{"data":{"id":"us/40-cfr-60.2005","jurisdiction":"us","citation":"40 CFR 60.2005","heading":"When did this subpart become effective?","body":"This subpart became effective on August 7, 2013. Some of the requirements in this subpart apply to planning the CISWI or ACI (i.e., the preconstruction requirements in §§ 60.2045 and 60.2050). Other requirements such as the emission limitations and operating limits apply after the CISWI or ACI begins operation.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 60—STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES","Subpart CCCC—Standards of Performance for Commercial and Industrial Solid Waste Incineration Units"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"d67f5cbcb20a6b8af4fdf064ceda341ca8eb1710f402ea2ae6a2687971ac7b07","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-60.2000","next":"us/40-cfr-60.2010"},"notice":"GroundRules: Original legal text. Not legal advice."}
