{"data":{"id":"us/43-cfr-3276.13","jurisdiction":"us","citation":"43 CFR 3276.13","heading":"What additional information must I give BLM in the monthly report for flash and dry steam facilities?","body":"In addition to the regular monthly report information required by § 3276.12, send to BLM:\n(a) Steam flow into the turbine in klbs; for dual flash facilities, you must separate the steam flow into high pressure steam and low pressure steam;\n(b) Condenser pressure in psia;\n(c) Condenser temperature in deg. F;\n(d) Auxiliary steam flow used for gas ejectors, steam seals, pumps, etc., in klbs;\n(e) Flow of condensate out of the plant (after the cooling towers) in klbs; and\n(f) Any other information we may require.","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER C—MINERALS MANAGEMENT (3000)","PART 3200—GEOTHERMAL RESOURCE LEASING","Subpart 3276—Reports: Utilization Operations"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"f13d2409a0549776e2788b2d623815c90908e5880f49e69a956c9596269a98c4","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-3276.12","next":"us/43-cfr-3276.14"},"notice":"GroundRules: Original legal text. Not legal advice."}
