{"data":{"id":"us/42-u.s.c.-16441","jurisdiction":"us","citation":"42 U.S.C. § 16441","heading":"Funding new interconnection and transmission upgrades","body":"The Commission may approve a participant funding plan that allocates costs related to transmission upgrades or new generator interconnection, without regard to whether an applicant is a member of a Commission-approved Transmission Organization, if the plan results in rates that—(1) are just and reasonable; (2) are not unduly discriminatory or preferential; and (3) are otherwise consistent with sections 824d and 824e of title 16.","path":["Title 42—THE PUBLIC HEALTH AND WELFARE","CHAPTER 149—NATIONAL ENERGY POLICY AND PROGRAMS"],"source_url":"https://uscode.house.gov/download/releasepoints/us/pl/119/103/xml_usc42@119-103.zip","current_through":"Public Law 119-103 (09/02/2026)","vintage":"","retrieved_at":"2026-09-10T06:00:34Z","sha256":"199a098bc6d11a265c4e75e74761841f1a868ab868a7248a427ccf2d3776f775","source_id":"us","stale":true,"prev":"us/42-u.s.c.-16432","next":"us/42-u.s.c.-16451"},"notice":"GroundRules: Original legal text. Not legal advice."}
