{"data":{"id":"us/40-cfr-62.14650a","jurisdiction":"us","citation":"40 CFR 62.14650a","heading":"a By what date must I conduct the annual air pollution control device inspection?","body":"On an annual basis (no more than 12 months following the previous annual air pollution control device inspection), you must complete the air pollution control device inspection as described in § 62.14635a.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 62—APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS","Subpart IIIa—Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before June 4, 2010, and Have Not Been Modified or Reconstructed Since August 7, 2013"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"e6ce64c3432606734ef2bec5e881e60576e71b9f7440c0515e76c1e7b3f97505","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-62.14645a","next":"us/40-cfr-62.14655a"},"notice":"GroundRules: Original legal text. Not legal advice."}
