{"data":{"id":"us/43-cfr-2881.12","jurisdiction":"us","citation":"43 CFR 2881.12","heading":"When do I need a TUP for an oil and gas pipeline?","body":"You must obtain a TUP from BLM when you require temporary use of more land than your grant authorizes in order to construct, operate, maintain, or terminate your pipeline, or to protect the environment or public safety.","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—LAND RESOURCE MANAGEMENT (2000) Group 2000—Land Resource Management; General","PART 2880—RIGHTS-OF-WAY UNDER THE MINERAL LEASING ACT","Subpart 2881—General Information"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"4e5ce79e5818d388025e2733f7deeb986cfade99ddb7f329ceabbedcf60a774e","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-2881.11","next":"us/43-cfr-2882.10"},"notice":"GroundRules: Original legal text. Not legal advice."}
