{"data":{"id":"us/43-u.s.c.-390h-12a","jurisdiction":"us","citation":"43 U.S.C. § 390h–12a","heading":"North San Diego County Area Water Recycling Project","body":"(a) AuthorizationThe Secretary, in cooperation with the appropriate State and local authorities, is authorized to participate in the design, planning, and construction of the North San Diego County Area Water Recycling Project, consisting of projects to reclaim and reuse water within service areas of the San Elijo Joint Powers Authority, the Leucadia County Water District, the City of Carlsbad, and the Olivenhain Municipal Water District, California. (b) Cost shareThe Federal share of the cost of a project described in subsection (a) shall not exceed 25 percent of the total cost. (c) LimitationThe Secretary shall not provide funds for the operation or maintenance of a project described in subsection (a).","path":["Title 43—PUBLIC LANDS","CHAPTER 12—RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT"],"source_url":"https://uscode.house.gov/download/releasepoints/us/pl/119/103/xml_usc43@119-103.zip","current_through":"Public Law 119-103 (09/02/2026)","vintage":"","retrieved_at":"2026-09-10T06:00:36Z","sha256":"1be4a77b4af978a7cdb6f93e051ce0c9a26be1364db6fd95fba2d33f05f19ddb","source_id":"us","stale":true,"prev":"us/43-u.s.c.-390h-12","next":"us/43-u.s.c.-390h-12b"},"notice":"GroundRules: Original legal text. Not legal advice."}
