{"data":{"id":"us/43-cfr-2806.56","jurisdiction":"us","citation":"43 CFR 2806.56","heading":"Rent for support facilities authorized under separate grant(s).","body":"If a solar energy development project includes separate right-of-way authorizations issued for support facilities only (administration building, groundwater wells, construction lay down and staging areas, surface water management and control structures, etc.) or linear right-of-way facilities (pipelines, roads, power lines, etc.), rent is determined using the Per Acre Rent Schedule for linear facilities (see § 2806.20(c)).","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—LAND RESOURCE MANAGEMENT (2000) Group 2000—Land Resource Management; General","PART 2800—RIGHTS-OF-WAY UNDER THE FEDERAL LAND POLICY AND MANAGEMENT ACT","Subpart 2806—Annual Rents and Payments"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"dd45b8f25a3832dc1fd2d24a4a8cee273739a61b8b205527df90c1ad796a69e8","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-2806.54","next":"us/43-cfr-2806.58"},"notice":"GroundRules: Original legal text. Not legal advice."}
