{"data":{"id":"us/40-cfr-75.67","jurisdiction":"us","citation":"40 CFR 75.67","heading":"Retired units petitions.","body":"(a) [Reserved]\n(b) For combustion sources seeking to enter the Opt-in Program in accordance with part 74 of this chapter that will be permanently retired and governed upon entry into the Opt-in Program by a thermal energy plan in accordance with § 74.47 of this chapter, an exemption from the requirements of this part, including the requirement to install and certify a continuous emissions monitoring system, may be obtained from the Administrator if the designated representative submits to the Administrator a petition for such an exemption prior to the deadline in § 75.4 by which the continuous emission or opacity monitoring systems must complete the required certification tests.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 75—CONTINUOUS EMISSION MONITORING","Subpart G—Reporting Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"dc54142f3abd2dc62d89f0378e5ee83fef69d8ee177a8d6b712c38374fe1353c","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-75.66","next":"us/40-cfr-75.68"},"notice":"GroundRules: Original legal text. Not legal advice."}
