{"data":{"id":"us/43-cfr-1822.18","jurisdiction":"us","citation":"43 CFR 1822.18","heading":"How does BLM decide in which order to accept documents that are simultaneously filed?","body":"BLM makes this decision by a drawing open to the public.","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER A—GENERAL MANAGEMENT (1000)","PART 1820—APPLICATION PROCEDURES","Subpart 1822—Filing a Document with BLM"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"47c57d19a1339a71fc53449acc234510c88e4ae5f63c9aa52fcb06038cf8d7c0","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-1822.17","next":"us/43-cfr-1823.10"},"notice":"GroundRules: Original legal text. Not legal advice."}
