{"data":{"id":"us/40-cfr-52.920","jurisdiction":"us","citation":"40 CFR 52.920","heading":"Identification of plan.","body":"(a) Purpose and scope. This section sets forth the applicable State Implementation Plan for Kentucky under section 110 of the Clean Air Act, 42 U.S.C. 7401, and 40 CFR part 51 to meet national ambient air quality standards.\n(b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to September 30, 2022, for the Commonwealth of Kentucky and September 30, 2022, for Jefferson County, Kentucky, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval and notice of any change in the material will be published in the Federal Register. Entries in paragraph (c), Tables 1 and 2, and paragraph (d) of this section with EPA approval dates after September 30, 2022, for the Commonwealth of Kentucky and September 30, 2022, for Jefferson County, Kentucky, will be incorporated by reference in the next update to the SIP compilation.\n(2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1).\n(3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA office at 61 Forsyth Street SW, Atlanta, GA 30303. To obtain the material, please call (404) 562-9022. You may also inspect the material with an EPA approval date prior to September 30, 2022, for the Commonwealth at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, visit www.archives.gov/federal-register/cfr/ibr-locations or email fr.inspection@nara.gov.\n(c) EPA-approved laws and regulations.\nTable 1 to Paragraph (c)—EPA-Approved Kentucky Laws and Regulations\nState citation Title/subject State effective date EPA approval date Explanation\nChapter 50 Division for Air Quality; General Administrative Procedures\n401 KAR 50:005 General application 6/6/1979 7/12/1982, 47 FR 30059\n401 KAR 50:010 Definitions and abbreviations of terms used in Title 401 Chapters 50, 51, 53, 55, 57, 59, 61, 63, and 65 11/8/2006 9/13/2007, 72 FR 52282\n401 KAR 50:012 General application 11/12/1997 7/24/1998, 63 FR 39739\n401 KAR 50:015 Documents incorporated by reference 4/14/1988 2/7/1990, 55 FR 4169\n401 KAR 50:020 Air quality control regions 6/6/1979 7/12/1982, 47 FR 30059\n401 KAR 50:025 Classification of counties 6/1/1983 4/2/1996, 61 FR 14489\n401 KAR 50:030 Registration of sources 6/6/1979 7/12/1982, 47 FR 30059\n401 KAR 50:040 Air quality models 6/6/1979 7/12/1982, 47 FR 30059\n401 KAR 50:042 Good engineering practice stack height 6/10/1986 9/4/1987,52 FR 33592\n401 KAR 50:045 Performance tests 7/13/2005 10/17/2007, 72 FR 58759\n401 KAR 50:047 Test procedures for capture efficiency 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 50:050 Monitoring 6/6/1979 7/12/1982, 47 FR 30059\n401 KAR 50:055 General compliance requirements 9/22/1982 12/4/1986, 51 FR 43742 Except for Section 1(1) and 1(4), which were removed from the SIP by EPA on 8/11/2022.\n401 KAR 50:060 Enforcement 6/6/1979 7/12/1982, 47 FR 30059\n401 KAR 50:065 Conformity of general federal actions 10/11/1995 7/27/1998, 63 FR 40044\n401 KAR 50:066 Conformity of transportation plans, programs, and projects (Amendment) 11/12/2008 4/21/2010, 75 FR 20780\nChapter 51 Attainment and Maintenance of the National Ambient Air Quality Standards\n401 KAR 51:001 Definitions for 401 KAR Chapter 51 12/7/2012 11/3/2014, 79 FR 65143 Except the phrase “except ethanol production facilities producing ethanol by natural fermentation under the North American Industry Classification System (NAICS) codes 325193 or 312140” in 401 KAR 51:001 Section 1(118)(a)(2)(a) and the phrase “except ethanol production facilities producing ethanol by natural fermentation under NAICS codes 325193 or 312140” in 401 KAR 51:001 Section 1(118)(c)(20).\n401 KAR 51:005 Purpose and general provisions 6/6/1979 7/12/1982, 47 FR 30059\n401 KAR 51:010 Attainment status designations 6/9/2022 6/3/2024, 89 FR 47468\n401 KAR 51:017 Prevention of significant deterioration of air quality 12/7/2012 11/3/2014, 79 FR 65143 With the exception of the SILs and SMC provisions for PM2.5, and except the phrase “except ethanol production facilities producing ethanol by natural fermentation under the North American Industry Classification System (NAICS) codes 325193 or 312140” in 401 KAR 51:017 Section 7(1)(c)20.\n401 KAR 51:052 Review of new sources in or impacting upon nonattainment areas 12/7/2012 10/8/2015, 80 FR 60805 With the exception of the SILs and SMC provisions for PM2.5, and except the phrase “except ethanol production facilities producing ethanol by natural fermentation under the North American Industry Classification System (NAICS) codes 325193 or 312140” in 401 KAR 51:052 Section 2(3)(t).\n401 KAR 51:150 NOX requirements for stationary internal combustion engines 2/3/2006 10/23/2009, 74 FR 54755\n401 KAR 51:160 NOX requirements for large utility and industrial boilers 2/3/2006 10/23/2009, 74 FR 54755\n401 KAR 51:170 NOX requirements for cement kilns 8/15/2001 4/11/2002, 67 FR 17624\n401 KAR 51:180 NOX credits for early reduction and emergency 8/15/2001 4/11/2002, 67 FR 17624\n401 KAR 51:190 Banking and trading NOX allowances 8/15/2001 4/11/2002, 67 FR 17624\n401 KAR 51:195 NOX opt-in provisions 8/15/2001 4/11/2002, 67 FR 17624\n401 KAR 51:210 CAIR NOX Annual Trading Program 2/2/2007 10/4/2007, 72 FR 56623\n401 KAR 51:220 CAIR NOX Ozone Season Trading Program 6/13/2007 10/4/2007, 72 FR 56623\n401 KAR 51:230 CAIR SO2 Trading Program 2/2/2007 10/4/2007, 72 FR 56623\n401 KAR 51:240 Cross-State Air Pollution Rule (CSAPR) NOX annual trading program 7/5/2018 2/10/2020, 85 FR 7449\n401 KAR 51:260 Cross-State Air Pollution Rule (CSAPR) SO2 group 1 trading program 7/5/2018 2/10/2020, 85 FR 7449\nChapter 52 Permits, Registrations, and Prohibitory Rules\n401 KAR 52:001 Definitions for 401 KAR Chapter 52 11/18/2006 9/13/2007, 72 FR 52282\n401 KAR 52:020 Title V permits 1/15/2001 1/28/2016, 81 FR 4896 Only adding the first sentence of Section 22 entitled “Annual Emissions Certification”, and introductory paragraph text and subsection (4) of Section 23 entitled “Certification by Responsible Official”.\n401 KAR 52:030 Federally enforceable permits for non-major sources 1/15/2001 9/6/2006, 71 FR 52460\n401 KAR 52:040 State-origin permits 1/15/2001 1/28/2016, 81 FR 4896 Only adding subsection (2) introductory text, subsection (2)(c), and subsection (3) of Section 3 entitled “General Provisions”; subsection (1) of Section 20 entitled “Annual Emissions Certification for Specified Sources”; and introductory text and subsection (4) of Section 21 entitled “Certification by Responsible Official”.\n401 KAR 52:070 Registration of designated sources 1/15/2001 1/28/2016, 81 FR 4896 Only adding subsection (2) introductory text, subsection (2)(a)(1), and first sentence of subsection (2)(a)(2) of Section 3 entitled “General Provisions”.\n401 KAR 52:090 Prohibitory rule for hot mix asphalt plants 1/15/2001 9/6/2006, 71 FR 52460\n401 KAR 52:100 Public, affected state, and U.S. EPA review 6/2/2020 10/1/2021, 86 FR 54379\nChapter 53 Ambient Air Quality\n401 KAR 53:005 General provisions 4/14/1988 2/7/1990, 55 FR 4169\n401 KAR 53:010 Ambient air quality standards 7/19/2016 9/12/2017, 82 FR 42746 Except for references to hydrogen sulfide, fluorides, and odor.\nChapter 55 Emergency Episodes\n401 KAR 55:005 Significant harm criteria 4/14/1988 2/7/1990, 55 FR 4169\n401 KAR 55:010 Episode criteria 4/14/1988 2/7/1990, 55 FR 4169\n401 KAR 55:015 Episode declaration 6/6/1979 1/25/1980, 45 FR 6092\n401 KAR 55:020 Abatement strategies 6/6/1979 1/25/1980, 45 FR 6092\nChapter 59 New Source Standards\n401 KAR 59:001 Definitions for abbreviations of terms used in the Title 401, Chapter 59 11/18/2006 9/13/2007, 72 FR 52282\n401 KAR 59:005 General provisions 12/1/1982 12/4/1986, 51 FR 43742\n401 KAR 59:010 New process operations 4/14/1988 2/7/1990, 55 FR 4169\n401 KAR 59:015 New indirect heat exchangers 1/7/1981 3/22/1983, 48 FR 11945\n401 KAR 59:020 New incinerators 6/6/1979 7/12/1982, 47 FR 30059\n401 KAR 59:046 Selected new petroleum refining processes and equipment 6/29/1979 8/7/1981, 46 FR 40188\n401 KAR 59:050 New storage vessels for petroleum liquids 2/4/1981 3/30/1983, 48 FR 13168\n401 KAR 59:080 New kraft (sulfate) pulp mills 6/6/1979 1/25/1980, 45 FR 6092\n401 KAR 59:085 New sulfite pulp mills 6/6/1979 7/12/1982, 47 FR 30059\n401 KAR 59:090 New ethylene producing plants 6/6/1979 7/12/1982, 47 FR 30059\n401 KAR 59:095 New oil-effluent water separators 6/29/1979 8/7/1981, 46 FR 40188\n401 KAR 59:101 New bulk gasoline plants 9/28/1994 6/28/1996, 61 FR 33674\n401 KAR 59:105 New process gas streams 4/7/1982 3/22/1983, 48 FR 11945\n401 KAR 59:174 Stage II controls at gasoline dispensing facilities 5/3/2016 10/14/2016, 81 FR 70966\n401 KAR 59:175 New service stations 2/8/1993 6/23/1994, 59 FR 32343\n401 KAR 59:185 New solvent metal cleaning equipment 1/4/2005 10/4/2005, 70 FR 57750\n401 KAR 59:190 New insulation of magnet wire operations 6/24/1992\n401 KAR 59:210 New fabric, vinyl and paper surface coating operations 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 59:212 New graphic arts facilities using rotogravure and flexography 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 59:214 New factory surface coating operations of flat wood paneling 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 59:225 New miscellaneous metal parts and products surface coating operation 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 59:230 New synthesized pharmaceutical product manufacturing operations 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 59:235 New pneumatic rubber tire manufacturing plants 2/4/1981 3/30/1983, 48 FR 13168\n401 KAR 59:240 New perchloroethylene dry cleaning systems 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 59:315 Specific new sources 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 59:760 Commercial Motor Vehicle and Mobile Equipment Refinishing Operations 3/11/2005 10/4/2005, 70 FR 57750\nChapter 61 Existing Source Standards\n401 KAR 61:001 Definitions for 401 KAR Chapter 61 11/18/2006 9/13/2007, 72 FR 52282\n401 KAR 61:005 General provisions 12/1/1982 5/4/1989, 54 FR 19169\n401 KAR 61:010 Existing incinerators 6/6/1979 5/4/1989, 54 FR 19169\n401 KAR 61:015 Existing indirect heat exchangers 6/1/1983 4/2/1996, 61 FR 14489\n401 KAR 61:020 Existing process operations 4/14/1988 2/7/1990, 55 FR 4169\n401 KAR 61:025 Existing kraft (sulfate) pulp mills 6/6/1979 5/26/1982, 47 FR 22955\n401 KAR 61:030 Existing sulfuric acid plants 6/6/1979 3/22/1983, 48 FR 11945\n401 KAR 61:035 Existing process gas streams 4/7/1982 3/22/1983, 48 FR 11945\n401 KAR 61:040 Existing ethylene producing plants 6/6/1979 1/25/1980, 45 FR 6092\n401 KAR 61:045 Existing oil-effluent water separators 6/29/1979 8/7/1981, 46 FR 40188\n401 KAR 61:050 Existing storage vessels for petroleum liquids 6/24/1992 6/23/1994, 59 FR 32345\n401 KAR 61:055 Existing loading facilities at bulk gasoline terminals 8/24/1982 3/30/1983, 48 FR 13168\n401 KAR 61:056 Existing bulk gasoline plants 9/28/1994 6/28/1996, 61 FR 33674\n401 KAR 61:060 Existing sources using organic solvents 6/29/1979 1/25/1980, 45 FR 6092\n401 KAR 61:065 Existing nitric acid plants 6/6/1979 7/12/1982, 47 FR 30059\n401 KAR 61:070 Existing ferroalloy production facilities 6/6/1979 5/3/1984, 49 FR 18833\n401 KAR 61:075 Steel plants and foundries using existing electric arc furnaces 12/1/1982 5/4/1989, 54 FR 19169\n401 KAR 61:080 Steel plants using existing basic oxygen process furnaces 4/1/1984 5/4/1989, 54 FR 19169\n401 KAR 61:085 Existing service stations 2/8/1993 6/23/1994, 59 FR 32343\n401 KAR 61:090 Existing automobile and light-duty truck surface coating operations 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 61:095 Existing solvent metal cleaning equipment 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 61:100 Existing insulation of magnet wire operations 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 61:105 Existing metal furniture surface coating operations 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 61:110 Existing large appliance surface coating operations 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 61:120 Existing fabric, vinyl and paper surface coating operations 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 61:122 Existing graphic arts facilities using rotogravure and flexography 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 61:124 Existing factory surface coating operations of flat wood paneling 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 61:125 Existing can surface coating operations 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 61:130 Existing coil surface coating operations 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 61:132 Existing miscellaneous metal parts and products surface coating operations 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 61:135 Selected existing petroleum refining processes and equipment 6/29/1979 1/25/1980, 45 FR 6092\n401 KAR 61:137 Leaks from existing petroleum refinery equipment 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 61:140 Existing by-product coke manufacturing plants 9/4/1986 5/4/1989, 54 FR 19169\n401 KAR 61:145 Existing petroleum refineries 1/7/1981 3/22/1983, 48 FR 11945\n401 KAR 61:150 Existing synthesized pharmaceutical product manufacturing operations 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 61:155 Existing pneumatic rubber tire manufacturing plants 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 61:160 Existing perchloroethylene dry cleaning systems 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 61:165 Existing primary aluminum reduction plants 6/4/1985 12/2/1986, 51 FR 43395\n401 KAR 61:170 Existing blast furnace casthouses 4/14/1988\n401 KAR 61:175 Leaks from existing synthetic organic chemical and polymer manufacturing equipment 6/24/1992 6/23/1994, 59 FR 32343\nChapter 63 General Standards of Performance\n401 KAR 63:001 Definitions and abbreviations of terms used in 401 KAR Chapter 63 11/18/2006 9/13/2007, 72 FR 52282\n401 KAR 63:005 Open burning 7/13/2005 10/17/2007, 72 FR 58759\n401 KAR 63:010 Fugitive emissions 6/30/2020 5/9/2022, 87 FR 27524 Except for the nuisance provision found in Section 3, Paragraph (4).\n401 KAR 63:015 Flares 6/6/1979 12/24/1980, 45 FR 84999\n401 KAR 63:025 Asphalt paving operations 6/24/1992 6/23/1994, 59 FR 32343\n401 KAR 63:031 Leaks from gasoline tank trunks 2/8/1993 6/23/1994, 59 FR 32343\nChapter 65 Mobile Source-Related Emissions\n401 KAR 65:001 Definitions and abbreviations of terms used in 401 KAR Chapter 65 11/18/2006 9/13/2007, 72 FR 52282\n401 KAR 65:005 Liquefied petroleum gas carburetion systems 6/6/1979 1/25/1980, 45 FR 6092\nKentucky Revised Statutes (KRS)\nKRS Chapter 11A.020 Public servant prohibited from certain conduct—Exception—Disclosure of personal or private interest 7/15/1998 10/3/2012, 77 FR 60307\nKRS Chapter 11A.030 Considerations in determination to abstain from action on official decision—Advisory opinion 7/14/1992 10/3/2012, 77 FR 60307\nKRS Chapter 11A.040 Acts prohibited for public servant or officer—exception 7/16/2006 10/3/2012, 77 FR 60307\nKRS Chapter 224.10-020 Department within the cabinet—Offices and divisions within the departments—Appointments 7/15/2010 10/3/2012, 77 FR 60307\nKRS Chapter 224.10-100 Powers and duties of cabinet 8/30/2007 10/3/2012, 77 FR 60307\nTable 2 to Paragraph (c)—EPA-Approved Jefferson County Regulations for Kentucky\nReg Title/subject EPA approval date Federal Register notice District effective date Explanation\nReg 1—General Provisions\n1.01 General Application of Regulations and Standards 10/23/2001 66 FR 53658 3/17/1999\n1.02 Definitions May 13, 2024 89 FR 41319 3/15/2023 Except for the definition of “Acute noncancer effect.”\n1.03 Abbreviations and Acronyms 8/31/2017 82 FR 41335 1/16/2008\n1.04 Performance Tests 7/10/2020 85 FR 41399 6/19/2019\n1.05 Compliance with Emission Standards and Maintenance Requirements 10/23/2001 66 FR 53658 11/18/1992\n1.06 Stationary Source Self-Monitoring, Emissions Inventory Development, and Reporting 1/10/2024 89 FR 1461 3/16/2022 Except Section 5 and any references to Section 5 in this regulation.\n1.07 Excess Emissions During Startups, Shutdowns, and Upset Conditions 6/10/2014 79 FR 33101 7/21/2005\n1.08 Administrative Procedures 10/21/2020 85 FR 66876 11/20/2019\n1.09 Prohibition of Air Pollution 10/23/2001 66 FR 53658 11/16/1983\n1.10 Circumvention 10/23/2001 66 FR 53658 4/19/1972\n1.11 Control of Open Burning 12/27/24 89 FR 105463 3/15/2023\n1.14 Control of Fugitive Particulate Emissions 10/23/2001 66 FR 53658 1/20/1988\n1.18 Rule Effectiveness 10/23/2001 66 FR 53686 9/21/1994\n1.19 Administrative Hearings 8/31/2017 82 FR 41335 1/16/2008\nReg 2—Permit Requirements\n2.01 General Application 10/23/2001 66 FR 53658 4/21/1982\n2.02 Air Pollution Regulation Requirements and Exemptions 10/23/2001 66 FR 53658 6/21/1995\n2.03 Permit Requirements—Non-Title V Construction and Operating Permits and Demolition/Renovation Permits 10/23/2001 66 FR 53658 12/15/1993 Except for paragraphs 1.3, 5.3 and 5.6 regarding asbestos demolition, which were removed from the federally approved SIP by EPA on 5/7/2021.\n2.04 Construction or Modification of Major Sources in or Impacting upon Non-Attainment Areas (Emission Offset Requirements) 3/7/2024 89 FR 16460 3/16/2022 Except for the ethanol production facilities exclusion in Sections 1.4.3.20 and 5.20. Additionally, EPA is retaining Sections 2.2.20 and 10 from Version 7 of Regulation 2.04, locally effective on March 17, 1993.\n2.05 Prevention of Significant Deterioration of Air Quality 9/16/2020 85 FR 57707 1/17/2018 This approval does not include Jefferson County's revisions to incorporate by reference the Fugitive Emissions Rule (December 19, 2008).\n2.06 Permit Requirements—Other Sources 10/23/2001 66 FR 53658 11/16/1983\n2.07 Public Notification for Title V, PSD, and Offset Permits; SIP Revisions; and Use of Emission Reduction Credits 10/23/2001 66 FR 53658 6/21/1995\n2.09 Causes for Permit Suspension 11/3/2003 68 FR 62236 6/19/2002\n2.10 Stack Height Considerations 10/23/2001 66 FR 53658 7/19/1989\n2.11 Air Quality Model Usage 10/23/2001 66 FR 53658 5/19/1999\n2.17 Federally Enforceable District Origin Operating Permits 3/1/2023 88 FR 12831 3/16/2022\nReg 3—Ambient Air Quality Standards\n3.01 Ambient Air Quality Standards 5/11/2018 83 FR 21907 2/15/2017\nReg 4—Emergency Episodes\n4.01 General Provisions for Emergency Episodes 10/23/2001 66 FR 53658 6/13/1979\n4.02 Episode Criteria 10/23/2001 66 FR 53658 4/20/1988\n4.03 General Abatement Requirements 10/23/2001 66 FR 53658 2/16/1983\n4.04 Particulate and Sulfur Dioxide Reduction Requirements 10/23/2001 66 FR 53658 4/19/1972\n4.05 Hydrocarbon and Nitrogen Oxides Reduction Requirements 10/23/2001 66 FR 53658 2/16/1983\n4.06 Carbon Monoxide Reduction Requirements 10/23/2001 66 FR 53658 2/16/1983\n4.07 Episode Reporting Requirements 10/23/2001 66 FR 53658 6/13/1979\nReg 6—Standards of Performance for Existing Affected Facilities\n6.01 General Provisions 10/23/2001 66 FR 53658 11/16/1983\n6.02 Emission Monitoring for Existing Sources 10/23/2001 66 FR 53658 11/16/1983\n6.07 Standards of Performance for Existing Indirect Heat Exchangers 10/1/2019 84 FR 52003 1/17/2018\n6.08 Standard of Performance for Existing Incinerators 10/23/2001 66 FR 53658 6/13/1979\n6.09 Standards of Performance for Existing Process Operations 5/21/2019 84 FR 22982 1/17/2018\n6.10 Standard of Performance for Existing Process Gas Streams 10/23/2001 66 FR 53658 11/16/1983\n6.12 Standard of Performance for Existing Asphalt Paving Operations 10/23/2001 66 FR 53658 5/15/1991\n6.13 Standard of Performance for Existing Storage Vessels for Volatile Organic Compounds 3/10/2021 86 FR 13655 6/19/2019\n6.14 Standard of Performance for Selected Existing Petroleum Refining Processes and Equipment 10/23/2001 66 FR 53658 4/21/1982\n6.15 Standard of Performance for Gasoline Transfer to Existing Service Station Storage Tanks (Stage I Vapor Recovery) 1/25/1980 45 FR 6092 6/13/1979\n6.16 Standard of Performance for Existing Large Appliance Surface Coating Operations 10/23/2001 66 FR 53658 5/15/1991\n6.17 Standard of Performance for Existing Automobile and Truck Surface Coating Operations 10/23/2001 66 FR 53658 11/18/1992\n6.18 Standards of Performance for Existing Solvent Metal Cleaning Equipment 8/31/2017 82 FR 41335 5/9/2003\n6.19 Standard of Performance for Existing Metal Furniture Surface Coating Operations 10/23/2001 66 FR 53658 5/15/1991\n6.20 Standard of Performance for Existing Bulk Gasoline Plants 10/23/2001 66 FR 53658 11/16/1983\n6.21 Standard of Performance for Existing Gasoline Loading Facilities at Bulk Terminals 3/11/2021 86 FR 13816 6/19/2019 Except for the phrase “or an alternate procedure approved by District” in subsection 3.6.4.2.\n6.22 Standard of Performance for Existing Volatile Organic Materials Loading Facilities 10/23/2001 66 FR 53658 3/17/1993\n6.24 Standard of Performance for Existing Sources Using Organic Materials 10/23/2001 66 FR 53658 3/17/1993\n6.26 Standards of Performance for Existing Volatile Organic Compound Water Separators 7/11/2019 84 FR 33004 1/17/2018\n6.27 Standards of Performance for Existing Liquid Waste Incinerators 10/23/2001 66 FR 53658 6/13/1979\n6.28 Standard of Performance for Existing Hot Air Aluminum Atomization Processes 10/23/2001 66 FR 53658 3/18/1981\n6.29 Standards of Performance for Existing Graphic Arts Facilities Using Rotogravure and Flexography 10/12/2017 82 FR 47376 8/21/2013\n6.30 Standard of Performance for Existing Factory Surface Coating Operations of Flat Wood Paneling 10/23/2001 66 FR 53658 5/15/1991\n6.31 Standards of Performance for Existing Miscellaneous Metal Parts and Products Surface Coating Operations 9/2/2020 85 FR 54510 6/19/2019\n6.32 Standard of Performance for Leaks from Existing Petroleum Refinery Equipment 10/23/2001 66 FR 53658 5/15/1991\n6.33 Standard of Performance for Existing Synthesized Pharmaceutical Product Manufacturing Operations 10/23/2001 66 FR 53658 5/15/1991\n6.34 Standard of Performance for Existing Pneumatic Rubber Tire Manufacturing Plants 10/23/2001 66 FR 53658 5/15/1991\n6.35 Standard of Performance for Existing Fabric, Vinyl and Paper Surface Coating Operations 10/23/2001 66 FR 53658 5/15/1991\n6.38 Standard of Performance for Existing Air Oxidation Processes in Synthetic Organic Chemical Manufacturing Industries 10/23/2001 66 FR 53658 12/17/1986\n6.39 Standard of Performance for Equipment Leaks of Volatile Organic Compounds in Existing Synthetic Organic Chemical and Polymer Manufacturing Plants 10/23/2001 66 FR 53658 7/17/1996\n6.40 Standards of Performance for Gasoline Transfer to Motor Vehicles (Stage II Vapor Recovery and Control System) 9/18/2017 82 FR 43489 11/10/2016\n6.42 Reasonably Available Control Technology Requirements for Major Volatile Organic Compound- and Nitrogen Oxides-Emitting Facilities 10/23/2001 66 FR 53658 3/17/1999\n6.43 Volatile Organic Compound Reduction Requirements 8/31/2017 82 FR 41335 2/15/2006\n6.44 Standards of Performance for Existing Commercial Motor Vehicle and Mobile Equipment Refinishing Operations 10/23/2001 66 FR 53658 9/20/1995\n6.45 Standards of Performance for Existing Solid Waste Landfills 10/23/2001 66 FR 53686 2/2/1994\n6.46 Standards of Performance for Existing Ferroalloy and Calcium Carbide Production Facilities 10/23/2001 66 FR 53658 12/21/1994\n6.48 Standard of Performance for Existing Bakery Oven Operations 10/23/2001 66 FR 53658 7/19/1995\n6.49 Standards of Performance for Reactor Processes and Distillation Operations Processes in the Synthetic Organic Chemical Manufacturing Industry 10/23/2001 66 FR 53664 6/20/2001\n6.50 NOX Requirements for Portland Cement Kilns 11/19/2002 67 FR 69688 3/20/2002\nReg 7—Standards of Performance for New Affected Facilities\n7.01 General Provisions 10/23/2001 66 FR 53658 5/17/2000\n7.06 Standards of Performance for New Indirect Heat Exchangers 10/23/2001 66 FR 53658 4/21/1982\n7.07 Standard of Performance for New Incinerators 10/23/2001 66 FR 53658 9/15/1993\n7.08 Standards of Performance for New Process Operations 5/21/2019 84 FR 22982 1/17/2018\n7.09 Standards of Performance for New Process Gas Streams 10/23/2001 66 FR 53658 6/18/1997\n7.11 Standard of Performance for New Asphalt Paving Operations 10/23/2001 66 FR 53658 5/15/1991\n7.12 Standard of Performance for New Storage Vessels of Volatile Organic Compounds 3/10/2021 86 FR 13655 6/19/2019\n7.14 Standard of Performance for Selected New Petroleum Refining Processes and Equipment 10/23/2001 66 FR 53658 6/13/1979\n7.15 Standards of Performance for Gasoline Transfer to New Service Station Storage Tanks (Stage I Vapor Recovery) 10/23/2001 66 FR 53658 4/20/1988\n7.20 Standard of Performance for New Gasoline Loading Facilities at Bulk Plants 3/11/2021 86 FR 13816 6/19/2019 Except for the phrase “or an alternate procedure approved by the District” in subsection 3.11.1.2.\n7.22 Standard of Performance for New Volatile Organic Materials Loading Facilities 10/23/2001 66 FR 53658 3/17/1993\n7.25 Standard of Performance for New Sources Using Volatile Organic Compounds 10/23/2001 66 FR 53658 3/17/1993\n7.34 Standard of Performance for New Sulfite Pulp Mills 10/23/2001 66 FR 53658 6/13/1979\n7.35 Standard of Performance for New Ethylene Producing Plants 10/23/2001 66 FR 53658 6/13/1979\n7.36 Standards of Performance for New Volatile Organic Compound Water Separators 7/11/2019 84 FR 33004 1/17/2018\n7.51 Standard of Performance for New Liquid Waste Incinerators 10/23/2001 66 FR 53658 1/20/1988\n7.52 Standard of Performance for New Fabric, Vinyl, and Paper Surface Coating Operations 10/23/2001 66 FR 53658 5/15/1991\n7.55 Standard of Performance for New Insulation of Magnet Wire 10/23/2001 66 FR 53658 3/17/1993\n7.56 Standard of Performance for Leaks from New Petroleum Refinery Equipment 10/23/2001 66 FR 53658 5/15/1991\n7.58 Standard of Performance for New Factory Surface Coating Operations of Flat Wood Paneling 10/23/2001 66 FR 53658 5/15/1991\n7.59 Standards of Performance for New Miscellaneous Metal Parts and Products Surface Coating Operations 9/2/2020 85 FR 54510 6/19/2019\n7.60 Standard of Performance for New Synthesized Pharmaceutical Product Manufacturing Operations 10/23/2001 66 FR 53658 5/15/1991\n7.77 Standards of Performance for New Blast Furnace Casthouses 10/23/2001 66 FR 53658 10/20/1993\n7.79 Standards of Performance for New Commercial Motor Vehicles and Mobile Equipment Refinishing Operations 10/23/2001 66 FR 53686 2/2/1994\n7.81 Standard of Performance for New or Modified Bakery Oven Operations 10/23/2001 66 FR 53658 5/17/2000\n(d) EPA-approved source-specific requirements.\nTable 3 to Paragraph (d)—EPA-Approved Kentucky Source-Specific Requirements\nName of source Permit No. State effective date EPA approval date Explanations\nBubble action at Kentucky Utilities Green River Plant N/A 12/1/1980 6/15/1981, 46 FR 31260\nBubble action at Corning Glassworks N/A 5/18/1981 10/29/1981, 46 FR 53408\nBubble action at National Distillers Company's, Old Crow Plant N/A 12/24/1980 9/14/1981, 46 FR 45610\nBubble action at Borden Chemical CO in Jefferson CO N/A 3/5/1982 5/11/1982, 47 FR 20125\nVariance for seven perchloroethylene dry cleaners N/A 7/30/1982 5/2/1983, 48 FR 19716\nVariance for two dry cleaners N/A 1/12/1983 5/5/1983, 48 FR 20233\nVariance for Jiffy and Hiland Dry Cleaners N/A 3/30/1984 4/18/1985, 50 FR 15421\nOpacity variance for boiler Units 1 and 2 of TVA's Paradise Steam Plant KDEPDAQ Permit 0-86-75 7/24/1986 8/17/1988, 53 FR 30998\nOperating Permit requiring VOC RACT for Calgon CO KDEPDAQ Permit 0-94-020 11/17/1994 5/24/1995, 60 FR 27411\nAlternative Averaging Period for American Greetings Corporation KDEPDAQ Permit V-98-049 7/7/1999 5/9/2001, 66 FR 23615\nTitle V permit requiring VOC RACT for Publisher's Printing, Inc., Bullitt County KDEPDAQ Permit 21-029-00019 7/20/2001 10/23/2001, 66 FR 53662\nBoard Order E.I. du Pont de Nemours \u0026 Company NOX RACT Plan 02/21/01 3/1/2001 10/23/2001, 66 FR 53665\nBoard Order Ford Louisville Assembly Plant NOX RACT Plan 11/08/99 1/1/2000 10/23/2001, 66 FR 53665\nBoard Order General Electric Company NOX RACT Plan 01/17/01 3/1/2001 10/23/2001, 66 FR 53665\nBoard Order Kosmos Cement Company NOX RACT Plan 05/03/04 5/3/2004 5/18/2005, 70 FR 28429\nBoard Order Louisville Gas and Electric Company, Cane Run Generating Station NOX RACT Plan 10/18/00 1/1/2001 10/23/2001, 66 FR 53665\nBoard Order Louisville Gas and Electric Company, Mill Creek Generating Station NOX RACT Plan 10/18/00 1/1/2001 10/23/2001, 66 FR 53665\nBoard Order Louisville Medical Center Steam Plant NOX RACT Plan 1/18/2017 1/18/2017 10/12/2017, 82 FR 47376\nBoard Order Oxy Vinyls, LP NOX RACT Plan 12/20/00 1/1/2001 10/23/2001, 66 FR 53665\nBoard Order Rohm and Haas Company NOX RACT Plan 12/20/00 1/1/2001 10/23/2001, 66 FR 53665\nBoard Order Texas Gas Transmission NOX RACT Plan 5/18/2016 5/18/2016 10/12/2017, 82 FR 47376\nLawson Mardon Packaging, USA, Inc N/A 8/11/2003 7/10/2003, 68 FR 41083\nCalgon Carbon Corporation V-00-015 5/13/2005 5/24/2006, 71 FR 29786 The only parts of the permit being approved and incorporated are the SO2 emission limits from the following emissions points: 12, 14, 21, 31, 32, 34, 39, 40, 42, and 64.\nTVA Paradise Permit KDEPDAQ Permit 0-87-012 10/19/2007 4/29/2008, 73 FR 23105 Emission Rates Units 1 and 2 are 1.2 lb/MMBTU and Unit 3 is 1.2 lb/MMBTU or * 3.1 lb/MMBTU.\nSource-Specific SIP Revision for Avis Budget Car Rental Group N/A 8/9/2007 11/30/2009, 74 FR 62499 Removal of stage II requirements.\nLG \u0026 E Cane Run Generating Station NOX RACT Plan Amendment 2 N/A 7/18/2012 8/30/2016, 81 FR 59488\nLouisville Gas and Electric Mill Creek Electric Generating Station 145-97-TV(R3) 6/23/2017 6/28/2019, 84 FR 30920 Plant-wide Specific condition S1-Standards, S2-Monitoring and Record Keeping and S3-Reporting in title V permit 145-97-TV(R3) for EGU U1, U2, U3 and U4.\nBoard Order for the American Synthetic Rubber Company—Amendment 2 N/A 11/17/2021 6/7/2022, 87 FR 34577 Including the attached VOC/NOX RACT Plan.\nBoard Order for LL Flex, LLC N/A 11/18/2020 9/30/2022, 87 FR 59309\n* Bypass of the scrubber shall be limited to 720 operating hours in any 12 consecutive months.\n(e) EPA-approved non-regulatory provisions.\nEPA—Approved Kentucky Non-regulatory Provisions\nName of non-regulatory SIP provision Applicable geographic or nonattainment area State submittal date/effective date EPA approval date Explanations\nAir Quality surveillance plan Commonwealth of Kentucky 11/15/79 11/16/81, 46 FR 56198.\nProtection Visibility in Class I Areas Mammoth Cave National Park (Class I area) 08/31/97 07/12/88, 53 FR 26253.\nSmall Business Assistance Program Commonwealth of Kentucky 07/15/93 06/19/95, 60 FR 31915.\nLexington Maintenance Plan Fayette County, Scott County 08/24/04 09/16/04, 69 FR 55751.\nAshland-Huntington Maintenance Plan Boyd County, Greenup County 05/24/95 06/29/95, 60 FR 33752.\nMaintenance Plan for Owensboro \u0026 Edmonson County Area Daviess County, Hancock County, Edmonson County 04/14/98 09/03/98, 63 FR 46898.\nNorthern Kentucky 15% Plan \u0026 I/M Boone, Campbell and Kenton Counties 09/11/98 12/08/98, 63 FR 67591.\nNegative Declarations for the nonattainment portions of Bullitt and Oldham Counties in Louisville 1-hour moderate ozone nonattainment area for CTG rules for aerospace, SOCMI, shipbuilding, and wood furniture manufacturing Jefferson County, Bullitt County, Oldham County 12/14/99 10/23/01, 66 FR 53665.\nNegative Declarations submitted by the Air Pollution Control District of Jefferson County for the Louisville 1-hour moderate ozone nonattainment area for CTG rules for aerospace, shipbuilding, and wood furniture manufacturing Jefferson County, Bullitt County, Oldham County 02/26/01 10/23/01, 66 FR 53665.\nLouisville 1-Hour Ozone Maintenance Plan Jefferson County and portions of Bullitt and Oldham Counties 11/1/03 05/18/05, 70 FR 28429.\nMaintenance Plan for Paducah Area Marshall County and a portion of Livingston County 06/14/01 08/20/01, 66 FR 43488.\nNorthern Kentucky 1-Hour Ozone Maintenance Plan Boone, Campbell, and Kenton Counties 02/09/05 10/04/05, 70 FR 57750\n8-Hour Ozone Maintenance Plan for the Christian County, Kentucky area Christian County 05/20/05 01/25/06, 71 FR 4047\nKentucky portion of the Ashland-Huntington Sulfur Dioxide Maintenance Plan Boyd County 05/13/05 05/24/06, 71 FR 29786\nLouisville 8-hour Ozone Maintenance Plan Bullitt County, Jefferson County, Oldham County 09/26/2006 07/05/07, 72 FR 36601\nHuntington-Ashland 8-hour Ozone Maintenance Plan Boyd County 09/29/06 08/03/07, 71 FR 43172\nNorthern Kentucky 8-Hour Ozone Maintenance plan Boone, Campbell and Kenton Counties in Kentucky 1/29/2010 8/5/2010, 75 FR 47218 For the 1997 8-hour ozone NAAQS.\nPaducah 8-Hour Ozone Attainment/1-Hour Ozone Maintenance Plan Section 110(a)(1) Marshall and Livingston Counties May 27, 2008 8/26/2010, 75 FR 52467\nHuntington—Ashland 8-Hour Ozone Section 110(a)(1) Maintenance Plan A portion of Greenup County May 27, 2008 4/14/11, 76 FR 20853 For the 1997 8-hour ozone NAAQS.\nLexington 8-Hour Ozone Section 110(a)(1) Maintenance Plan Section 110(a)(1) Fayette and Scott Counties May 27, 2008 4/14/11, 76 FR 20853 For the 1997 8-hour ozone NAAQS.\nEdmonson County 8-Hour Ozone Section 110(a)(1) Maintenance Plan Edmonson County May 27, 2008 4/14/11, 76 FR 20853 For the 1997 8-hour ozone NAAQS.\nOwensboro 8-Hour Ozone Section 110(a)(1) Maintenance Plan Daviess County and a portion of Hancock County May 27, 2008 4/14/11, 76 FR 20853 For the 1997 8-hour ozone NAAQS.\n110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards Commonwealth of Kentucky 12/13/2007 7/13/2011, 76 FR 41088 For the 1997 8-hour ozone NAAQS.\n1997 Annual PM2.5 Maintenance Plan for the Northern Kentucky Area Boone, Campbell and Kenton Counties (Kentucky portion of the Cincinnati-Hamilton OH-KY-IN Area) 1/27/11 12/15/2011, 76 FR 77903 For the 1997 Annual PM2.5 NAAQS.\nHuntington-Ashland 1997 PM2.5 Attainment Plan Boyd County; Portion of Lawrence County 12/03/2008 4/11/2012, 77 FR 21663 For the 1997 PM2.5 NAAQS.\nRegional Haze Plan and Plan Amendment Statewide 06/25/08 and 05/28/10 03/30/12, 77 FR 19098 Source-specific BART requirements are summarized in Table 7.5.3-2 of the Commonwealth's May 28, 2010 submittal.\nLouisville; 1997 Annual Fine Particulate Matter 2002 Base Year Emissions Inventory Bullitt and Jefferson Counties 12/03/2008 8/2/12, 77 FR 45956.\n110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards Kentucky 8/26/2008 10/3/2012, 77 FR 60307 With the exception of section 110(a)(2)(D)(i), With respect to sections 110(a)(2)(C) related to PSD requirements and 110(a)(2)(J) related to PSD requirements, EPA conditionally approved these requirements.\n110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards Kentucky 7/17/2012 10/3/2012, 77 FR 60307 With the exception of section 110(a)(2)(D)(i), With respect to sections 110(a)(2)(C) related to PSD requirements and 110(a)(2)(J) related to PSD requirements, EPA conditionally approved these requirements.\n1997 Annual PM2.5 Maintenance Plan for the Kentucky portion of the Huntington-Ashland Area Boyd County and Lawrence County (part) (Kentucky portion of the Huntington-Ashland WV-KY-OH Area) 2/9/12 12/26/12, 77 FR 75865 For the 1997 Annual PM2.5 NAAQS.\n110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards Commonwealth of Kentucky 7/17/2012 3/7/2013 78 FR 14681 With the exception of section 110(a)(2)(D)(i)(I) concerning interstate transport which is being disapproved and, the portions of sections 110(a)(2)(C), prong 3 of 110(a)(2)(D)(i), and 110(a)(2)(J) related to structural PSD requirements, which are being conditionally approved.\nMVEB Update for the 1997 8-hour Ozone Maintenance Plan for Northern Kentucky Boone, Campbell, and Kenton Counties, KY 8/9/12 6/5/13, 78 FR 33726\n110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards Kentucky 8/26/2008 5/7/2014, 79 FR 26143 Addressing prong 4 of section 110(a)(2)(D)(i) only.\n110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards Kentucky 7/17/2012 5/7/2014, 79 FR 26143 Addressing prong 4 of section 110(a)(2)(D)(i) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQS Kentucky 7/17/2012 3/18/2015, 80 FR 14019 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only\n110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQS Kentucky 4/26/2013 3/18/2015, 80 FR 14019 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards Commonwealth of Kentucky July 17, 2012 10/9/2015, 80 FR 61107 With the exception of provisions pertaining to PSD permitting requirements in sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS Kentucky 4/26/2013 11/21/2016, 81 FR 83152 With the exception of the regulation of new minor sources and minor modifications under section 110(a)(2)(C), section 110(a)(2)(D)(i)(I) and (II) (prongs 1-4) and the PSD requirements of section 110(a)(2)(J).\n110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS Kentucky 04/26/2013 12/6/2016 With the exception of the minor source program requirements of section 110(a)(2)(C) and the interstate transport requirements of section 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2, and 4).\n2010 1-hour SO2 Maintenance Plan for the Kentucky Portion of the Campbell-Clermont, KY-OH Area Campbell County portion of Campbell-Clermont, KY-OH Nonattainment Area 2/22/2016 3/10/2017 This includes the 172(c)(1) RACM determination and the 172(c)(3) base-year emissions inventory.\nRACM for the Kentucky portion of Louisville, KY-IN Area for the 1997 Annual PM2.5 NAAQS Bullitt and Jefferson Counties 08/09/2016 12/27/2016, 82 FR 95041\n1997 Annual PM2.5 Maintenance Plan for the Kentucky portion of the bi-state Louisville Area Bullitt and Jefferson Counties 3/5/2012 4/7/2017, 82 FR 16943\n2008 8-hour ozone NAAQS Nonattainment New Source Review Requirements for the Kentucky Portion of the Cincinnati-Hamilton OH-KY-IN Area Boone, Campbell and Kenton Counties (part) (Kentucky portion of the Cincinnati-Hamilton, OH-KY-IN Area) 8/26/2016 4/10/2017, 82 FR 17131\n2008 8-hour ozone Maintenance Plan for the Kentucky portion of the Cincinnati-Hamilton, OH-KY-IN Area Portions of Boone (2000 Census tracts: 702, 703.05, 703.06, 703.07, 703.08, 703.09, 704.01, 704.02, 705.01, 705.02, 706.01, 706.03, 706.04), Campbell (2000 Census tracts: 501, 502, 503, 504, 505, 506, 512, 513, 519.01, 519.03, 519.04, 520.01, 520.02, 521, 522, 523.01, 523.02, 524, 525, 526, 528, 529, 530, 531), and Kenton (2000 Census tracts: 603, 607, 609, 610, 611, 612, 613, 614, 616, 636.03, 636.04, 636.05, 636.06, 638, 640, 641, 642, 643, 644, 645, 646, 647, 648, 649, 650, 651, 652, 653, 654, 655.01, 655.02, 656, 657, 658, 659, 668, 669, 670, 671) Counties, KY 8/26/2016 7/5/2017, 82 FR 30976\n2008 8-hour ozone base year emissions inventory for the Kentucky portion of the Cincinnati-Hamilton, OH-KY-IN Area Portions of Boone, Campbell and Kenton Counties in Kentucky 8/26/2016 7/5/2017, 82 FR 30976 182(a)(1) base-year emissions inventory\n110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual Fine PM2.5 NAAQS Kentucky 2/8/2016 8/8/2017, 82 FR 37012 With the exception of section 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2 and 4) and the minor source program requirement of section 110(a)(2)(C).\nSeptember 2014 Regional Haze Progress Report Kentucky 9/17/2014 10/12/2017, 82 FR 47378\nRemoval of Reliance on Reformulated Gasoline in the Kentucky portion of the Cincinnati-Hamilton, OH-KY-IN Area Boone, Campbell and Kenton Counties (Kentucky portion of the Cincinnati-Hamilton Area) 9/13/2017 4/2/2018, 83 FR 13872\n110(a)(2)(D)(i)(I) Infrastructure Requirement for the 2008 8-Hour Ozone National Ambient Air Quality Standards Commonwealth of Kentucky 5/10/2018 7/17/2018, 83 FR 33730\n110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS Kentucky 2/8/2016 9/25/2018, 83 FR 48387 Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQS Kentucky 4/26/2013 3/28/2019, 84 FR 11652 Only addresses the minor source program requirements of section 110(a)(2)(C).\n110(a)(1) and (2) Infrastructure Requirements for the 2010 SO2 NAAQS Kentucky 4/26/2013 3/28/2019, 84 FR 11652 Only addresses the minor source program requirements of section 110(a)(2)(C).\n110(a)(1) and (2) Infrastructure Requirements for the 2012 PM2.5 NAAQS Kentucky 2/8/2016 3/28/2019, 84 FR 11652 Only addresses the minor source program requirements of section 110(a)(2)(C).\n110(a)(1) and (2) Infrastructure Requirements for the 1997 8-hour Ozone NAAQS Kentucky 12/13/2007 4/8/2019, 84 FR 13800 Addressing prong 4 of section 110(a)(2)(D)(i)(II) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS Kentucky 4/26/2013 4/8/2019, 84 FR 13800 Addressing prong 4 of section 110(a)(2)(D)(i)(II) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS Kentucky 4/26/2013 4/8/2019, 84 FR 13800 Addressing prong 4 of section 110(a)(2)(D)(i)(II) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS Kentucky 2/8/2016 4/8/2019, 84 FR 13800 Addressing prong 4 of section 110(a)(2)(D)(i)(II) only.\nRegional Haze Plan Revision Kentucky 11/16/2018 4/8/2019, 84 FR 13800\n2010 1-hour SO2 Attainment Demonstration for the Jefferson County Area Jefferson County 6/23/2017 6/28/2019, 84 FR 30920\n2010 1-hour SO2 Jefferson County Nonattainment Plan for 172(c)(3) 2011 Base-Year Emissions Inventory Jefferson County 6/23/2017 6/28/2019, 84 FR 30920\n2010 1-hour SO2 Jefferson County Nonattainment Plan for 172(c)(5) New Source Review Requirements Jefferson County 6/23/2017 6/28/2019, 84 FR 30920\n110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS Kentucky 11/16/2018 7/31/2019, 84 FR 37101 Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS Kentucky 1/9/2019 6/1/2020, 85 FR 33021 With the exception of 110(a)(2)(D)(i)(I) (prongs 1 and 2), PSD provisions related to major sources under sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3), and 110(a)(2)(J), and air quality modeling under section 110(a)(2)(K).\n2010 1-hour SO2 Maintenance Plan for the Jefferson County Area Jefferson County 12/9/2019 8/6/2020, 85 FR 47670\n110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS Kentucky 1/11/2019 9/2/2020, 85 FR 54507 Addressing PSD provisions related to major sources under sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3), and 110(a)(2)(J), and air quality modeling under section 110(a)(2)(K).\n2015 8-hour Ozone NAAQS Nonattainment New Source Review Requirements Bullitt and Oldham Counties in the Louisville, KY-IN Marginal nonattainment area and portions of Boone, Campbell, and Kenton Counties in the Cincinnati, OH-KY Marginal nonattainment area 10/15/2020 4/5/2022, 87 FR 19649\nEmissions Statement Requirements for the 2015 8-hour Ozone NAAQS Boone, Campbell, and Kenton Counties (partial) in Kentucky portion of Cincinnati, OH-KY Area, and Bullitt and Oldham Counties (entire) in Kentucky portion of Louisville, KY-IN Area 10/15/2020 4/26/2022, 87 FR 24429.\n1997 8-Hour Ozone Second 10-Year Limited Maintenance Plan for the Kentucky portion of the Huntington-Ashland, WV-KY Maintenance Area Boyd County 3/29/2021 9/30/2022, 87 FR 59311\n1997 8-Hour Ozone Second 10-Year Limited Maintenance Plan for the Kentucky portion of the Clarksville-Hopkinsville, TN-KY Maintenance Area Christian County 3/29/2021 9/30/2022, 87 FR 59311\nEmissions Inventory for the 2015 8-hour Ozone NAAQS for Northern Kentucky Boone, Campbell, and Kenton Counties (partial) in Kentucky portion of Cincinnati, OH-KY Area 10/15/2021 9/30/2022, 87 FR 59320\nEmissions Inventory for the 2015 8-hour Ozone NAAQS for Louisville Jefferson County in its entirety, and Bullitt and Oldham Counties (partial) in Kentucky portion of Louisville, KY-IN Area 10/15/2021 9/30/2022, 87 FR 59320\n2015 8-hour Ozone Maintenance Plan for the Kentucky Portion of the Cincinnati, OH-KY Area Portions of Boone, Campbell, and Kenton Counties 9/21/2022 10/4/2023, 88 FR 68471\n2010 1-hour SO2 NAAQS Nonattainment New Source Review Requirements Portions of Henderson and Webster Counties in Kentucky 1/26/2024 1/8/2026, 90 FR 609\nEmissions Inventory for the 2010 1-hour SO2 NAAQS Portions of Henderson and Webster Counties in Kentucky 2/15/2024 1/8/2026, 90 FR 609","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS","Subpart S—Kentucky"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"88b08d944f5b68377a536d2aef61c43f3924b9ecb34216d9a5484fa63fd77256","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-52.919","next":"us/40-cfr-52.921"},"notice":"GroundRules: Original legal text. Not legal advice."}
