{"data":{"id":"us/40-cfr-61.350","jurisdiction":"us","citation":"40 CFR 61.350","heading":"Standards: Delay of repair.","body":"(a) Delay of repair of facilities or units that are subject to the provisions of this subpart will be allowed if the repair is technically impossible without a complete or partial facility or unit shutdown.\n(b) Repair of such equipment shall occur before the end of the next facility or unit shutdown.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 61—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS","Subpart FF—National Emission Standard for Benzene Waste Operations"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"8658ba4998c35d7cc9ec0c44dd70714145339b9afe1aa52d0389388af395fc63","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-61.349","next":"us/40-cfr-61.351"},"notice":"GroundRules: Original legal text. Not legal advice."}
