{"data":{"id":"us/40-cfr-60.2890","jurisdiction":"us","citation":"40 CFR 60.2890","heading":"How are these new source performance standards structured?","body":"These new source performance standards contain 11 major components, as follows:\n(a) Preconstruction siting analysis.\n(b) Waste management plan.\n(c) Operator training and qualification.\n(d) Emission limitations and operating limits.\n(e) Performance testing.\n(f) Initial compliance requirements.\n(g) Continuous compliance requirements.\n(h) Monitoring.\n(i) Recordkeeping and reporting.\n(j) Definitions.\n(k) Tables.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 60—STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES","Subpart EEEE—Standards of Performance for Other Solid Waste Incineration Units"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"f4966f392c27fb66c5da23c9d586a497225cfb9e6b765b35e4ad0df1bd3f5e69","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-60.2889","next":"us/40-cfr-60.2891"},"notice":"GroundRules: Original legal text. Not legal advice."}
