{"data":{"id":"us/40-cfr-table-3-to-subpart-pppppp-of-part-63","jurisdiction":"us","citation":"40 CFR Table 3 to Subpart PPPPPP of Part 63","heading":"Table 3 to Subpart PPPPPP of Part 63—Applicability of General Provisions to This Subpart","body":"As required in § 63.11425, you must comply with the requirements of the NESHAP General Provisions (subpart A of this part) as shown in the following table.\nCitation Subject Applies to this subpart? Explanation\n63.1 Applicability Yes\n63.2 Definitions Yes\n63.3 Units and Abbreviations\n63.4 Prohibited Activities and Circumvention Yes\n63.5 Preconstruction Review and Notification Requirements No\n63.6(a) through (d) Compliance with Standards and Maintenance Requirements Yes\n63.6(e)(1)(i) General Duty to Minimize Emissions No Section 63.11423(a)(3) specifies general duty requirements.\n63.6(e)(1)(ii) Requirement to correct malfunctions as soon as possible No\n63.6(e)(1)(iii) Enforceability of requirements independent of other regulations Yes\n63.6(e)(3) SSM Plans No This subpart does not require a startup, shutdown, and malfunction plan.\n63.6(f)(1) Compliance Except During SSM No\n63.6(f)(2) and (3) Methods for determining compliance Yes\n63.6(g) Use of an alternative nonopacity emission standard Yes\n63.6(h)(1) SSM Exemption No\n63.6(h)(2) through (9), (i) through (j) Compliance with opacity/visible emission standards, compliance extensions and exemptions Yes\n63.7(a) through (d), (e)(2) and (3), (f) through (h) Performance Testing Requirements Yes\n63.7(e)(1) Conditions for conducting performance tests No Requirements for performance test conditions are found in § 63.11423(c)(7).\n63.8(a), (b), (c)(1)(ii), (d)(1) and (2), (e) through (g) Monitoring Requirements Yes\n63.8(c)(1)(i) General duty to minimize emissions and CMS operation No Section 63.11423(a)(3) specifies general duty requirements.\n63.8(c)(1)(iii) Requirement to develop SSM Plan for CMS No\n63.8(d)(3) Written procedures for CMS No\n63.9 Notification Requirements Yes\n63.10(a), (b)(1), (b)(2)(iii), (b)(2)(vi) through (ix), (b)(3), (c)(1) through (14), (d)(1) through (4), (e), (f) Recordkeeping and Reporting Requirements Yes\n63.10(b)(2)(i) Recordkeeping of occurrence and duration of startups and shutdowns No\n63.10(b)(2)(ii) Recordkeeping of failures to meet a standard No Section 63.11424(a)(5) specifies these requirements.\n63.10(b)(2)(iv) and (v) Actions taken to minimize emissions during SSM No\n63.10(c)(15) Use of SSM Plan No\n63.10(d)(5) No This subpart does not require a startup, shutdown, and malfunction plan. See § 63.11424(c) for excess emissions reporting requirements.\n63.11 Control Device Requirements No This subpart does not require flares.\n63.12 State Authorities and Delegations Yes\n63.13 Addresses Yes\n63.14 Incorporations by Reference Yes\n63.15 Availability of Information and Confidentiality Yes\n63.16 Performance Track Provisions Yes\n63.1(a)(5), (a)(7) through (9), (b)(2), (c)(3), (d), 63.6(b)(6), (c)(3) and (4), (d), (e)(2), (e)(3)(ii), (h)(3), (h)(5)(iv), 63.8(a)(3), 63.9(b)(3), (h)(4), 63.10(c)(2) through (4), (c)(9) Reserved No","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES","Subpart PPPPPP—National Emission Standards for Hazardous Air Pollutants for Lead Acid Battery Manufacturing Area Sources"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"b1f1b53c679777512c64e2a8e20149aa3a7eb2d46f78545a1c690684cdbe2087","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-table-2-to-subpart-pppppp-of-part-63","next":"us/40-cfr-63.11428"},"notice":"GroundRules: Original legal text. Not legal advice."}
