{"data":{"id":"us/40-cfr-60.2600","jurisdiction":"us","citation":"40 CFR 60.2600","heading":"How do I comply with the increment of progress for submittal of a control plan?","body":"For your control plan increment of progress, you must satisfy the two requirements specified in paragraphs (a) and (b) of this section:\n(a) Submit the final control plan that includes the five items described in paragraphs (a)(1) through (5) of this section:\n(1) A description of the devices for air pollution control and process changes that you will use to comply with the emission limitations and other requirements of this subpart;\n(2) The type(s) of waste to be burned;\n(3) The maximum design waste burning capacity;\n(4) The anticipated maximum charge rate; and\n(5) If applicable, the petition for site-specific operating limits under § 60.2680.\n(b) Maintain an onsite copy of the final control plan.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 60—STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES","Subpart DDDD—Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"767d6c900310fb49493e971126b4d97e86cbd265b45ccd16aa8986f186fcad9b","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-60.2595","next":"us/40-cfr-60.2605"},"notice":"GroundRules: Original legal text. Not legal advice."}
