{"data":{"id":"us/40-cfr-60.5115","jurisdiction":"us","citation":"40 CFR 60.5115","heading":"How do I comply with the increment of progress for achieving final compliance?","body":"For the final compliance increment of progress, you must complete all process changes and retrofit construction of control devices, as specified in the final control plan, so that, if the affected SSI unit is brought online, all necessary process changes and air pollution control devices would operate as designed.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 60—STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES","Subpart MMMM—Emission Guidelines and Compliance Times for Existing Sewage Sludge Incineration Units"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"a0de92d2c51c869e87c39ef9fe535e50c6096e003511745726e59781fc44809a","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-60.5110","next":"us/40-cfr-60.5120"},"notice":"GroundRules: Original legal text. Not legal advice."}
