson, Ellis, Kaufman, Rockwall Dallas-Fort Worth 9/16/2010 1/9/2014, 79 FR 1596 Recategorized as a Transportation Control Measure.\nMemorandum of Understanding Between the Texas Department of Transportation and the Texas Natural Resource Conservation Commission Statewide 08/15/02 12/12/2005, 70 FR 73380\nPost 1996 Rate of Progress Plan Beaumont/Port Arthur, TX 11/16/04 2/22/06, 71 FR 8965\nRevisions to the 1990 Base Year Inventory Beaumont/Port Arthur, TX 11/16/04 2/22/06, 71 FR 8965\nAttainment Demonstration for Houston/Galveston/Brazoria (HGB) One-hour Ozone Nonattainment Area Adopting Strategy Based on NOX and Point Source Highly-Reactive VOC Emission Reductions Houston/Galveston, TX 12/1/04 09/06/06, 71 FR 52670\nTexas Clean Air Interstate Rule Nitrogen Oxides Annual Trading Program Abbreviated SIP Revision Statewide 07/12/06 07/30/07, 72 FR 41453 Only CAIR Phase I NOX Annual and CSP Allocations approved into SIP.\n2002 Emissions Inventory Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX 4/27/05 8/15/2008, 73 FR 47835\nEnergy Efficiency Measures Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX 4/27/05 8/15/2008, 73 FR 47835\nEl Paso County Carbon Monoxide Maintenance Plan El Paso, TX 2/13/08 8/4/08, 73 FR 45162\nDallas-Fort Worth 1997 8-hour ozone Attainment Demonstration SIP and its 2009 attainment MVEBs, RACM demonstration, and Failure-to-Attain Contingency Measures Plan Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX May 23, 2007, November 7, 2008 January 14, 2009, 74 FR 1903 Conditional Approval.\nTransportation Control Measures Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX May 23, 2007 January 14, 2009, 74 FR 1903\nVMEP Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX May 23, 2007 January 14, 2009, 74 FR 1903\nVOC RACT finding for the 1-hour ozone NAAQS and the 1997 8-hour ozone NAAQS Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX May 23, 2007 January 14, 2009, 74 FR 1903\nEl Paso County 1997 8-Hour Ozone Maintenance Plan El Paso, TX 1/11/06 1/15/09, 74 FR 2387\nApproval of the 1997 8-hour Ozone 15% Reasonable Further Progress Plan, and 2008 RFP Motor Vehicle Emission Budgets Dallas/Fort Worth, TX 05/23/07 10/7/08, 73 FR 58475\nRevised 2002 Base Year Emissions Inventory Dallas/Fort Worth, TX 05/23/07 10/7/08, 73 FR 58475\nApproval of the 1997 8-hour Ozone 15% Reasonable Further Progress Plan, and 2008 RFP Motor Vehicle Emission Budgets Houston-Galveston-Brazoria, TX 5/23/07 4/22/09, 74 FR 18298\n2002 Base Year Emissions Inventory Houston-Galveston-Brazoria, TX 5/23/07 4/22/09, 74 FR 18298\nVOC and NOX RACT demonstration for the 1-hour ozone NAAQS Beaumont/Port Arthur Area: Hardin, Jefferson, and Orange Counties 9/28/2005 7/10/2009, 74 FR 33146\nRedesignation Request for the 1997 8-hour Ozone NAAQS (Hardin, Jefferson, and Orange Counties) Beaumont/Port Arthur, TX 12/10/2008 10/20/2010, 75 FR 64675\nDetermination of Attainment for the 1-hour Ozone NAAQS (Hardin, Jefferson, and Orange Counties) Beaumont/Port Arthur, TX 12/10/2008 10/20/2010, 75 FR 64675\n2002 Base Year Emissions Inventory (1997 8-hour Ozone NAAQS) Beaumont/Port Arthur, TX 12/10/2008 10/20/2010, 75 FR 64675\nTexas Clean-Fuel Vehicle Program Equivalency Demonstration (1-hour Ozone NAAQS) Beaumont/Port Arthur, TX 12/10/2008 10/20/2010, 75 FR 64675\nSubstitute Control Measures for the SIP-Approved Failure-to-attain Contingency Measures (1-hour Ozone NAAQS) Beaumont/Port Arthur, TX 12/10/2008 10/20/2010, 75 FR 64675\nPost 1996 Rate of Progress Plan Contingency Measures (1-hour Ozone NAAQS) Beaumont/Port Arthur, TX 11/16/2004 10/20/2010, 75 FR 64675\nMaintenance Plan (1997 8-hour Ozone NAAQS, CAA Section 175A) Beaumont/Port Arthur, TX 12/10/2008 10/20/2010, 75 FR 64675\n2021 Motor Vehicle Emissions Budget (1997 8-hour Ozone NAAQS) Beaumont/Port Arthur, TX 12/10/2008 10/20/2010, 75 FR 64675\nInfrastructure and Interstate Transport for the 1997 Ozone and the 1997 and 2006 PM2.5 NAAQS. Statewide 12/12/2007, 3/11/2008, 4/4/2008, 5/1/2008, 11/23/2009 12/28/2011, 76 FR 81371 Approval for CAA elements 110(a)(2)(A), (B), (E), (F), (G), (H), (K), (L), and (M). Full approval for CAA elements 110(a)(2)(C), (D)(i)(II), (D)(ii) and (J) with approval of the GHG PSD revision (11/10/2014, 79 FR66626). 1997 and 2006 PM2.5 element D(i)(I) approved 5/14/2018, 83 FR 22208. 1997 ozone element D(i)(I) approved 12/6/2018, 83 FR 62720\nLetter of explanation and interpretation of the Texas SIP for NSR Reform Statewide 5/3/2012 10/25/2012, 77 FR 65119 Letter dated 5/3/2012 from TCEQ to EPA explains and clarifies TCEQ's interpretation of section 116.12(22); and section 116.186(a), (b)(9), and (c)(2).\nOn-Road Mobile Source Emissions Inventory and Motor Vehicle Emissions Budget Update Beaumont/Port Arthur, TX 12/10/2012 2/4/2013, 78 FR 7673 MOVES update to motor vehicle emissions budgets.\nVoluntary Mobile Emission Reduction Program (VMEP) Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX June 13, 2007 4/2/13, 78 FR 19599\nNOX RACT finding for the 1997 8-hour ozone NAAQS Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX April 6, 2010 4/2/13, 78 FR 19599\nVOC RACT finding for the 1997 8-hour ozone NAAQS Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX April 6, 2010 4/2/13, 78 FR 19599 For selected categories.\nVictoria County 1997 8-Hour Ozone Maintenance Plan Victoria, TX 7/28/2010 8/8/2013, 78 FR 48318\nReasonable Further Progress Plan (RFP), RFP Contingency Measures Houston-Galveston-Brazoria, TX 4/1/2010, 5/6/2013, 79 FR 51\nRFP Motor Vehicle Emission Budgets (2008, 2011, 2014, 2017 and 2018) Houston-Galveston-Brazoria, TX 5/6/2013, 79 FR 51\nVehicle miles traveled offset analysis Houston-Galveston-Brazoria, TX 5/6/2013, 79 FR 51\nHouston-Galveston-Brazoria 1997 8-hour Ozone NAAQS Attainment Demonstration SIP and its MECT and HECT air pollution control program revisions, VMEP measures and TCMs, 2018 MVEB, RACM demonstration, and Failure to attain contingency measure plan Houston-Galveston-Brazoria, TX 4/6/2010 5/6/2013 1/2/2014, 79 FR 57\nStage II Vapor Recovery Program SIP Statewide 10/9/2013 3/17/14, 79 FR 14611\nVOC RACT negative declaration for Fiberglass Boat Manufacturing Materials, Leather Tanning and Finishing, Surface Coating for Flat Wood Paneling, Letterpress Printing, Automobile and Light-Duty Truck Assembly Coating, Rubber Tire Manufacturing, and Vegetable Oil Manufacturing Operations Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX April 6, 2010.\nVOC RACT finding for the 1997 8-hour ozone NAAQS, except for the 2006-2010 EPA-issued CTG series Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX April 6, 2010 4/15/14, 79 FR 21144\nFlexible Permits Interpretative Letter from the TCEQ Statewide December 9, 2013 7/14/2014 79 FR 40666 Clarifies how the TCEQ implements the rules regarding (1) Director discretion; (2) BACT; (3) changes made by Standard Permits or Permits by Rule; (4) compliance with permit and permit application; and (5) start-up and shutdown emissions to ensure compliance with CAA requirements.\nVehicle Inspection and Maintenance Dallas-Fort Worth, El Paso County and Houston-Galveston-Brazoria 6/11/2015 10/7/2016, 81 FR 69684\nVOC RACT finding for Lithographic Printing under the 1997 8-hour ozone NAAQS, including the 2006 EPA-issued CTG Houston-Galveston-Brazoria (Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX) 4/6/2010 8/4/2014, 79 FR 45106 HGB as Severe.\nVOC RACT finding for Lithographic Printing under the 1997 8-hour ozone NAAQS, including the 2006 EPA-issued CTG Dallas-Fort Worth (Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall, and Tarrant Counties, TX) 4/6/2010 8/4/2014, 79 FR 45106 DFW as Moderate and Serious.\nConformity with the National Ambient Air Quality Standards Statewide 10/28/2011 7/18/2014, 79 FR 41908 The General Conformity SIP is removed from the Texas SIP; the federal rules at 40 CFR Part 93, subpart B apply now.\nCommitment Letter from the TCEQ regarding regulation of PSD pollutants into the future Statewide December 2, 2013 11/10/2014, 79 FR 66626 Clarifies that the TCEQ has the authority under the Texas Clean Air Act to apply the Texas PSD program to all pollutants newly subject to regulation, including non-NAAQS pollutants into the future.\nClarification Letter from the TCEQ regarding authority to administer EPA issued GHG PSD permits Statewide January 13, 2014 11/10/2014, 79 FR 66626 Clarifies that the TCEQ has the general authority to administer EPA issued GHG PSD permits. Also clarifies that the TCEQ has authority to process and issue any and all subsequent PSD actions relating to EPA issued GHG PSD permits.\nClarification Letter from the TCEQ regarding Judicial Review for PSD Permits Statewide May 30, 2014 11/10/2014, 79 FR 66626 Clarifies the judicial review process for Texas PSD permits.\nFailure-to-Attain Contingency Measures Plan Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX 3/10/2010 11/12/2014, 79 FR 67071]\nReasonable Further Progress Plan (RFP), RFP Contingency Measures, RFP Motor Vehicle Emission Budgets for 2011 and 2012, and Revised 2002 Base Year Emissions Inventory Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX 12/7/2011 11/12/2014, 79 FR 67071]\nEnhanced Ambient Monitoring and the Clean-fuel Fleet Programs Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX 12/7/2011 11/12/2014, 79 FR 67071]\nDFW nine-county area ESL TCM to traffic signalization TCMs Dallas-Fort Worth: Dallas, Tarrant, Collin, Denton, Parker, Johnson, Ellis, Kaufman and Rockwall Counties 9/16/2010 1/9/2014, 79 FR 1596 DFW ESLs recategorized as TCM 1/9/2014, substituted with traffic signalization TCMs 11/3/2014.\n2011 Emissions Inventory for the 2008 Ozone NAAQS Dallas-Fort Worth and Houston-Galveston-Brazoria Ozone Nonattainment Areas 7/16/2014 2/20/2015, 80 FR 9204\nNOX RACT finding for the 1997 8-hour ozone NAAQS Collin, Dallas, Denton, Tarrant, Ellis, Johnson, Kaufman, Parker, and Rockwall Counties, TX 1/17/12 3/27/15, 80 FR 16291 DFW as Moderate and Serious.\nVOC RACT finding of negative declaration for Fiberglass Boat Manufacturing Materials, Ship Building and Ship Repair Coating, Leather Tanning and Finishing, Surface Coating for Flat Wood Paneling, Vegetable Oil Manufacturing, Letterpress Printing, Plywood Veneer Dryers, Rubber Tire Manufacturing, and Batch Processes Operations Collin, Dallas, Denton, Tarrant, Ellis, Johnson, Kaufman, Parker, and Rockwall Counties, TX 1/17/12 3/27/15, 80 FR 16291 DFW as Moderate and Serious.\nVOC RACT finding for all sectors under the 1997 8-hour ozone NAAQS, including the 2006-2008 EPA-issued CTG series and non-CTG major sources Collin, Dallas, Denton, Tarrant, Ellis, Johnson, Kaufman, Parker, and Rockwall Counties, TX 1/17/12 3/27/15, 80 FR 16291 DFW as Moderate and Serious.\nVOC RACT finding for all sectors under the 1997 8-hour ozone NAAQS, including the 2006-2008 EPA-issued CTG series and non-CTG major sources Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX 1/17/12 3/27/15, 80 FR 16291 HGB as Severe.\nRevision to El Paso PM10 Attainment Demonstration SIP (dust control contingency measures) El Paso, TX 3/7/2012 12/14/2015, 80 FR 77254\nTexas Regional Haze SIP Statewide 3/19/2009 1/15/2016, 81 FR 350; 12/5/2025, 90 FR 56001 Texas Regional Haze Plan for the First Planning Period. Approval for elements of 40 CFR 51.308(d)(1), (2), (3)(i), (3)(ii), (3)(iii), (3)(iv), (3)(v), (d)(4).\nInfrastructure and Transport SIP Revision for the 2010 SO2 NAAQS Statewide 5/6/2013 1/11/2016, 81 FR 1128 Approval for CAA elements 110(a)(2)(A), (B), (C), (D)(i)(II) (PSD portion), D(ii), (E), (F), (G), (H), (J), (K), (L), and (M).\nInfrastructure and Interstate Transport for the 2008 Pb NAAQS Statewide 9/8/2011, 10/13/2011 1/14/2016, 81 FR 1882,\nInfrastructure and Transport SIP Revisions for the 2010 Nitrogen Dioxide Standard Statewide 12/7/2012 9/9/2016, 81 FR 62378 Approval for 110(a)(2)(A), (B), (C), (D)(i) (portions pertaining to nonattainment and interference with maintenance), D(ii), (E), (F), (G), (H), (K), (L) and (M). Approval for 110(a)(2)(J) on 10/7/2016, 81 FR 69684\nInfrastructure and Transport SIP Revisions for the 2008 Ozone Standard Statewide 12/13/2012 9/9/2016, 81 FR 62375 Approval for 110(a)(2)(A), (B), (C), (D)(i) (portion pertaining to PSD), D(ii), (E), (F), (G), (H), (K), (L) and (M). Approval for 110(a)(2)(J) 10/7/2016, 81 FR 69684\nRevisions to the State Implementation Plan (SIP) Concerning the Qualified Facility Program as Authorized by Senate Bill 1126 Statewide 9/15/2010 9/9/2016, 81 FR 62385\nDFW nine-county area US67/IH-35E HOV Lane TCM to traffic signalization TCMs Dallas-Fort Worth: Dallas, Tarrant, Collin, Denton, Parker, Johnson, Ellis, Kaufman and Rockwall Counties 8/16/2016 11/9/2016, 81 FR 78724\nAustin Early Action Compact area Vehicle Inspection and Maintenance Travis and Williamson Counties 6/11/2015 10/7/2016, 81 FR 69684\nDFW Reasonable Further Progress (RFP) Plan, RFP Contingency Measures, RFP Motor Vehicle Emission Budgets for 2017, and Revised 2011 Base Year Emissions Inventory for the 2008 Ozone NAAQS Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall, Tarrant and Wise Counties, TX 7/10/2015 12/7/2016, 81 FR 88125 Supplement submitted on April 22, 2016.\nDiscrete Emissions Reduction Credits (DERC) SIP Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX 12/10/2008 5/11/2017, 82 FR 21925\nVehicle Inspection and Maintenance, Nonattainment New Source Review and Emission Statement Requirements for the 2008 Ozone NAAQS Houston-Galveston-Brazoria, TX 12/29/2016 5/15/2017, 82 FR 22294\nVehicle Inspection and Maintenance and Nonattainment New Source Review Requirements for the 2008 Ozone NAAQS Dallas-Fort Worth, TX 7/6/2016 6/14/2017, 82 FR 27125\nSecond 10-year Lead maintenance plan for 1978 Lead NAAQS Collin County, TX 9/15/2009 6/29/2017, 82 FR 29430\nLead Attainment Demonstration for 2008 Lead NAAQS Collin County, TX 10/10/2012 6/29/2017, 82 FR 29430\nMaintenance Plan for 2008 Lead NAAQS Collin County, TX 11/02/2016 6/29/2017, 82 FR 29430\nSecond 10-year Carbon Monoxide maintenance plan (limited maintenance plan) for the El Paso CO area El Paso, TX 9/21/2016 9/8/2017, 82 FR 42457\nNOX RACT finding under the 2008 8-Hour ozone NAAQS Collin, Dallas, Denton, Tarrant, Ellis, Johnson, Kaufman, Parker, Rockwall, and Wise Counties, TX 07/10/15 09/22/17, 82 FR 44322 DFW as Moderate and Serious.\nNOX RACT finding of negative declarations for nitric acid and adipic acid operations under the 2008 8-Hour ozone NAAQS Collin, Dallas, Denton, Tarrant, Ellis, Johnson, Kaufman, Parker, Rockwall, and Wise Counties, TX 07/10/15 09/22/17, 82 FR 44322 DFW as Moderate and Serious.\nTexas Regional Haze BART Requirement for EGUs for PM Statewide 3/31/2009 10/17/2017, 82 FR 48363\nDFW VOC RACT Demonstration DFW 2008 Ozone NAAQS non-attainment area 7/10/2015 12/21/2017, 82 FR 60547\nInfrastructure and Interstate Transport for the 2012 PM2.5 NAAQS Statewide 12/1/2015 6/5/2018, 83 FR 25922 Approval for CAA elements 110(a)(2)(A), (B), (C), (D)(i)(I), (D)(i)(II) (portion pertaining to PSD), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). 6/5/2018, 83 FR 25921\nEmission Statement Requirements for the 2008 Ozone NAAQS Dallas-Fort Worth, TX 8/21/2018 12/4/2018, 83 FR 62470\nHGB Area Reasonable Further Progress (RFP) Plan, RFP Contingency Measures, RFP Motor Vehicle Emission Budgets for 2017, and Revised 2011 Base Year Emissions Inventory for the 2008 Ozone NAAQS Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX 12/29/2016 2/13/2019, 84 FR 3710\nNOX RACT finding under the 2008 8-Hour ozone NAAQS Collin, Dallas, Denton, Tarrant, Ellis, Johnson, Kaufman, Parker, Rockwall, and Wise Counties, TX 8/21/2018 02/22/19, 84 FR 5602 DFW as Moderate and Serious, also converts conditional approval 09/22/17, 82 FR 44322 to full approval.\nHGB VOC and NOX RACT Finding, except for the 2016 EPA-issued CTG for the Oil and Natural Gas Industry, EPA-453/B-16-001 HGB 2008 Ozone NAAQS non-attainment area 12/29/2016 4/30/2019, 84 FR 18145 Vegetable Oil Mfg category, previously sited under negative declarations for HGB area, is added to RACT determinations.\nInfrastructure and Interstate Transport for the 2015 Ozone NAAQS Statewide 8/17/2018 9/23/2019, 84 FR 49667 Approval for CAA elements 110(a)(2)(A), (B), (C), (D)(i)(II) (portion pertaining to PSD), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M).\nHouston-Galveston-Brazoria Redesignation Request and Maintenance Plan for the 1-hour and 1997 8-hour Ozone Standards Houston-Galveston-Brazoria, TX 12/12/2018 2/14/2020, 85 FR 8426\nDallas-Fort Worth Redesignation Request and Maintenance Plan for the 1-hour and 1997 8-hour Ozone Standards Dallas Fort-Worth, TX 3/29/2019 4/6/2020, 85 FR 19108\nBeaumont-Port Arthur Second 10-Year Maintenance Plan for the 1997 8-hour Ozone Standard Hardin, Jefferson and Orange Counties 2/5/2019 9/2/2020, 85 FR 54506\nReasonable Further Progress Plan (RFP), RFP Motor Vehicle Emission Budgets for 2020, and Revised 2011 Base Year Emissions Inventory Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery, and Waller Counties, TX 3/4/2020 5/10/2021, 86 FR 24718\n2017 Emissions Inventory for the 2015 Ozone NAAQS Dallas-Fort Worth, Houston Galveston-Brazoria, and Bexar County Ozone Nonattainment Areas 6/24/20 6/29/2021 86 FR 34140\nNonattainment New Source Review and Emission Statement Requirements for the 2015 Ozone NAAQS Dallas-Fort Worth, Houston Galveston-Brazoria, and Bexar County Ozone Nonattainment Areas June 24, 2020 9/9/2021, 86 FR 50458\nRevised 2011 Base Year Emissions Inventory Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall, Tarrant, and Wise Counties, TX 3/4/2020 9/16/2022, 87 FR 56893\nNonattainment New Source Review for the 2008 Ozone NAAQS Dallas-Fort Worth and Houston-Galveston-Brazoria nonattainment areas 5/13,2020 10/3/2022, 87 FR 59699 For the Serious classification.\nReasonable Further Progress (RFP) Plan and RFP Motor Vehicle Emission Budgets for 2020 Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall, Tarrant and Wise Counties, TX 3/4/2020 4/24/2023 88 FR 24698\nEnhanced Vehicle Inspection and Maintenance (I/M) Requirement for the 2008 Ozone NAAQS Serious Nonattainment Areas Dallas-Fort Worth and Houston-Galveston-Brazoria Ozone Nonattainment Areas 5/13/2020 9/8/2023, 88 FR 61976\nBasic I/M requirement for the 2015 Ozone NAAQS Bexar County, TX 12/18/2023 4/8/2025, 90 FR 15122 For the Moderate classification.\nInterstate transport for the 2010 SO2 NAAQS (contribute to nonattainment or interfere with maintenance) Statewide 05/06/2013 8/28/2025, 90 FR 41899 Adequate provisions prohibiting emissions which will contribute significantly to nonattainment in or interfere with maintenance of the 2010 SO2 NAAQS in any other State.\nTexas Regional Haze 5-Year Progress Report for the First Planning Period Statewide 3/24/2014, submittal date 12/5/2025, 90 FR 56001\nTexas Regional Haze SIP for the Second Planning Period Statewide 7/20/2021, submittal date 12/5/2025, 90 FR 56001\nVOC RACT negative declarations for fiberglass boat manufacturing materials, manufacturing of pneumatic rubber tires, flat wood paneling coatings, letterpress printing, and automobile and light-duty truck assembly coatings sectors Houston-Galveston-Brazoria, TX 2008 8-hour ozone NAAQS nonattainment area 5/13/2020 3/23/2026, 91 FR 13739 For the HGB Serious classification.\nHouston-Galveston-Brazoria 2008 eight-hour ozone serious nonattainment NOX RACT demonstration Houston-Galveston-Brazoria, TX 2008 8-hour ozone NAAQS nonattainment area 5/13/2020 3/23/2026, 91 FR 13739\nHouston-Galveston-Brazoria 2008 eight-hour ozone serious nonattainment VOC RACT demonstration Houston, Galveston, Brazoria, TX 2008 8-hour ozone NAAQS nonattainment area 5/13/2020 3/23/2026, 91 FR 13739\nVOC RACT negative declarations for fiberglass boat manufacturing materials, surface coating for flat wood paneling, letterpress printing, shipbuilding and ship repair surface coating operations, vegetable oil manufacturing, and rubber tire manufacturing; for Wise County only: graphic arts—rotogravure and flexography, flexible package printing, refinery vacuum producing systems and process unit turnarounds, wood furniture manufacturing, and manufacture of synthesized pharmaceutical products Dallas-Fort Worth, TX, 2008 8-hour ozone NAAQS nonattainment area 3/4/2020 3/23/2026, 91 FR 13747 For the DFW Serious classification\nDallas-Fort Worth 2008 eight-hour ozone serious nonattainment NOX RACT demonstration Dallas-Fort Worth, TX, 2008 8-hour ozone NAAQS nonattainment area 5/12/2020 3/23/2026, 91 FR 13747\nDallas-Fort Worth 2008 eight-hour ozone serious nonattainment VOC RACT demonstration Dallas-Fort Worth, TX, 2008 8-hour ozone NAAQS nonattainment area 5/13/2020 3/23/2026, 91 FR 13747\n1 As revised 9/26/01.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS","Subpart SS—Texas"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"d7d7a8bede810d424ce3837916cb1b21bb2ab5ae44ed112c375d1f11d18494e5","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-52.2241","next":"us/40-cfr-52.2271"},"notice":"GroundRules: Original legal text. Not legal advice."}
