{"data":{"id":"us/43-cfr-1822.15","jurisdiction":"us","citation":"43 CFR 1822.15","heading":"If I miss filing a required document or payment within the specified period, can BLM consider it timely filed anyway?","body":"BLM may consider it timely filed if:\n(a) The law does not prohibit BLM from doing so;\n(b) No other BLM regulation prohibits doing so; and\n(c) No intervening third party interests or rights have been created or established during the intervening period.","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER A—GENERAL MANAGEMENT (1000)","PART 1820—APPLICATION PROCEDURES","Subpart 1822—Filing a Document with BLM"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"30ccea9d4a19b573621b575bb360e58a96d8c26b5c43f4f88570c3592ab2f546","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-1822.14","next":"us/43-cfr-1822.16"},"notice":"GroundRules: Original legal text. Not legal advice."}
