{"data":{"id":"us/43-cfr-404.33","jurisdiction":"us","citation":"43 CFR 404.33","heading":"How much Federal funding can Reclamation provide for the completion of a feasibility study?","body":"In general, Reclamation will be responsible for 50 percent of the cost of a feasibility study conducted under § 404.11(a) or (b). You will be responsible to pay for the remaining 50 percent of the cost of the study using non-Federal funding.","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER I—BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR","PART 404—RECLAMATION RURAL WATER SUPPLY PROGRAM","Subpart B—Cost-Sharing"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"d4491490bcca34139f1035950242dfffc6fdc561f5a73925f35b76faf69dea88","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-404.32","next":"us/43-cfr-404.34"},"notice":"GroundRules: Original legal text. Not legal advice."}
