{"data":{"id":"us/40-cfr-60.5720b","jurisdiction":"us","citation":"40 CFR 60.5720b","heading":"b What if I do not submit a State plan or my State plan is not approvable?","body":"(a) If you do not submit an approvable State plan the EPA will develop a Federal plan for your State according to § 60.27a. The Federal plan will implement the emission guidelines contained in this subpart. Owners and operators of affected EGUs not covered by an approved State plan must comply with a Federal plan implemented by the EPA for the State.\n(b) After a Federal plan has been implemented in your State, it will be withdrawn when your State submits, and the EPA approves, a State plan replacing the relevant portion(s) of the Federal plan.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 60—STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES","Subpart UUUUb—Emission Guidelines for Greenhouse Gas Emissions for Electric Utility Generating Units"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"b19ae1b3dc6b9fb40b729d0d6c7bed45a400d5e218a4ffcf899a150213a7803d","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-60.5715b","next":"us/40-cfr-60.5725b"},"notice":"GroundRules: Original legal text. Not legal advice."}
