{"data":{"id":"us/40-cfr-table-2-to-subpart-ooo-of-part-60","jurisdiction":"us","citation":"40 CFR Table 2 to Subpart OOO of Part 60","heading":"Table 2 to Subpart OOO of Part 60—Stack Emission Limits for Affected Facilities With Capture Systems","body":"For * * * The owner or operator must meet a PM limit of * * * And the owner or operator must meet an opacity limit of * * * The owner or operator must demonstrate compliance with these limits by conducting * * *\nAffected facilities (as defined in §§ 60.670 and 60.671) that commenced construction, modification, or reconstruction after August 31, 1983 but before April 22, 2008 0.05 g/dscm (0.022 gr/dscf) a 7 percent for dry control devices b An initial performance test according to § 60.8 of this part and § 60.675 of this subpart; and Monitoring of wet scrubber parameters according to § 60.674(a) and § 60.676(c), (d), and (e).\nAffected facilities (as defined in §§ 60.670 and 60.671) that commence construction, modification, or reconstruction on or after April 22, 2008 0.032 g/dscm (0.014 gr/dscf) a Not applicable (except for individual enclosed storage bins) 7 percent for dry control devices on individual enclosed storage bins An initial performance test according to § 60.8 of this part and § 60.675 of this subpart; and Monitoring of wet scrubber parameters according to § 60.674(a) and § 60.676(c), (d), and (e); and\nMonitoring of baghouses according to § 60.674(c), (d), or (e) and § 60.676(b).\na Exceptions to the PM limit apply for individual enclosed storage bins and other equipment. See § 60.672(d) through (f).\nb The stack opacity limit and associated opacity testing requirements do not apply for affected facilities using wet scrubbers.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 60—STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES","Subpart OOO—Standards of Performance for Nonmetallic Mineral Processing Plants"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"a98415e1bc77924afdb184e3125ad924d9cec67623526a6ca2b308f3960283a3","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-table-1-to-subpart-ooo-of-part-60","next":"us/40-cfr-table-3-to-subpart-ooo-of-part-60"},"notice":"GroundRules: Original legal text. Not legal advice."}
