{"data":{"id":"us/43-cfr-3252.14","jurisdiction":"us","citation":"43 CFR 3252.14","heading":"How must I complete a temperature gradient well?","body":"Complete temperature gradient wells to allow for proper abandonment, and to prevent interzonal migration of fluids. Cap all tubing when not in use.","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER C—MINERALS MANAGEMENT (3000)","PART 3200—GEOTHERMAL RESOURCE LEASING","Subpart 3252—Conducting Exploration Operations"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"e620a5a928700172e0bff6657ddaac124890142b53559c5c253fa300114a10ab","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-3252.13","next":"us/43-cfr-3252.15"},"notice":"GroundRules: Original legal text. Not legal advice."}
