{"data":{"id":"us/40-cfr-52.579","jurisdiction":"us","citation":"40 CFR 52.579","heading":"Economic feasibility considerations.","body":"Section 88-906(h), (i), (k), (o) and (q) of the Georgia Code is disapproved, since consideration of economic feasibility could, in some cases, conflict, with the requirements of the Act that primary standards be attained as expeditiously as practicable, but in no case later than July 1975.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS","Subpart L—Georgia"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"018cc031f5f4b0684bd9d456d8106574648ab0e19d67499321f1b3163a81a5de","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-52.578","next":"us/40-cfr-52.580"},"notice":"GroundRules: Original legal text. Not legal advice."}
