{"data":{"id":"us/43-cfr-4.1102","jurisdiction":"us","citation":"43 CFR 4.1102","heading":"Construction.","body":"These rules shall be construed to achieve the just, timely, and inexpensive determination of all proceedings consistent with adequate consideration of the issues involved.","path":["Title 43—Public Lands: Interior","Subtitle A—Office of the Secretary of the Interior","PART 4—DEPARTMENT OF THE INTERIOR HEARINGS AND APPEALS PROCEDURES","Subpart L—Specific Rules Applicable to Hearings and Appeals Concerning Surface Coal Mining"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"61fcd19c05dd74e3e5a56f2464bf969093551106dc43f02376b67f99da7eae27","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-4.1101","next":"us/43-cfr-4.1103"},"notice":"GroundRules: Original legal text. Not legal advice."}
