{"data":{"id":"us/40-cfr-52.50","jurisdiction":"us","citation":"40 CFR 52.50","heading":"Identification of plan.","body":"(a) Purpose and scope. This section sets forth the applicable State implementation plan for Alabama under section 110 of the Clean Air Act, 42 U.S.C. 7401, and 40 CFR part 51 to meet national ambient air quality standards.\n(b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to August 31, 2022, for Alabama was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Materials are incorporated as it exists on the date of the approval and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after August 31, 2022, for Alabama will be incorporated by reference in the next update to the SIP compilation.\n(2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1) of this section.\n(3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA Office at 61 Forsyth Street SW, Atlanta, GA 30303. To obtain the material, please call (404) 562-9022. You may also inspect the material with an EPA approval date prior to August 31, 2021, for Alabama, at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, please email fedreg.legal@nara.gov or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.\n(c) EPA-Approved Alabama Regulations.\nTable 1 to Paragraph (c)—EPA-Approved Alabama Regulations\nState citation Title/subject State effective date EPA approval date Explanation\nChapter No. 335-1-1 Organization\nSection 335-1-1-.03 Organization and Duties of the Commission 12/8/2017 7/6/2018, 83 FR 31454\nSection 335-1-1-.04 Organization of the Department 12/8/2017 7/6/2018, 83 FR 31454\nChapter No. 335-3-1 General Provisions\nSection 335-3-1-.01 Purpose 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-1-.02 Definitions 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-1-.03 Ambient Air Quality Standards 10/13/1998 3/1/1999, 64 FR 9918\nSection 335-3-1-.04 Monitoring, Records, and Reporting 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-1-.05 Sampling and Testing Methods 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-1-.06 Compliance Schedule 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-1-.07 Maintenance and Malfunctioning of Equipment; Reporting 10/15/1989 3/19/1990, 55 FR 10062\nSection 335-3-1-.08 Prohibition of Air Pollution 8/10/2000 12/8/2000, 65 FR 76938\nSection 335-3-1-.09 Variances 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-1-.10 Circumvention 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-1-.11 Severability 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-1-.12 Bubble Provision 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-1-.13 Credible Evidence 4/13/1999 11/3/1999, 64 FR 59633\nSection 335-3-1-.15 Emissions Inventory Reporting Requirements 4/3/2003 4/24/2003, 68 FR 20077\nChapter No. 335-3-2 Air Pollution Emergency\nSection 335-3-2-.01 Air Pollution Emergency 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-2-.02 Episode Criteria 8/10/2000 12/8/2000, 65 FR 76938\nSection 335-3-2-.03 Special Episode Criteria 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-2-.04 Emission Reduction Plans 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-2-.05 Two Contaminant Episode 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-2-.06 General Episodes 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-2-.07 Local Episodes 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-2-.08 Other Sources 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-2-.09 Other Authority Not Affected 6/22/1989 3/19/1990, 55 FR 10062\nChapter No. 335-3-3 Control of Open Burning and Incineration\nSection 335-3-3-.01 Open Burning 1/22/2008 9/15/2008, 73 FR 53134\nSection 335-3-3-.02 Incinerators 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-3-.03 Incineration of Wood, Peanut, and Cotton Ginning Waste 8/10/2000 12/8/2000, 65 FR 76938\nChapter No. 335-3-4 Control of Particulate Emissions\nSection 335-3-4-.01 Visible Emissions 9/30/2008 10/15/2008, 73 FR 60957\nSection 335-3-4-.02 Fugitive Dust and Fugitive Emissions 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-4-.03 Fuel Burning Equipment 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-4-.04 Process Industries—General 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-4-.05 Small Foundry Cupola 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-4-.06 Cotton Gins 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-4-.07 Kraft Pulp Mills 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-4-.08 Wood Waste Boilers 6/9/2017 10/13/2017, 82 FR 47631\nSection 335-3-4-.09 Coke Ovens 8/10/2000 12/8/2000, 65 FR 76938\nSection 335-3-4-.10 Primary Aluminum Plants 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-4-.11 Cement Plants 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-4-.12 Xylene Oxidation Process 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-4-.13 Sintering Plants 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-4-.14 Grain Elevators 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-4-.15 Secondary Lead Smelters 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-4-.17 Steel Mills Located in Etowah County 10/15/1996 6/6/1997, 62 FR 30991\nChapter No. 335-3-5 Control of Sulfur Compound Emissions\nSection 335-3-5-.01 Fuel Combustion 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-5-.02 Sulfuric Acid Plants 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-5-.03 Petroleum Production 8/10/2000 12/8/2000, 65 FR 76938\nSection 335-3-5-.04 Kraft Pulp Mills 8/10/2000 12/8/2000, 65 FR 76938\nSection 335-3-5-.05 Process Industries—General 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-5-.06 TR SO2 Trading Program—Purpose and Definitions 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-5-.07 TR SO2 Trading Program—Applicability 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-5-.08 TR SO2 Trading Program—Retired Unit Exemption 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-5-.09 TR SO2 Trading Program—Standard Requirements 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-5-.10 TR SO2 Trading Program—Computation of Time 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-5-.11 Administrative Appeal Procedures 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-5-.12 SO2 Trading Budgets and Variability Limits 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-5-.13 TR SO2 Allowance Allocations 12/7/2018 3/12/2020, 85 FR 14418\nSection 335-3-5-.14 Authorization of Designated Representative and Alternate Designated Representative 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-5-.15 Responsibilities of Designated Representative and Alternate Designated Representative 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-5-.16 Changing Designated Representative and Alternate Designated Representative; Changes in Owners and Operators; Changes in Units at the Source 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-5-.17 Certificate of Representation 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-5-.18 Objections Concerning Designated Representative and Alternate Designated Representative 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-5-.19 Delegation by Designated Representative and Alternate Designated Representative 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-5-.21 Establishment of Compliance Accounts, Assurance Accounts, and General Accounts 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-5-.22 Recordation of TR SO2 Allowance Allocations and Auction Results 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-5-.23 Submission of TR SO2 Allowance Transfers 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-5-.24 Recordation of TR SO2 Allowance Transfers 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-5-.25 Compliance with TR SO2 Emissions Limitation 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-5-.26 Compliance with TR SO2 Assurance Provisions 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-5-.27 Banking 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-5-.28 Account Error 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-5-.29 Administrator's Action on Submissions 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-5-.31 General Monitoring, Recordkeeping, and Reporting Requirements 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-5-.32 Initial Monitoring System Certification and Recertification Procedures 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-5-.33 Monitoring System Out-of-Control Periods 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-5-.34 Notifications Concerning Monitoring 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-5-.35 Recordkeeping and Reporting 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-5-.36 Petitions for Alternatives to Monitoring, Recordkeeping, or Reporting Requirements 2/12/2024 5/9/2025, 90 FR 19652\nChapter No. 335-3-6 Control of Organic Emissions\nSection 335-3-6-.01 Applicability 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.02 VOC Water Separation 4/15/1987 9/27/1993, 58 FR 50262\nSection 335-3-6-.03 Loading and Storage of VOC 4/15/1987 9/27/1993, 58 FR 50262\nSection 335-3-6-.04 Fixed-Roof Petroleum Liquid Storage Vessels 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.05 Bulk Gasoline Plants 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.06 Bulk Gasoline Terminals 8/10/2000 12/8/2000, 65 FR 76938\nSection 335-3-6-.07 Gasoline Dispensing Facilities—Stage I 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.08 Petroleum Refinery Sources 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-6-.09 Pumps and Compressors 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-6-.10 Ethylene Producing Plants 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-6-.11 Surface Coating 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.12 Solvent Metal Cleaning 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.13 Cutback Asphalt 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.14 Petition for Alternative Controls 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-6-.15 Compliance Schedules 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.16 Test Methods and Procedures 8/10/2000 12/8/2000, 65 FR 76938\nSection 335-3-6-.17 Manufacture of Pneumatic Rubber Tires 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.18 Manufacture of Synthesized Pharmaceutical Products 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.20 Leaks from Gasoline Tank Trucks and Vapor Collection Systems 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.21 Leaks from Petroleum Refinery Equipment 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.22 Graphic Arts 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.23 Petroleum Liquid Storage in External Floating Roof Tanks 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.24 Applicability 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.25 VOC Water Separation 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-6-.26 Loading and Storage of VOC 4/15/1987 9/27/1993, 58 FR 50262\nSection 335-3-6-.27 Fixed-Roof Petroleum Liquid Storage Vessels 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.28 Bulk Gasoline Plants 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.29 Gasoline Terminals 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.30 Gasoline Dispensing Facilities Stage 1 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.31 Petroleum Refinery Sources 4/15/1987 9/27/1993, 58 FR 50262\nSection 335-3-6-.32 Surface Coating 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.33 Solvent Metal Cleaning 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.34 Cutback and Emulsified Asphalt 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.35 Petition for Alternative Controls 4/15/1987 9/27/1993, 58 FR 50262\nSection 335-3-6-.36 Compliances Schedules 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.37 Test Methods and Procedures 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.38 Reserved 7/31/1991 9/27/1993, 58 FR 50262\nSection 335-3-6-.39 Manufacture of Synthesized Pharmaceutical Products 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.41 Leaks from Gasoline Tank Trucks and Vapor Collection Systems 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.42 Reserved 7/31/1991 9/27/1993, 58 FR 50262\nSection 335-3-6-.43 Graphic Arts 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.44 Petroleum Liquid Storage in External Floating Roof Tanks 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.45 Large Petroleum Dry Cleaners 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.46 Reserved 7/31/1991 9/27/1993, 58 FR 50262\nSection 335-3-6-.47 Leaks From Coke By-product Recovery Plant Equipment 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.48 Emissions From Coke By-product Recovery Plant Coke Oven Gas Bleeder 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.49 Manufacture of Laminated Countertops 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.50 Paint Manufacture 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-6-.53 List of EPA Approved and Equivalent Test Methods and Procedures for the Purpose of Determining VOC Emissions 10/15/1996 6/6/1997, 62 FR 30991\nChapter No. 335-3-7 Carbon Monoxide Emissions\nSection 335-3-7-.01 Metals Production 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-7-.02 Petroleum Processes 6/22/1989 3/19/1990, 55 FR 10062\nChapter No. 335-3-8 Control of Nitrogen Oxide Emissions\nSection 335-3-8-.01 Standards for Portland Cement Kilns 4/6/2001 7/17/2001, 66 FR 36919\nSection 335-3-8-.02 Nitric Acid Manufacturing 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-8-.03 NOX Emissions from Electric Utility Generating Units 10/24/2000 11/7/2001, 66 FR 56223\nSection 335-3-8-.04 Standards for Stationary Reciprocating Internal Combustion Engines 3/22/2005 12/28/2005, 70 FR 76694\nSection 335-3-8-.05 New Combustion Sources 1/16/2012 7/7/2021, 86 FR 35610\nSection 335-3-8-.07 TR NOX Annual Trading Program—Purpose and Definitions 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-8-.08 TR NOX Annual Trading Program—Applicability 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-8-.09 TR NOX Annual Trading Program—Retired Unit Exemption 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-8-.10 TR NOX Annual Trading Program—Standard Requirements 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-8-.11 TR NOX Annual Trading Program—Computation of Time 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.12 Administrative Appeal Procedures 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.13 NOX Annual Trading Budgets and Variability Limits 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-8-.14 TR NOX Annual Allowance Allocations 12/7/2018 3/12/2020, 85 FR 14418\nSection 335-3-8-.16 Authorization of Designated Representative and Alternate Designated Representative 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.17 Responsibilities of Designated Representative and Alternate Designated Representative 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.18 Changing Designated Representative and Alternate Designated Representative; Changes in Owners and Operators; Changes in Units at the Source 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.19 Certificate of Representation 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.20 Objections Concerning Designated Representative and Alternate Designated Representative 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-8-.21 Delegation by Designated Representative and Alternate Designated Representative 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.23 Establishment of Compliance Accounts, Assurance Accounts, and General Accounts 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-8-.24 Recordation of TR NOX Annual Allowance Allocations and Auction Results 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.25 Submission of TR NOX Annual Allowance Transfers 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.26 Recordation of TR NOX Annual Allowance Transfers 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.27 Compliance with TR NOX Annual Emissions Limitation 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.28 Compliance with TR NOX Annual Assurance Provisions 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.29 Banking 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-8-.30 Account Error 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.31 Administrator's Action on Submissions 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.33 General Monitoring, Recordkeeping, and Reporting Requirements 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-8-.34 Initial Monitoring System Certification and Recertification Procedures 11/24/2015 8/31/2016, 81 FR 59869\nSection 335-3-8-.35 Monitoring System Out-of-Control Periods 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.36 Notifications Concerning Monitoring 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.37 Recordkeeping and Reporting 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.38 Petitions for Alternatives to Monitoring, Recordkeeping, or Reporting Requirements 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.39 TR NOX Ozone Season Group 2 Trading Program—Purpose and Definitions 6/9/2017 10/6/2017, 82 FR 46674\nSection 335-3-8-.40 TR NOX Ozone Season Group 2 Trading Program—Applicability 10/5/2018 3/12/2020, 85 FR 14418\nSection 335-3-8-.41 TR NOX Ozone Season Group 2 Trading Program—Retired Unit Exemption 6/9/2017 10/6/2017, 82 FR 46674\nSection 335-3-8-.42 TR NOX Ozone Season Group 2 Trading Program—Standard Requirements 6/9/2017 10/6/2017, 82 FR 46674\nSection 335-3-8-.43 TR NOX Ozone Season Group 2 Trading Program—Computation of Time 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.44 Administrative Appeal Procedures 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.45 NOX Ozone Season Group 2 Trading Budgets and Variability Limits 6/9/2017 10/6/2017, 82 FR 46674\nSection 335-3-8-.46 TR NOX Ozone Season Group 2 Allowance Allocations 12/7/2018 3/12/2020, 85 FR 14418\nSection 335-3-8-.48 Authorization of Designated Representative and Alternate Designated Representative 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.49 Responsibilities of Designated Representative and Alternate Designated Representative 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.50 Changing Designated Representative and Alternate Designated Representative; Changes in Owners and Operators; Changes in Units at the Source 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.51 Certificate of Representation 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.52 Objections Concerning Designated Representative and Alternate Designated Representative 6/9/2017 10/6/2017, 82 FR 46674\nSection 335-3-8-.53 Delegation by Designated Representative and Alternate Designated Representative 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.55 Establishment of Compliance Accounts, Assurance Accounts, and General Accounts 6/9/2017 10/6/2017, 82 FR 46674\nSection 335-3-8-.56 Recordation of TR NOX Ozone Season Group 2 Allowance Allocations and Auction Results 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.57 Submission of TR NOX Ozone Season Group 2 Allowance Transfers 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.58 Recordation of TR NOX Ozone Season Group 2 Allowance Transfers 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.59 Compliance with TR NOX Ozone Season Group 2 Emissions Limitation 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.60 Compliance with TR NOX Ozone Season Group 2 Assurance Provisions 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.61 Banking 6/9/2017 10/6/2017, 82 FR 46674\nSection 335-3-8-.62 TR NOX Ozone Season Group 2 Trading Program—Account Error 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.63 TR NOX Ozone Season Group 2 Trading Program—Administrator's Action on Submissions 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.65 General Monitoring, Recordkeeping, and Reporting Requirements 6/9/2017 10/6/2017, 82 FR 46674\nSection 335-3-8-.66 Initial Monitoring System Certification and Recertification Procedures 6/9/2017 10/6/2017, 82 FR 46674\nSection 335-3-8-.67 Monitoring System Out-of-Control Periods 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.68 Notifications Concerning Monitoring 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.69 Recordkeeping and Reporting 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.70 Petitions for Alternatives to Monitoring, Recordkeeping, or Reporting Requirements 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.71 NOX Budget Program 2/12/2024 5/9/2025, 90 FR 19652\nSection 335-3-8-.72 NOX Budget Program Monitoring and Reporting 12/13/2021 7/11/2022, 87 FR 41061\nChapter No. 335-3-9 Control of Emissions from Motor Vehicles\nSection 335-3-9-.01 Visible Emission Restrictions for Motor Vehicles 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-9-.02 Ignition System and Engine Speed 8/10/2000 12/8/2000, 65 FR 76938\nSection 335-3-9-.03 Crankcase Ventilation Systems 8/10/2000 12/8/2000, 65 FR 76938\nSection 335-3-9-.04 Exhaust Emission Control Systems 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-9-.05 Evaporative Loss Control Systems 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-9-.06 Other Prohibited Acts 8/10/2000 12/8/2000, 65 FR 76938\nSection 335-3-9-.07 Effective Date 10/15/1996 6/6/1997, 62 FR 30991\nChapter No. 335-3-12 Continuous Monitoring Requirements for Existing Sources\nSection 335-3-12-.01 General 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-12-.02 Emission Monitoring and Reporting Requirements 2/17/1998 9/14/1998, 63 FR 49005\nSection 335-3-12-.03 Monitoring System Malfunction 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-12-.04 Alternate Monitoring and Reporting Requirements 6/22/1989 3/19/1990, 55 FR 10062\nSection 335-3-12-.05 Exemptions and Extensions 6/22/1989 3/19/1990, 55 FR 10062\nChapter No. 335-3-13 Control of Fluoride Emissions\nSection 335-3-13-.01 Definitions 2/28/1978 2/22/1982, 47 FR 7666\nSection 335-3-13-.02 Superphosphoric Acid Plants 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-13-.03 Diammonium Phosphate Plants 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-13-.04 Triple Superphosphate Plants 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-13-.05 Granular Triple Superphosphoric Storage Facilities 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-13-.06 Wet Process Phosphoric Acid Plants 10/15/1996 6/6/1997, 62 FR 30991\nChapter No. 335-3-14 Air Permits\nSection 335-3-14-.01 General Provisions 6/9/2017 12/14/2018, 83 FR 64285\nSection 335-3-14-.02 Permit Procedures 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-14-.03 Standards for Granting Permits 2/12/2024 10/2/2025, 90 FR 47612 Except for paragraph 335-3-14-.03(1)(h) which was approved on 9/26/2012 with a state effective date of 5/23/2011.\nSection 335-3-14-.04 Air Permits Authorizing Construction in Clean Air Areas [Prevention of Significant Deterioration Permitting (PSD)] 2/12/2024 10/2/2025, 90 FR 47612 Except for changes to 335-3-14-.04(2)(w)1., state effective July 11, 2006, which lists a 100 ton per year significant net emissions increase for regulated NSR pollutants not otherwise specified at 335-3-14-.04(2)(w). Except for the significant impact levels at 335-3-14-.04(10)(b). Except for the second and third sentences of paragraph 335-3-14-.04(2)(bbb)2., as well as the second and fourth sentences of paragraph 335-3-14-.04(2)(bbb)3., which include changes from the vacated federal ERP rule.\nSection 335-3-14-.05 Air Permits Authorizing Construction in or Near Nonattainment Areas 2/12/2024 10/2/2025, 90 FR 47612 Except for the portion of 335-3-14-.05(1)(k)20 stating “excluding ethanol production facilities that produce ethanol by natural fermentation”; and 335-3-14-.05(2)(c)3 (addressing fugitive emission increases and decreases). Except for 335-3-14-.05(1)(h) (the actual-to-potential test for projects that only involve existing emissions units); the last sentence at 335-3-14-.05(3)(g), stating “Interpollutant offsets shall be determined based upon the following ratios”; and the NNSR interpollutant ratios at 335-3-14-.05(3)(g)1-4.\nChapter No. 335-3-15 Synthetic Minor Operating Permits\nSection 335-3-15-.01 Definitions 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-15-.02 General Provisions 8/10/2000 12/8/2000, 65 FR 76938\nSection 335-3-15-.03 Applicability 11/23/1993 10/20/1994, 59 FR 52916\nSection 335-3-15-.04 Synthetic Minor Operating Permit Requirements 10/15/1996 6/6/1997, 62 FR 30991\nSection 335-3-15-.05 Public Participation 6/9/2017 12/14/2018, 83 FR 64285\nChapter No. 335-3-17 Conformity of Federal Actions to State Implementation Plans\nSection 335-3-17-.01 Transportation Conformity 5/28/2013 10/12/2017, 82 FR 47383\nSection 335-3-17-.02 General Conformity 5/23/2011 9/26/2012, 77 FR 59100\n(d) EPA-Approved Alabama Source-Specific Requirements.\nTable 2 to Paragraph (d)—EPA-Approved Alabama Source-Specific Requirements\nName of source Permit No. State effective date EPA approval date Explanation\nLafarge Cement Kiln AB70004_1_01 2/6/2008 7/30/2009, 74 FR 37945 Certain provisions of the permit.\nLehigh Cement Kiln 4-07-0290-03 2/6/2008 7/30/2009, 74 FR 37945 Certain provisions of the permit.\n(e) EPA Approved Alabama Non-Regulatory Provisions.\nEPA Approved Alabama Non-Regulatory Provisions\nName of nonregulatory SIP provision Applicable geographic or nonattainment area State submittal date/effective date EPA approval date Explanation\nAttainment Plan for the Alabama Portion of the Chattanooga 1997 Annual PM2.5 Nonattainment Area A portion of Jackson County, Alabama 10/07/2009 10/5/2012, 77 FR 60904\nBirmingham 1990 Baseline Emissions Inventory Birmingham Ozone Nonattainment Area 11/13/1992 6/4/1999, 64 FR 29961\nAlabama Interagency Transportation Conformity Memorandum of Agreement 1/20/2000 5/11/2000, 65 FR 30362\nAlabama Fuel Waiver Request—Appendix II of Attainment Demonstration of the 1-hour NAAQS for Ozone for the Birmingham Nonattainment Area Birmingham Ozone Nonattainment Area 12/1/2000 11/7/2001, 66 FR 56220\nAttainment Demonstration of the 1-hour NAAQS for Ozone for the Birmingham Nonattainment Area Birmingham Ozone Nonattainment Area 12/1/2000 11/7/2001, 66 FR 56224\nMaintenance Plan for the Birmingham area Jefferson County and Shelby County 1/30/2004 3/12/2004, 69 FR 11800\n8-Hour Ozone Maintenance plan for the Birmingham area Jefferson County and Shelby County 1/26/2006 5/12/2006, 71 FR 27631\nConformity SIP for Birmingham and Jackson County Jefferson County, Shelby County, Jackson County 12/12/2008 3/26/2009, 74 FR 13118\n110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards Alabama 12/10/2007 7/13/2011, 76 FR 41088 For the 1997 8-hour ozone NAAQS.\nChattanooga; Fine Particulate Matter 2002 Base Year Emissions Inventory Jackson County 7/31/2009 2/8/2012, 77 FR 6467\nRegional haze plan Statewide 7/15/2008 6/28/2012, 77 FR 38515.\n110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards Alabama 7/25/2008 10/1/2012, 77 FR 59755 With the exception of sections 110(a)(2)(D)(i) and 110(a)(2)(E)(ii).\n110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards Alabama 9/23/2009 10/1/2012, 77 FR 59755 With the exception of sections 110(a)(2)(D)(i) and 110(a)(2)(E)(ii).\n1997 Annual PM2.5 Maintenance Plan for the Birmingham Area Birmingham PM2.5 Nonattainment Area 5/2/2011 1/22/2013, 78 FR 4341\n2006 24-hour PM2.5 Maintenance Plan for the Birmingham Area Birmingham PM2.5 Nonattainment Area 6/17/2010 1/25/2013, 78 FR 5306\n110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards Alabama 7/25/2008 4/12/2013, 78 FR 21841 Addressing element 110(a)(2)(D)(i)(II) prong 3 only\n110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards Alabama 9/23/2009 4/12/2013, 78 FR 21841 Addressing element 110(a)(2)(D)(i)(II) prong 3 only\n2008 Lead Attainment Demonstration for Troy Area Troy Area 11/9/2012 1/28/2014, 79 FR 4407\n110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards Alabama 7/25/2008 5/7/2014, 79 FR 26143 Addressing prong 4 of section 110(a)(2)(D)(i) only.\n110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards Alabama 9/23/2009 5/7/2014, 79 FR 26143 Addressing prong 4 of section 110(a)(2)(D)(i) only.\n1997 Annual PM2.5 Maintenance Plan for the Alabama portion of the Chattanooga TN-GA-AL Area Portion of Jackson County in the Chattanooga TN-GA-AL Area 4/23/2013 12/22/2014, 79 FR 76235\n110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQS Alabama 11/4/2011 3/18/2015, 80 FR 14019 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone NAAQS Alabama 8/20/2012 3/18/2015, 80 FR 14019 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQS Alabama 4/23/2013 3/18/2015, 80 FR 14019 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only.\nNon-interference Demonstration for Federal Low-Reid Vapor Pressure Requirement for the Birmingham Area Jefferson and Shelby Counties 11/14/2014 4/17/2015, 80 FR 21170\n110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards 7/17/2012 4/2/2015 4/2/2015, 80 FR 17689 With the exception of PSD permitting requirements for major sources of sections 110(a)(2)(C) and (J); interstate transport requirements of section 110(a)(2)(D)(i)(I) and (II), 110(a)(2)(E)(ii), and the visibility requirements of section 110(a)(2)(J).\nCross State Air Pollution Rule—State-Determined Allowance Allocations for the 2016 control periods Alabama 3/27/2014 9/22/2015\n110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone NAAQS Alabama 8/20/2012 8/12/2015, 80 FR 48258 Addressing the visibility requirements of 110(a)(2)(J) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards Alabama 11/4/2011 10/9/2015, 80 FR 61111 With the exception of provisions pertaining to PSD permitting requirements in sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3), 110(a)(2)(J); and section 110(a)(2)(E)(ii).\n110(a)(1) and 110(a)(2) Infrastructure Requirements for the 2010 NO2 NAAQS—Update Alabama 12/9/2015 9/22/2016, 81 FR 65286 Addressing Prongs 1 and 2 of Section 110(a)(2)(D)(i)(I) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS Alabama 4/23/2013 11/21/2016, 81 FR 83142 With the exception of sections: 110(a)(2)(C) and (J) concerning PSD permitting requirements; 110(a)(2)(D)(i)(I) and (II) (prongs 1 through 4) concerning interstate transport requirements and the state boards of section 110(a)(2)(E)(ii).\n110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS Alabama 4/23/2013 1/12/2017, 82 FR 3637 With the exception of interstate transport requirements of section 110(a)(2)(D)(i)(II) (prong 4), and the state board requirements of section 110(a)(2)(E)(ii).\n110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS Alabama 12/9/2015 9/18/2017, 82 FR 43487 With the exception of section 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2 and 4) and the state board requirements of section 110(a)(2)(E)(ii).\n110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS Alabama 12/9/2015 10/12/2017, 82 FR 47393 Addressing Prong 4 of Section 110(a)(2)(D)(i)(I) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS Alabama 4/23/2013 10/12/2017, 82 FR 47393 Addressing Prong 4 of Section 110(a)(2)(D)(i)(I) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS Alabama 12/9/2015 10/12/2017, 82 FR 47393 Addressing Prong 4 of Section 110(a)(2)(D)(i)(I) only.\nRegional Haze Plan Revision Alabama 10/26/2015 10/12/2017, 82 FR 47393\n2008 Lead Maintenance Plan for the Troy Area Troy Area 1/3/2018 6/20/2018, 83 FR 28543\n110(a)(1) and (2) Infrastructure Requirements for the 1997 Annual PM2.5 NAAQS Alabama 12/8/2017 7/6/2018, 83 FR 31454 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2006 24-hour PM2.5 NAAQS Alabama 12/8/2017 7/6/2018, 83 FR 31454 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2012 24-hour PM2.5 NAAQS Alabama 12/8/2017 7/6/2018, 83 FR 31454 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQS Alabama 12/8/2017 7/6/2018, 83 FR 31454 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2008 8-hour Ozone NAAQS Alabama 12/8/2017 7/6/2018, 83 FR 31454 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQS Alabama 12/8/2017 7/6/2018, 83 FR 31454 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2010 SO2 NAAQS Alabama 12/8/2017 7/6/2018, 83 FR 31454 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS Alabama 12/9/2015 9/25/2018, 83 FR 48387 Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only.\nJune 2018 Regional Haze Progress Report Alabama 6/26/2018 3/5/2019, 84 FR 7823\n110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS Alabama 8/27/2018 2/6/2020, 85 FR 6808 With the exception of 110(a)(2)(D)(i)(I) (prongs 1 and 2).\n110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS Alabama 8/20/2018 3/10/2020, 85 FR 13755 Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only.\n1997 8-Hour Ozone Second 10-Year Limited Maintenance Plan for the Birmingham Area Jefferson County and Shelby County 9/16/2020 4/6/2022, 87 FR 19806\n2006 24-hour PM2.5 Second Maintenance Plan (Limited Maintenance Plan) for the Birmingham Area Birmingham PM2.5 Maintenance Area 2/2/2021 2/2/2024, 89 FR 7289","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS","Subpart B—Alabama"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"e12b1d0963bdacb4d29447909417873835a684982668512423e0868c50ccc1ad","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-52.49","next":"us/40-cfr-52.51"},"notice":"GroundRules: Original legal text. Not legal advice."}
