{"data":{"id":"us/43-cfr-418.23","jurisdiction":"us","citation":"43 CFR 418.23","heading":"Diversion of Rock Dam Ditch water.","body":"Project water may be diverted directly to Rock Dam Ditch from the Truckee Canal only when diversions cannot be made from the outlet works of Lahontan Reservoir. Such diversions will require the prior written approval of the Bureau and be used in calculating Project diversions.","path":["Title 43—Public Lands: Interior","Subtitle B—Regulations Relating to Public Lands","CHAPTER I—BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR","PART 418—OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-43.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"1f8c887863a78e98e5dc90ebf25cfed2bf34c39e8260bef4e17afcbf3998832a","source_id":"us-cfr","stale":true,"prev":"us/43-cfr-418.22","next":"us/43-cfr-418.24"},"notice":"GroundRules: Original legal text. Not legal advice."}
