{"data":{"id":"us/43-cfr-3179.43","jurisdiction":"us","citation":"43 CFR 3179.43","heading":"Data submission and notification requirements.","body":"(a) Table 1 is a summary of the Sundry Notice requirements in this subpart.\nTable 1 to Paragraph (a)—Notification Via Sundry Notice Requirements\nSundry notice requirements Reference\nFlaring of gas following removal of ≥50 percent of the natural gas liquids from the gas stream on-lease § 3179.41(b)(12).\nOther gas sample location for flare approved by the AO § 3179.71(d)(3) and (e)(2).\nUnavoidable/avoidable determination of loss of oil and/or gas while drilling for loss of well control event § 3179.80.\nExtension of time limit or volumetric limit for well completion or recompletion flaring, or exploratory coalbed methane dewatering flaring § 3179.81(e).\nExtension of time limit for well testing subsequent to initial completion § 3179.82.\nWithin 45 days of start of an emergency, estimate the volume flared or vented beyond the first 48 hours of the emergency § 3179.83(c).\nDelay of leak repair beyond 30 calendar days with good cause § 3179.101(b).\n(b) Table 2 summarizes the locations in this subpart that require an operator to provide information to the authorized officer upon request.\nTable 2 to Paragraph (b)—Information Required at the Request of the AO\nInformation required at the request of the AO Reference\nUltrasonic meter flare gas testing report § 3179.71(c)(2)(i).\nUltrasonic meter manufacturer's specifications including installation and operation specifications § 3179.71(c)(2)(ii).\nRecordkeeping for vented or flared gas events § 3179.72(c).\nRecordkeeping for leak detection and repair § 3179.102(a).\n(c) Table 3 summarizes the initial LDAR program submission and subsequent annual reporting.\nTable 3 to Paragraph (c)—LDAR Program\nInformation required to be sent to the BLM State Office Reference\nFirst submission of a leak detection and repair program to the BLM for review § 3179.100(b) and (d).\nAnnual review and update of the leak detection and repair program to the BLM § 3179.100(e).","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER C—MINERALS MANAGEMENT (3000)","PART 3170—ONSHORE OIL AND GAS PRODUCTION","Subpart 3179—Waste Prevention and Resource Conservation"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"dfdab09af3b25f14098c4ae73a2aaf6807149ae2b50bbdba78bcdec358d3232f","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-3179.42","next":"us/43-cfr-3179.50"},"notice":"GroundRules: Original legal text. Not legal advice."}
