{"data":{"id":"us/41-cfr-101-27.206-1","jurisdiction":"us","citation":"41 CFR 101-27.206-1","heading":"-27.206-1 General considerations.","body":"In determining requirements for shelf-life items, the following elements should be taken into consideration:\n(a) Assigned storage time periods; and\n(b) Appropriate contracting techniques for the particular item involved, including specification requirements, industry practices, and storage and delivery procedures.","path":["Title 41—Public Contracts and Property Management","Subtitle C—Federal Property Management Regulations System","CHAPTER 101—FEDERAL PROPERTY MANAGEMENT REGULATIONS","SUBCHAPTER E—SUPPLY AND PROCUREMENT","PART 101-27—INVENTORY MANAGEMENT","Subpart 101-27.2—Management of Shelf-Life Materials"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-41.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:05Z","sha256":"2e6bb379503b5eaddfbd4d79b9761ca2773e8dfd4c4970e54359a1bf0934e361","source_id":"us-cfr","stale":true,"prev":"us/41-cfr-101-27.206","next":"us/41-cfr-101-27.206-2"},"notice":"GroundRules: Original legal text. Not legal advice."}
