{"data":{"id":"us/40-cfr-60.4795","jurisdiction":"us","citation":"40 CFR 60.4795","heading":"Do all nine components of these new source performance standards apply at the same time?","body":"No. You must meet the preconstruction siting analysis requirements before you commence construction of the SSI unit. The operator training and qualification, emission limits, emission standards, operating limits, performance testing, and compliance, monitoring, and most recordkeeping and reporting requirements are met after the SSI unit begins operation.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 60—STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES","Subpart LLLL—Standards of Performance for New Sewage Sludge Incineration Units"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"b6104174976bf68b6522de4424714f94398c8410d39772254a816ae115307494","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-60.4790","next":"us/40-cfr-60.4800"},"notice":"GroundRules: Original legal text. Not legal advice."}
