{"data":{"id":"us/40-cfr-table-1-to-subpart-lll-of-part-63","jurisdiction":"us","citation":"40 CFR Table 1 to Subpart LLL of Part 63","heading":"Table 1 to Subpart LLL of Part 63—Applicability of General Provisions","body":"Citation Requirement Applies to subpart LLL Explanation\n63.1(a)(1)-(4) Applicability Yes\n63.1(a)(5) No [Reserved].\n63.1(a)(6)-(8) Applicability Yes\n63.1(a)(9) No [Reserved].\n63.1(a)(10)-(14) Applicability Yes\n63.1(b)(1) Initial Applicability Determination No § 63.1340 specifies applicability.\n63.1(b)(2)-(3) Initial Applicability Determination Yes\n63.1(c)(1) Applicability After Standard Established Yes\n63.1(c)(2) Permit Requirements Yes Area sources must obtain Title V permits.\n63.1(c)(3) No [Reserved].\n63.1(c)(4)-(5) Extensions, Notifications Yes\n63.1(c)(6) Reclassification Yes\n63.1(d) No [Reserved].\n63.1(e) Applicability of Permit Program Yes\n63.2 Definitions Yes Additional definitions in § 63.1341.\n63.3(a)-(c) Units and Abbreviations Yes\n63.4(a)(1)-(3) Prohibited Activities Yes\n63.4(a)(4) No [Reserved].\n63.4(a)(5) Compliance date Yes\n63.4(b)-(c) Circumvention, Severability Yes\n63.5(a)(1)-(2) Construction/Reconstruction Yes\n63.5(b)(1) Compliance Dates Yes\n63.5(b)(2) No [Reserved].\n63.5(b)(3)-(6) Construction Approval, Applicability Yes\n63.5(c) No [Reserved].\n63.5(d)(1)-(4) Approval of Construction/Reconstruction Yes\n63.5(e) Approval of Construction/Reconstruction Yes\n63.5(f)(1)-(2) Approval of Construction/Reconstruction Yes\n63.6(a) Compliance for Standards and Maintenance Yes\n63.6(b)(1)-(5) Compliance Dates Yes\n63.6(b)(6) No [Reserved].\n63.6(b)(7) Compliance Dates Yes\n63.6(c)(1)-(2) Compliance Dates Yes\n63.6(c)(3)-(4) No [Reserved].\n63.6(c)(5) Compliance Dates Yes\n63.6(d) No [Reserved].\n63.6(e)(1)-(2) Operation \u0026 Maintenance No See § 63.1348(d) for general duty requirement. Any reference to § 63.6(e)(1)(i) in other General Provisions or in this subpart is to be treated as a cross-reference to § 63.1348(d).\n63.6(e)(3) Startup, Shutdown Malfunction Plan No Your operations and maintenance plan must address periods of startup and shutdown. See § 63.1347(a)(1).\n63.6(f)(1) Compliance with Emission Standards No Compliance obligations specified in subpart LLL.\n63.6(f)(2)-(3) Compliance with Emission Standards Yes\n63.6(g)(1)-(3) Alternative Standard Yes\n63.6(h)(1) Opacity/VE Standards No Compliance obligations specified in subpart LLL.\n63.6(h)(2) Opacity/VE Standards Yes\n63.6(h)(3) No [Reserved].\n63.6(h)(4)-(h)(5)(i) Opacity/VE Standards Yes\n63.6(h)(5)(ii)-(iv) Opacity/VE Standards No Test duration specified in subpart LLL.\n63.6(h)(6) Opacity/VE Standards Yes\n63.6(h)(7) Opacity/VE Standards Yes\n63.6(i)(1)-(14) Extension of Compliance Yes\n63.6(i)(15) No [Reserved].\n63.6(i)(16) Extension of Compliance Yes\n63.6(j) Exemption from Compliance Yes\n63.7(a)(1)-(3) Performance Testing Requirements Yes § 63.1349 has specific requirements.\n63.7(b) Notification period Yes Except for repeat performance test caused by an exceedance. See § 63.1353(b)(6).\n63.7(c) Quality Assurance/Test Plan Yes\n63.7(d) Testing Facilities Yes\n63.7(e)(1) Conduct of Tests No See § 63.1349(e). Any reference to 63.7(e)(1) in other General Provisions or in this subpart is to be treated as a cross-reference to § 63.1349(e).\n63.7(e)(2)-(4) Conduct of tests Yes\n63.7(f) Alternative Test Method Yes\n63.7(g) Data Analysis Yes\n63.7(h) Waiver of Tests Yes\n63.8(a)(1) Monitoring Requirements Yes\n63.8(a)(2) Monitoring No § 63.1350 includes CEMS requirements.\n63.8(a)(3) No [Reserved].\n63.8(a)(4) Monitoring No Flares not applicable.\n63.8(b)(1)-(3) Conduct of Monitoring Yes\n63.8(c)(1)-(8) CMS Operation/Maintenance Yes Temperature and activated carbon injection monitoring data reduction requirements given in subpart LLL.\n63.8(d) Quality Control Yes, except for the reference to the SSM Plan in the last sentence\n63.8(e) Performance Evaluation for CMS Yes\n63.8(f)(1)-(5) Alternative Monitoring Method Yes Additional requirements in § 63.1350(l).\n63.8(f)(6) Alternative to RATA Test Yes\n63.8(g) Data Reduction Yes\n63.9(a) Notification Requirements Yes\n63.9(b)(1)-(5) Initial Notifications Yes\n63.9(c) Request for Compliance Extension Yes\n63.9(d) New Source Notification for Special Compliance Requirements Yes\n63.9(e) Notification of performance test Yes Except for repeat performance test caused by an exceedance. See § 63.1353(b)(6).\n63.9(f) Notification of VE/Opacity Test Yes Notification not required for VE/opacity test under § 63.1350(e) and (j).\n63.9(g) Additional CMS Notifications Yes\n63.9(h)(1)-(3) Notification of Compliance Status Yes\n63.9(h)(4) No [Reserved].\n63.9(h)(5)-(6) Notification of Compliance Status Yes\n63.9(i) Adjustment of Deadlines Yes\n63.9(j) Change in Previous Information Yes\n63.9(k) Electronic reporting procedures Yes Only as specified in § 63.9(j).\n63.10(a) Recordkeeping/Reporting Yes\n63.10(b)(1) General Recordkeeping Requirements Yes\n63.10(b)(2)(i)-(ii) General Recordkeeping Requirements No See § 63.1355(g) and (h).\n63.10(b)(2)(iii) General Recordkeeping Requirements Yes\n63.10(b)(2)(iv)-(v) General Recordkeeping Requirements No\n63.10(b)(2)(vi)-(ix) General Recordkeeping Requirements Yes\n63.10(c)(1) Additional CMS Recordkeeping Yes PS-8A supersedes requirements for THC CEMS.\n63.10(c)(1) Additional CMS Recordkeeping Yes PS-8A supersedes requirements for THC CEMS.\n63.10(c)(2)-(4) No [Reserved].\n63.10(c)(5)-(8) Additional CMS Recordkeeping Yes PS-8A supersedes requirements for THC CEMS.\n63.10(c)(9) No [Reserved].\n63.10(c)(10)-(15) Additional CMS Recordkeeping Yes PS-8A supersedes requirements for THC CEMS.\n63.10(d)(1) General Reporting Requirements Yes\n63.10(d)(2) Performance Test Results Yes\n63.10(d)(3) Opacity or VE Observations Yes\n63.10(d)(4) Progress Reports Yes\n63.10(d)(5) Startup, Shutdown, Malfunction Reports No See § 63.1354(c) for reporting requirements. Any reference to § 63.10(d)(5) in other General Provisions or in this subpart is to be treated as a cross-reference to § 63.1354(c).\n63.10(e)(1)-(2) Additional CMS Reports Yes\n63.10(e)(3) Excess Emissions and CMS Performance Reports Yes Exceedances are defined in subpart LLL.\n63.10(e)(3)(v) Due Dates for Excess Emissions and CMS Performance Reports No § 63.1354(b)(9) specifies due date.\n63.10(e)(3)(vii) and (viii) Excess Emissions and CMS Performance Reports No Superseded by 63.1354(b)(10).\n63.10(f) Waiver for Recordkeeping/Reporting Yes\n63.11(a)-(b) Control Device Requirements No Flares not applicable.\n63.12(a)-(c) State Authority and Delegations Yes\n63.13(a)-(c) State/Regional Addresses Yes\n63.14(a)-(b) Incorporation by Reference Yes\n63.15(a)-(b) Availability of Information Yes","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES","Subpart LLL—National Emission Standards for Hazardous Air Pollutants From the Portland Cement Manufacturing Industry"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"c397c4bbcb5090ffcb5fd2092575265e709e77ec4f4fc5f5c8daaaf049154d45","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-63.1359","next":"us/40-cfr-table-2-to-subpart-lll-of-part-63"},"notice":"GroundRules: Original legal text. Not legal advice."}
