{"data":{"id":"us/40-cfr-63.7328","jurisdiction":"us","citation":"40 CFR 63.7328","heading":"How do I demonstrate initial compliance with the operation and maintenance requirements that apply to me?","body":"You have demonstrated initial compliance if you certify in your notification of compliance status that you have met the requirements of paragraphs (a) through (d) of this section:\n(a) You have prepared the operation and maintenance plans according to the requirements in § 63.7300(b) and (c);\n(b) You will operate each by-product coke oven battery and each capture system and control device applied to pushing emissions from a coke oven battery according to the procedures in the plans beginning no later than the compliance date that is specified in § 63.7283;\n(c) You have prepared a site-specific monitoring plan according to the requirements in § 63.7331(b); and\n(d) You submit a notification of compliance status according to the requirements in § 63.7340(e).","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES","Subpart CCCCC—National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"bf3bfa78b42bbfaa275c7f1a5f88c6fcad176d55a087c8873329e12e99226203","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-63.7327","next":"us/40-cfr-63.7330"},"notice":"GroundRules: Original legal text. Not legal advice."}
