{"data":{"id":"us/41-u.s.c.-1711","jurisdiction":"us","citation":"41 U.S.C. § 1711","heading":"Value engineering","body":"Each executive agency shall establish and maintain cost-effective procedures and processes for analyzing the functions of a program, project, system, product, item of equipment, building, facility, service, or supply of the agency. The analysis shall be—(1) performed by qualified agency or contractor personnel; and (2) directed at improving performance, reliability, quality, safety, and life cycle costs.","path":["Title 41—PUBLIC CONTRACTS","CHAPTER 17—AGENCY RESPONSIBILITIES AND PROCEDURES"],"source_url":"https://uscode.house.gov/download/releasepoints/us/pl/119/103/xml_usc41@119-103.zip","current_through":"Public Law 119-103 (09/02/2026)","vintage":"","retrieved_at":"2026-09-10T05:59:59Z","sha256":"4bc12fea0bffda99974c453af168a2e087ea8b7c389dd5a5f5987f8c83a13bfe","source_id":"us","stale":true,"prev":"us/41-u.s.c.-1710","next":"us/41-u.s.c.-1712"},"notice":"GroundRules: Original legal text. Not legal advice."}
