{"data":{"id":"us/40-cfr-table-9-to-subpart-jjj-of-part-63","jurisdiction":"us","citation":"40 CFR Table 9 to Subpart JJJ of Part 63","heading":"Table 9 to Subpart JJJ of Part 63—Routine Reports Required by This Subpart","body":"Reference Description of report Due date\n§ 63.1335(b) and subpart A Refer to Table 1 and subpart A Refer to subpart A.\n§ 63.1335(e)(3) Precompliance Report a Existing affected sources—December 19, 2000. New affected sources—with application for approval of construction or reconstruction.\n§ 63.1335(e)(4) Emissions Averaging Plan September 19, 2000.\n§ 63.1335(e)(4)(iv) Updates to Emissions Averaging Plan 120 days prior to making the change necessitating the update.\n§ 63.1335(e)(5) Notification of Compliance Status b Within 150 days after the compliance date.\n§ 63.1335(e)(6) Periodic Reports Semiannually, no later than 60 days after the end of each 6-month period. See § 63.1335(e)(6)(i) for the due date for the first report.\n§ 63.1335(e)(6)(xi) Quarterly reports for Emissions Averaging No later than 60 days after the end of each quarter. First report is due with the Notification of Compliance Status.\n§ 63.1335(e)(6)(xii) Quarterly reports upon request of the Administrator No later than 60 days after the end of each quarter.\n§ 63.1335(e)(7)(i) Storage Vessels Notification of Inspection At least 30 days prior to the refilling of each storage vessel or the inspection of each storage vessel.\n§ 63.1335(e)(7)(ii) Requests for Approval of a Nominal Control Efficiency for Use in Emissions Averaging Initial submittal is due with the Emissions Averaging Plan specified in § 63.1335(e)(4)(ii); later submittals are made at the discretion of the owner or operator as specified in § 63.1335(e)(7)(ii) (B).\n§ 63.1335(e)(7)(iii) Notification of Change in the Primary Product 1. For notification under § 63.1310(f)(3)(ii)—notification submittal date at the discretion of the owner or operator.c\n2. For notification under § 63.1310(f)(4)(ii)—within 6 months of making the determination.\na There may be two versions of this report due at different times; one for equipment subject to § 63.1331 and one for other emission points subject to this subpart.\nb There will be two versions of this report due at different times; one for equipment subject to § 63.1331 and one for other emission points subject to this subpart.\nc Note that the TPPU remains subject to this subpart until the notification under § 63.1310(f)(3)(i) is made.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES","Subpart JJJ—National Emission Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"6b95a810d79bceddf71b9aedd73e396cca608757e4ab15cef08037d8e191abad","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-table-8-to-subpart-jjj-of-part-63","next":"us/40-cfr-63.1340"},"notice":"GroundRules: Original legal text. Not legal advice."}
