{"data":{"id":"us/43-cfr-3274.11","jurisdiction":"us","citation":"43 CFR 3274.11","heading":"What must I give BLM to approve my commercial use permit application?","body":"Submit a completed and signed commercial permit form, to BLM, containing the following information:\n(a) The design specifications, and the inspection and calibration schedule of production, injection, and royalty meters;\n(b) A schematic diagram of the utilization site or individual well, showing the location of each production and royalty meter. If the sales point is located off the utilization site, give us a generalized schematic diagram of the electrical transmission or pipeline system, including meter locations;\n(c) A copy of the sales contract for the sale and/or utilization of geothermal resources;\n(d) A description and analysis of reservoir, production, and injection characteristics, including the flow rates, temperatures, and pressures of each production and injection well;\n(e) A schematic diagram of each production and injection well showing the wellhead configuration, including meters;\n(f) A schematic flow diagram of the utilization facility, including interconnections with other facilities, if applicable;\n(g) A description of the utilization process in sufficient detail to enable BLM to determine whether the resource will be utilized in a manner consistent with law and regulations;\n(h) The planned safety provisions for emergency shutdown to protect public health, safety, property, and the environment. This should include a schedule for the testing and maintenance of safety devices;\n(i) The environmental and operational parameters that will be monitored during the operation of the facility and/or well(s); and\n(j) Any additional information or data that we may require.","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER C—MINERALS MANAGEMENT (3000)","PART 3200—GEOTHERMAL RESOURCE LEASING","Subpart 3274—Applying for and Obtaining a Commercial Use Permit"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"91b188ba995f8713766edf697772610fca80892ca1dea4684ef108553d655716","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-3274.10","next":"us/43-cfr-3274.12"},"notice":"GroundRules: Original legal text. Not legal advice."}
