{"data":{"id":"us/40-cfr-table-9-to-subpart-vvvvvv-of-part-63","jurisdiction":"us","citation":"40 CFR Table 9 to Subpart VVVVVV of Part 63","heading":"Table 9 to Subpart VVVVVV of Part 63—Applicability of General Provisions to Subpart VVVVVV","body":"As required in § 63.11501(a), you must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A) as shown in the following table.\nTable 9 to Subpart VVVVVV of Part 63—Applicability of General Provisions to Subpart VVVVVV\n[As required in § 63.11501(a), you must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A) as shown in the following table.]\nCitation Subject Applies to this subpart? Explanation\n63.1(a)(1), (a)(2), (a)(3), (a)(4), (a)(6), (a)(10)-(a)(12) (b)(1), (b)(3), (c)(1), (c)(2), (c)(5), (e) Applicability Yes\n63.1(a)(5), (a)(7)-(a)(9), (b)(2), (c)(3), (c)(4), (d) Reserved No\n63.2 Definitions Yes\n63.3 Units and Abbreviations Yes\n63.4 Prohibited Activities and Circumvention Yes\n63.5 Preconstruction Review and Notification Requirements Yes\n63.6(a), (b)(1)-(b)(5), (b)(7), (c)(1), (c)(2), (c)(5), (e)(1)(iii), (g), (i), (j) Compliance with Standards and Maintenance Requirements Yes\n63.6(b)(6), (c)(3), (c)(4), (d), (e)(2) Reserved No\n63.6(e)(1)(i) and (ii), (e)(3), and (f)(1) SSM Requirements No See § 63.11495(d) for general duty requirement. The standards in this subpart apply at all times.\n63.6(f) Compliance with Nonopacity Emission Standards Yes\n63.6(h) Compliance with Opacity and Visible Emission Standards No This subpart does not include opacity or visible emissions (VE) standards or require a continuous opacity monitoring system (COMS).\n63.7(a)(1), (a)(3), (a)(4), (c), (e)(4), and (f)-(h) Performance Testing Requirements Yes Except this subpart specifies how and when the performance test results are reported.\n63.7(a)(2), (b), (d), (e)(2)-(e)(3) Performance Testing Schedule, Notification of Performance Test, Performance Testing Facilities, and Conduct of Performance Tests Yes/No Requirements apply if conducting test for metal HAP control; requirements in §§ 63.997(c)(1), (d), (e), and 63.999(a)(1) apply, as referenced in § 63.11496(g), if conducting test for organic HAP or hydrogen halide and halogen HAP control device.\n63.7(e)(1) Performance Testing No See § 63.11496(f)(3)(ii) if conducting a test for metal HAP emissions. See §§ 63.11496(g) and 63.997(e)(1) if conducting a test for continuous process vents or for hydrogen halide and halogen emissions. See §§ 63.11496(g) and 63.2460(c) if conducting a test for batch process vents.\n63.8(a)(1), (b), (c)(1)(ii), (c)(2)-(c)(3), (f)(1)-(5) Monitoring Requirements Yes\n63.8(a)(2) Monitoring Requirements No\n63.8(a)(3) Reserved No\n63.8(a)(4) Monitoring Requirements Yes\n63.8(c)(1)(i) General Duty to Minimize Emissions and CMS Operation No\n63.8(c)(1)(iii) Requirement to Develop SSM Plan for CMS No\n63.8(c)(4) Yes Only for CEMS. CPMS requirements in subpart SS of this part are referenced from § 63.11496. Requirements for COMS do not apply because this subpart does not require COMS.\n63.8(c)(5) No This subpart does not require COMS.\n63.8(c)(6)-(c)(8), (d)(1)-(d)(2), (e), (f)(6) Yes Requirements apply only if you use a continuous emission monitoring system (CEMS) to demonstrate compliance with the alternative standard in § 63.11496(e). Additionally, this subpart specifies how and when the performance evaluation results are reported.\n63.8(d)(3) Written Procedures for CMS Yes Requirement applies except for last sentence, which refers to an SSM plan. SSM plans are not required.\n63.8(g)(1)-(g)(4) Yes Data reduction requirements apply only if you use CEMS to demonstrate compliance with alternative standard in § 63.11496(e). COMS requirements do not apply. Requirement in § 63.8(g)(2) does not apply because data reduction for CEMS are specified in subpart FFFF of this part.\n63.8(g)(5) No Data reduction requirements for CEMS are specified in § 63.2450(j)(4), as referenced from § 63.11496. CPMS requirements are specified in subpart SS of this part, as referenced from § 63.11496.\n63.9(a), (b)(1), (b)(2), (b)(4), (b)(5), (c), (d), (e), (i) Notification Requirements Yes\n63.9(b)(3), (h)(4) Reserved No\n63.9(f) No This subpart does not contain opacity or VE limits.\n63.9(g) Yes Additional notification requirement applies only if you use CEMS to demonstrate compliance with alternative standard in § 63.11496(e).\n63.9(h)(1)-(h)(3), (h)(5)-(h)(6) Yes Except as specified in § 63.11501(b) and this subpart does not contain opacity or VE limits.\n63.9(j) Change in Information Already Provided No Notification of process changes that affect a compliance determination are required in § 63.11501(d)(4).\n63.9(k) Electronic Submission of Notifications or Reports Yes As specified in §§ 63.11496(g)(1)(iv), 63.11497(f)(1)(iv), and 63.11501(b) and (d).\n63.10(a) Recordkeeping Requirements Yes\n63.10(b)(1) Yes\n63.10(b)(2)(i) Recordkeeping of Occurrence and Duration of Startups and Shutdowns No See § 63.11501(c)(8) for recordkeeping of occurrence and duration of each startup and shutdown for continuous process vents that are subpart to table 3 to this subpart.\n63.10(b)(2)(ii) Recordkeeping of Malfunctions No See § 63.11501(c)(1)(vii) and (viii) for recordkeeping requirements.\n63.10(b)(2)(iii) Maintenance Records Yes\n63.10(b)(2)(iv) and (v) Actions Taken to Minimize Emissions During SSM No\n63.10(b)(2)(vi), (x), (xi), (xiii) Yes Apply only if you use CEMS to demonstrate compliance with alternative standard in § 63.11496(e).\n63.10(b)(2)(vii)-(b)(2)(ix), (b)(2)(xii), (b)(2)(xiv) Yes\n63.10(b)(3) Yes\n63.10(c)(1), (c)(5)-(c)(6), (c)(13)-(c)(14) Yes Apply only if you use CEMS to demonstrate compliance with alternative standard in § 63.11496(e).\n63.10(c)(7)-(8) Additional Recordkeeping Requirements for CMS—Identifying Exceedances and Excess Emissions Yes\n63.10(c)(10) Recordkeeping Nature and Cause of Malfunctions No See § 63.11501(c)(1)(vii) and (viii) for recordkeeping requirements.\n63.10(c)(11) Recording Corrective Actions No See § 63.11501(c)(1)(vii) and (viii) for recordkeeping requirements.\n63.10(c)(12) Yes\n63.10(c)(15) Use of SSM Plan No\n63.10(c)(2)-(c)(4), (c)(9) Reserved No\n63.10(d)(1), (d)(4), (f) Reporting Requirements Yes\n63.10(d)(2) No See §§ 63.11496(g)(1)(iv) and 63.11497(f)(1)(iv) for performance test reporting.\n63.10(d)(3) No This subpart does not include opacity or VE limits.\n63.10(d)(5) SSM Reports No See § 63.11501(d)(1) and (8) for reporting requirements.\n63.10(e)(1)-(e)(2) Yes Apply only if you use CEMS to demonstrate compliance with alternative standard in § 63.11496(e). Additionally, this subpart specifies how and when the performance evaluation results are reported.\n63.10(e)(3) No Except as provided in § 63.11501(d).\n63.10(e)(4) No This subpart does not include opacity or VE limits.\n63.11 Control Device Requirements Yes\n63.12 State Authorities and Delegations Yes\n63.13 Addresses Yes\n63.14 Incorporations by Reference Yes\n63.15 Availability of Information and Confidentiality Yes\n63.16 Performance Track Provisions Yes","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES","Subpart VVVVVV—National Emission Standards for Hazardous Air Pollutants for Chemical Manufacturing Area Sources"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"ec2631fcc391db2974ac9304516409cec433720038883918c1206083350230fa","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-table-8-to-subpart-vvvvvv-of-part-63","next":"us/40-cfr-63.11504"},"notice":"GroundRules: Original legal text. Not legal advice."}
