{"data":{"id":"us/40-cfr-60.2040","jurisdiction":"us","citation":"40 CFR 60.2040","heading":"Do all eleven components of these new source performance standards apply at the same time?","body":"No. You must meet the preconstruction siting analysis and waste management plan requirements before you commence construction of the CISWI. The operator training and qualification, emission limitations, operating limits, performance testing and compliance, monitoring, and most recordkeeping and reporting requirements are met after the CISWI begins operation.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 60—STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES","Subpart CCCC—Standards of Performance for Commercial and Industrial Solid Waste Incineration Units"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"79bd99b61e9bd7c1411e8d9d03d57b9c009fad8d7e72706219a0b9855605e6db","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-60.2035","next":"us/40-cfr-60.2041"},"notice":"GroundRules: Original legal text. Not legal advice."}
