{"data":{"id":"us/43-cfr-404.35","jurisdiction":"us","citation":"43 CFR 404.35","heading":"Is there a different non-Federal cost-share requirement for feasibility studies that involve a community greater than 50,000 inhabitants?","body":"Yes. If the feasibility study involves a rural water supply system that will serve a community with a population in excess of 50,000 inhabitants, pursuant to the exception provided in § 404.8, you may be required to pay more than 50 percent of the costs of the study. Determination of the appropriate amount of the non-Federal cost-share will be based on the same criteria used to evaluate your capability to pay the non-Federal share of construction costs, set forth in § 404.39.","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER I—BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR","PART 404—RECLAMATION RURAL WATER SUPPLY PROGRAM","Subpart B—Cost-Sharing"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"3d8899f8a6f6d584c96125ad2125cb6fc7fa6481d93488f3789f7fc7d70f4e80","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-404.34","next":"us/43-cfr-404.36"},"notice":"GroundRules: Original legal text. Not legal advice."}
