{"data":{"id":"us/40-cfr-62.15955","jurisdiction":"us","citation":"40 CFR 62.15955","heading":"What emission limits and standards must I meet and by when?","body":"You must meet the emission limits and standards specified in Table 2 or 3 to this subpart by the final compliance date specified in § 62.15875. The emission limits and standards apply at all times the unit is operating and during periods of malfunction. The emission limits and standards apply to emissions from a bypass stack or vent while sewage sludge is in the combustion chamber (i.e., until the sewage sludge feed to the combustor has been cut off for a period of time not less than the sewage sludge incineration residence time).","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 62—APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS","Subpart LLL—Federal Plan Requirements for Sewage Sludge Incineration Units Constructed on or Before October 14, 2010"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"3bdebdea6edb6084418e5310e8ae5fbee1d2319cde9860b7bcef7e3de32bf8d4","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-62.15950","next":"us/40-cfr-62.15960"},"notice":"GroundRules: Original legal text. Not legal advice."}
