{"data":{"id":"us/43-cfr-404.58","jurisdiction":"us","citation":"43 CFR 404.58","heading":"Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006 have to comply with the requirements in this rule?","body":"No. Neither the Act nor this rule imposes any additional requirements on rural water supply projects that were authorized for construction before the date of enactment of the Act.","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER I—BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR","PART 404—RECLAMATION RURAL WATER SUPPLY PROGRAM","Subpart E—Miscellaneous"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"7215a6d329bcb24688b6615ed098880fbc7d8adbb1ba54b70672278821fdc9fe","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-404.57","next":"us/43-cfr-404.59"},"notice":"GroundRules: Original legal text. Not legal advice."}
