{"data":{"id":"us/40-cfr-63.11088","jurisdiction":"us","citation":"40 CFR 63.11088","heading":"What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline terminal?","body":"(a) You must meet each emission limit and management practice in Table 2 to this subpart that applies to you.\n(b) As an alternative for railcar cargo tanks to the requirements specified in Table 2 to this subpart, you may comply with the requirements specified in § 63.422(e).\n(c) You must comply with the requirements of this subpart by the applicable dates specified in § 63.11083.\n(d) You must comply with the applicable testing and monitoring requirements specified in § 63.11092. As an alternative to the pressure monitoring requirements specified in § 60.504a(d) of this chapter, you may comply with the requirements specified in § 63.11092(h).\n(e) You must submit the applicable notifications as required under § 63.11093.\n(f) You must keep records and submit reports as specified in §§ 63.11094 and 63.11095.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES","Subpart BBBBBB—National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"229792271d2bfe083d24dd9b0dd803af74721ad9a9e398b9c22dc699f7cf8ae0","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-63.11087","next":"us/40-cfr-63.11089"},"notice":"GroundRules: Original legal text. Not legal advice."}
