{"data":{"id":"us/43-cfr-3273.15","jurisdiction":"us","citation":"43 CFR 3273.15","heading":"What must I include in my site license application?","body":"Your site license application must include:\n(a) A description of the boundaries of the land applied for, as determined by a certified licensed surveyor. Describe the land by legal subdivision, section, township and range, or by approved protraction surveys, if applicable;\n(b) The affected acreage;\n(c) The filing fee for a site license application found in the fee schedule in § 3000.12 of this chapter;\n(d) A site license bond (see § 3273.19);\n(e) The first year's rent, if applicable (see § 3273.18); and\n(f) Documentation that the lessee or unit operator accepts the siting of the facility, if the facility operator is neither the lessee nor the unit operator.","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER C—MINERALS MANAGEMENT (3000)","PART 3200—GEOTHERMAL RESOURCE LEASING","Subpart 3273—How To Apply for a Site License"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"d30286d5c3099dbb718aff693445f1d059574ad601214fb6f25614568c3b83e4","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-3273.14","next":"us/43-cfr-3273.16"},"notice":"GroundRules: Original legal text. Not legal advice."}
