{"data":{"id":"us/40-cfr-62.2608","jurisdiction":"us","citation":"40 CFR 62.2608","heading":"Identification of sources.","body":"The plan applies to existing hospital/medical/infectious waste incinerators for which construction, reconstruction, or modification was commenced before June 20, 1996, as described in 40 CFR Part 60, Subpart Ce.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 62—APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS","Subpart L—Georgia"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"3a47d6e6b81345dff8e312500fc428da026303a0d5a5ac1c6b579a59c2c606c1","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-62.2607","next":"us/40-cfr-62.2609"},"notice":"GroundRules: Original legal text. Not legal advice."}
