{"data":{"id":"us/43-cfr-3171.11","jurisdiction":"us","citation":"43 CFR 3171.11","heading":"Onsite inspection.","body":"The onsite inspection must be conducted before the APD will be considered complete.","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER C—MINERALS MANAGEMENT (3000)","PART 3170—ONSHORE OIL AND GAS PRODUCTION","Subpart 3171—Approval of Operations"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"18b8084bf3fbcd187b519532b1cd62b404541c4b183d90a954c4488416a1c118","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-3171.10","next":"us/43-cfr-3171.12"},"notice":"GroundRules: Original legal text. Not legal advice."}
