{"data":{"id":"us/43-cfr-3173.22","jurisdiction":"us","citation":"43 CFR 3173.22","heading":"Requirements for off-lease measurement.","body":"The BLM will consider granting a request for off-lease measurement if the request:\n(a) Involves only production from a single lease, unit PA, CA, or CAA;\n(b) Provides for accurate production accountability;\n(c) Is in the public interest (considering factors such as BMPs, topographic and environmental conditions that make on-lease measurement physically impractical, and maximum ultimate economic recovery); and\n(d) Occurs at an approved FMP. A request for approval of an FMP (see § 3173.12) may be filed concurrently with the request for off-lease measurement.","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER C—MINERALS MANAGEMENT (3000)","PART 3170—ONSHORE OIL AND GAS PRODUCTION","Subpart 3173—Requirements for Site Security and Production Handling"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"08812e235b909159716af13eea0fcc72050ee7f33cace313160d086126e12be8","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-3173.21","next":"us/43-cfr-3173.23"},"notice":"GroundRules: Original legal text. Not legal advice."}
