{"data":{"id":"us/43-cfr-3275.13","jurisdiction":"us","citation":"43 CFR 3275.13","heading":"How must the facility operator measure the geothermal resources?","body":"The facility operator must:\n(a) Measure all production, injection and utilization in accordance with methods and standards approved by BLM (see § 3275.15);\n(b) Maintain and test all metering equipment. If your equipment is defective or out of tolerance, you must promptly recalibrate, repair, or replace it; and\n(c) Determine the amount of production and/or utilization in accordance with methods and procedures approved by BLM (see § 3275.17).","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER C—MINERALS MANAGEMENT (3000)","PART 3200—GEOTHERMAL RESOURCE LEASING","Subpart 3275—Conducting Utilization Operations"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"493f37e8c58170f8352eeb74cd77e077c0ed2fa1e7f66f9324c4236c14488250","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-3275.12","next":"us/43-cfr-3275.14"},"notice":"GroundRules: Original legal text. Not legal advice."}
