{"data":{"id":"us/40-cfr-61.09","jurisdiction":"us","citation":"40 CFR 61.09","heading":"Notification of startup.","body":"(a) The owner or operator of each stationary source which has an initial startup after the effective date of a standard shall furnish the Administrator with written notification as follows:\n(1) A notification of the anticipated date of initial startup of the source not more than 60 days nor less than 30 days before that date.\n(2) A notification of the actual date of initial startup of the source within 15 days after that date.\n(b) If any State or local agency requires a notice which contains all the information required in the notification in paragraph (a) of this section, sending the Administrator a copy of that notification will satisfy paragraph (a) of this section.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 61—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS","Subpart A—General Provisions"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"f5225dc412a0262f38ee185dee59062c0b1323f6c9fb6508b016fabce26446f4","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-61.08","next":"us/40-cfr-61.10"},"notice":"GroundRules: Original legal text. Not legal advice."}
