{"data":{"id":"us/40-cfr-60.2045","jurisdiction":"us","citation":"40 CFR 60.2045","heading":"Who must prepare a siting analysis?","body":"(a) You must prepare a siting analysis if you plan to commence construction of an incinerator after December 1, 2000.\n(b) You must prepare a siting analysis for CISWIs that commenced construction after June 4, 2010, or that commenced reconstruction or modification after August 7, 2013.\n(c) You must prepare a siting analysis if you are required to submit an initial application for a construction permit under 40 CFR part 51, subpart I, or 40 CFR part 52, as applicable, for the reconstruction or modification of your CISWI.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 60—STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES","Subpart CCCC—Standards of Performance for Commercial and Industrial Solid Waste Incineration Units"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"a4b1881ad25e0e76cc2988b3957b6df9e0d368eab87e57ddd00ddd483dcfcabd","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-60.2041","next":"us/40-cfr-60.2050"},"notice":"GroundRules: Original legal text. Not legal advice."}
