{"data":{"id":"us/43-cfr-3264.10","jurisdiction":"us","citation":"43 CFR 3264.10","heading":"What must I submit to BLM after I complete a well?","body":"You must submit a Geothermal Well Completion Report, Form 3260-4, within 30 days after you complete a well. Your report must include the following:\n(a) A complete, chronological well history;\n(b) A copy of all logs;\n(c) Copies of all directional surveys; and\n(d) Copies of all mechanical, flow, reservoir, and other test data.","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER C—MINERALS MANAGEMENT (3000)","PART 3200—GEOTHERMAL RESOURCE LEASING","Subpart 3264—Reports—Drilling Operations"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"9b834b72a1c85878163009c29b6ac3c0df34722308e5d7c79c83b7ef2e04e385","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-3263.15","next":"us/43-cfr-3264.11"},"notice":"GroundRules: Original legal text. Not legal advice."}
