{"data":{"id":"us/43-cfr-3809.432","jurisdiction":"us","citation":"43 CFR 3809.432","heading":"What process will BLM follow in reviewing a modification of my plan of operations?","body":"(a) BLM will review and approve a modification of your plan of operations in the same manner as it reviewed and approved your initial plan under §§ 3809.401 through 3809.420; or\n(b) BLM will accept a minor modification without formal approval if it is consistent with the approved plan of operations and does not constitute a substantive change that requires additional analysis under the National Environmental Policy Act.","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER C—MINERALS MANAGEMENT (3000)","PART 3800—MINING CLAIMS UNDER THE GENERAL MINING LAWS","Subpart 3809—Surface Management"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"a3441c3298fe24243879563275640ff1f799e0453bd038babc25e997e6bcc6cb","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-3809.431","next":"us/43-cfr-3809.433"},"notice":"GroundRules: Original legal text. Not legal advice."}
