{"data":{"id":"us/43-cfr-404.47","jurisdiction":"us","citation":"43 CFR 404.47","heading":"How will a feasibility study be conducted under this program?","body":"Feasibility studies will be conducted in accordance with Reclamation's standards governing the approach, process and content of the feasibility study, including the Principles and Guidelines (incorporated by reference at § 404.4). You can obtain information about Reclamation's standards and requirements for conducting feasibility studies by contacting your local Reclamation office.","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER I—BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR","PART 404—RECLAMATION RURAL WATER SUPPLY PROGRAM","Subpart D—Feasibility Studies"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"9e93ec9674fa9ffbd2d3fc51b415b376635e33a0bec644500a617a7dec8e0cd6","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-404.46","next":"us/43-cfr-404.48"},"notice":"GroundRules: Original legal text. Not legal advice."}
