{"data":{"id":"us/42-u.s.c.-8454","jurisdiction":"us","citation":"42 U.S.C. § 8454","heading":"Study of compliance problem of small electric utility systems","body":"(a) StudyThe Secretary shall conduct a study of the problems of compliance with this chapter experienced by those electric utility systems which have a total system generating capacity of less than 2,000 megawatts. The Secretary shall report his findings and his recommendations to the Congress not later than 2 years after the effective date of this chapter. (b) Authorization of appropriationsThere is authorized to be appropriated to the Secretary for the fiscal year 1979 not to exceed $500,000 to carry out the provisions of this section.","path":["Title 42—THE PUBLIC HEALTH AND WELFARE","CHAPTER 92—POWERPLANT AND INDUSTRIAL FUEL USE"],"source_url":"https://uscode.house.gov/download/releasepoints/us/pl/119/103/xml_usc42@119-103.zip","current_through":"Public Law 119-103 (09/02/2026)","vintage":"","retrieved_at":"2026-09-10T06:00:34Z","sha256":"638c654c09751ce969af40d6e9b5374430b89d9d152d7e6ce7094fdfbe48cc52","source_id":"us","stale":true,"prev":"us/42-u.s.c.-8453","next":"us/42-u.s.c.-8455"},"notice":"GroundRules: Original legal text. Not legal advice."}
